How electricity works in Barbados.
Barbados electricity 2026: BL&P integrated utility, FTC tariffs and fuel clause, solar feed-in rider, 100 MW solar cap, ELPA licensing, 100% renewable 2030 goal.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Barbados dollar (BBD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Barbados energy at a glance.
Key figures for households in Barbados. Each one links to its source on the full overview below.
Electricity price.
0.598 BBD per kWh for households, including taxes. Figures for September 2026.
Household use.
3,000 kWh a year for a typical household. Figures for 2026.
Renewable share.
9% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Barbados.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Barbados below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Barbados requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Barbados.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Barbados, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Barbados, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Barbados.
The energy market in Barbados, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Barbados has one small, isolated island grid with no links to any other country. The Barbados Light & Power Company Limited (BL&P or BLPC), part of the Canadian Emera group, generates most of the island’s electricity, owns and runs the transmission and distribution network, reads the meters and bills every customer. It also buys power from independent producers and from customers with rooftop solar. The Fair Trading Commission (FTC) regulates BL&P’s tariffs, fuel charge, grid code and service standards. The Ministry of Energy, Business Development and Consumer Affairs issues the licences required under the Electric Light and Power Act and sets energy policy.
Electricity is generated mainly from imported oil. Ember data put 2024 generation at 1.11 TWh, of which oil produced 88%, gas 3% and solar 9%. In March 2026 BL&P said 80% of its electricity is made from fuel bought on the international market. That fuel cost reaches households through a Fuel Clause Adjustment (FCA) that changes monthly; in September 2026 it was 37.5 Barbados cents per kWh, more than the base energy charge itself. An average household using 250 kWh a month pays about BBD 0.60 per kWh before VAT.
The national target in the Barbados National Energy Policy 2019–2030 is 100% renewable energy and carbon neutrality by 2030. Rooftop solar has grown quickly under a feed-in “Renewable Energy Rider” that pays a fixed rate set by the FTC for 20 years, but BL&P states that the grid has reached a 100 MW limit for solar PV and that new renewable applications are temporarily paused. A 2024 grid code amendment now covers battery storage connected at 24.9 kV and below.
Energy snapshot.
Headline figures for electricity in Barbados. Each shows its data year and links to its source.
- Population282,623 peopleSource 332025
- Households95,000 householdsSource 292020
- Average household size2.85 people/householdSource 292020
- Electricity use per household3,000 kWh/yrSource 32026
- Household price (BBD)0.598 BBD/kWhSource 1September 2026
- Household price (EUR)0.267 EUR/kWhSource 38September 2026
- Renewable electricity share9%Source 392024
- Solar capacity0.069 GWSource 422025
- Wind capacity0.001 GWSource 432025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Fair Trading Commission (FTC), Utility Regulation Division
- System operator
- Barbados Light & Power Company Limited (BL&P), the public utility, which dispatches the island grid
- Distribution networks
- One island-wide transmission and distribution network owned and operated by BL&P; no other distribution companies
- Currency
- Barbados dollar (BBD)
- Voltage and frequency
- 50 Hz; single-phase 2- or 3-wire domestic services up to 200 A (secondary voltages set in BL&P’s installation requirements booklet)
Electricity prices in Barbados.
- Household price (BBD)
- 0.598 BBD/kWh (September 2026)Source 1Derived for a 250 kWh month on the Domestic Tariff: customer charge BBD 12 (151–500 kWh band) + base energy BBD 43.60 (150 kWh at 0.160 and 100 kWh at 0.196) + Fuel Clause Adjustment of 37.5253 cents/kWh for September 2026 (BBD 93.81) = BBD 149.41, i.e. BBD 0.598/kWh. Excludes VAT, because the current VAT treatment of the first 250 kWh could not be verified (standard rate 17.5%; a reduced 7.5% rate on the first 250 kWh was confirmed by BL&P to 30 September 2023). Excludes the 10% prompt-payment discount on non-fuel charges.
- Household price (EUR)
- 0.267 EUR/kWh (September 2026)Source 38Converted from BBD 0.598/kWh at BBD 2.2412 per euro: the ECB reference rate of USD 1.1206 per euro on 9 October 2026 multiplied by the official rate of BBD 2.00 per US dollar (World Bank, PA.NUS.FCRF). Excludes VAT.
- Typical annual electricity bill
- 1,793 BBD/yr (September 2026 rates)Source 1Derived: the 250 kWh monthly bill of BBD 149.41 (before VAT and prompt-payment discount, at the September 2026 FCA) × 12. The FCA changes monthly, so this is indicative.
Household price trend (BBD per kWh).Source 2
| 2026-02 | 0.512 BBD/kWh |
|---|---|
| 2026-03 | 0.581 BBD/kWh |
| 2026-05 | 0.62 BBD/kWh |
| 2026-06 | 0.62 BBD/kWh |
| 2026-07 | 0.62 BBD/kWh |
| 2026-08 | 0.598 BBD/kWh |
| 2026-09 | 0.598 BBD/kWh |
A Barbadian household bill has three regulated parts: a small monthly customer charge, a stepped base energy charge that covers BL&P’s non-fuel costs, and the fuel charge, which passes through the cost of fuel and of energy bought from other producers with no mark-up. Base rates change only after a rate review before the FTC. BL&P filed for an 11.9% increase on 4 October 2021, its first base-rate application since 2010; the FTC approved interim rates at half the requested level from 16 September 2022, pending a final determination. The tariff schedules BL&P publishes in 2026 are still dated 16 September 2022.
Fuel drives the bill
Because almost all generation burns imported oil, the FCA usually makes up more than half of a domestic bill. At 250 kWh in September 2026 the fuel charge was about BBD 94 of a BBD 149 pre-VAT bill. BL&P said the rise in world oil prices in early 2026 pushed the FCA from 29.0 to 35.8 cents/kWh between February and March, adding about BBD 17 to an average household’s bill. In mid-2022 the FCA reached almost 50 cents/kWh.
VAT
Electricity bills attract VAT; BL&P’s published service charges carry the standard 17.5%. From August 2022 the Government charged 7.5% instead of 17.5% on the first 250 kWh of residential bills, a relief BL&P confirmed was extended to 30 September 2023. Whether that relief still applies in 2026 could not be confirmed from an official page, so the prices quoted here exclude VAT.
Other cost changes
In 2026 the FTC approved BL&P’s request to keep about 11 MW of temporary generation running through 2027 and to add 6 MW more. BL&P estimates the extra capacity adds about 0.4 cents/kWh, roughly BBD 1.25 on an average monthly bill, from no earlier than September 2026.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Domestic Tariff (dated 16 September 2022). Monthly customer charge of BBD 7 (0–150 kWh), BBD 12 (151–500 kWh) or BBD 17 (over 500 kWh), set by the customer’s average 30-day use over the previous 12 months. Base energy charge: BBD 0.160/kWh for the first 150 kWh, 0.196 for the next 350, 0.225 for the next 1,000 and 0.254 above 1,500 kWh. A Fuel Charge equal to the monthly Fuel Clause Adjustment is added per kWh. A 10% discount on the customer and base energy charges (not the fuel charge) applies if the bill is paid within 15 days. |
| Variable | Yes | The Fuel Clause Adjustment (FCA) is recalculated monthly from the previous month’s fuel and purchased-energy costs (including renewable energy bought from customers and IPPs), plus any cumulative over- or under-recovery, divided by the previous month’s kWh sales. It was 28.9949 cents/kWh in February 2026, 35.8256 in March, 39.75 from May to July and 37.5253 in August and September 2026. |
| Time-of-use | Limited | A Time-of-Use Tariff exists only as a pilot for customers who qualify for the Large Power tariff (billing demand of at least 50 kVA), limited to 30 services. On-peak is 10:00–21:00 Monday to Friday; base energy is BBD 0.2190/kWh on-peak and 0.0620 off-peak, and the fuel charge is 1.12 × FCA on-peak and 0.92 × FCA off-peak. There is no residential time-of-use tariff. |
| Dynamic | No | There is no wholesale market or retail competition, so no dynamic or spot-indexed tariff exists. |
| Prepayment | No | No prepayment tariff appears among BL&P’s published residential tariffs. Domestic bills are issued monthly and may be disconnected if unpaid 21 days after issue. |
Household prices compared with neighbouring countries (EUR per kWh).
- Grenada€0.465
- Saint Lucia€0.407
- Dominica€0.295
- Barbados€0.267
- Martinique€0.19
- Trinidad and Tobago€0.056
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,000 kWh/yr (2026)Source 3Derived: BL&P’s “average household using 250 kilowatt hours” a month (March 2026) × 12.
- Average daily use per household
- 8.2 kWh/day (2026)Source 3Derived: 250 kWh a month × 12 ÷ 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 3,930 kWh/person/yr (2024)Source 41All sectors (Ember via Our World in Data, 3,929.5 kWh), including tourism and commerce.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
An average Barbadian household uses about 250 kWh a month, according to BL&P, or roughly 3,000 kWh a year. The climate is warm and humid all year, so cooling, refrigeration and lighting dominate household use; there is no heating season. Cooking is mostly done with LPG or piped natural gas rather than electricity, and solar water heaters are long established, which the National Energy Policy cites as an early renewable success.
Total demand is small. Ember records 1.11 TWh of generation in 2024, and the ETIP projects electricity demand rising from 1,021 GWh in 2020 to 1,194 GWh in 2040, with hotels and restaurants growing from 123 GWh to 184 GWh. Per-capita consumption across all sectors is about 3,900 kWh, raised by tourism.
Electric vehicles are at an early stage. BL&P’s guidance estimates an EV uses 2,200–2,900 kWh a year and notes public chargers run by Megapower Ltd at locations around the island. The ETIP expects EVs to become cost-competitive by 2030 and calls for smart charging to reduce curtailment of solar.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 85.7% (2021 census)Source 32Derived: separate (detached/undivided) houses as a share of occupied dwelling units enumerated (52,811 of 61,627, Table 10.01). Indicative only, given the census undercount.
- Apartments and flats
- 10.8% (2021 census)Source 32Derived: government terrace units/apartments (2,146), private apartments (4,151) and condominiums (371) as a share of occupied dwelling units enumerated (6,668 of 61,627). Indicative only.
- Urban population
- 59.7 % of population (2025)Source 35World Bank series SP.URB.TOTL.IN.ZS.
Barbadian housing is dominated by single, separate houses: in the dwellings enumerated in the 2021 census, about 86% of occupied units were detached or undivided houses and about 11% were apartments or condominiums. Domestic service is limited to individually metered homes occupied all year as a principal residence; villas, guest-houses and other short-stay lets are billed on business tariffs.
Housing statistics are weak. The 2021 Population and Housing Census was disrupted by COVID-19, enumerator attrition and the abandonment of the household listing, and the Statistical Service reports a 48.7% undercount. Government planning documents instead use about 95,000 households (2020) with an average of 2.85 people.
How the grid works in Barbados.
- TransmissionBarbados Light & Power Company Limited (BL&P), Barbados Light & Power Company Limited (BL&P)
- DistributionOne island-wide transmission and distribution network owned and operated by BL&P; no other distribution companies
- MeteringBarbados Light & Power Company Limited (BL&P)
- Supply1 or more retail suppliers
Power flows from BL&P’s oil- and gas-fired plants at Spring Garden (low-speed diesel engines, steam turbines and a gas turbine), the gas turbines at Garrison and Seawell, the 33 MW Clean Energy Bridge diesel plant and the Trents solar farm in St Lucy, and from independent and customer-owned solar. The ETIP gives total installed capacity of 360 MW in 2022. Transmission lines carry power to 18 substations, from which about 2,800 km of overhead distribution lines feed homes and businesses. Critical loads such as the Queen Elizabeth Hospital, the airport, the port and Bridgetown are fed by underground cables directly linked to a power station.
Commercially, the system is a single integrated utility. BL&P buys energy from independent producers and rooftop owners at FTC-set feed-in rates, and passes the cost through the Fuel Clause Adjustment. There is no wholesale market and no retail choice. Because the grid is isolated, BL&P must keep enough local generation available at all times; this is the reason it gave for keeping 11 MW of temporary generation and adding 6 MW more through 2027.
The legal framework, the Electric Light and Power Act 2013 (CAP. 278) as amended in 2015 and 2019, separates generation, storage, transmission and distribution, dispatch and sales into distinct, non-exclusive licences issued by the Minister. This allows independent generators and storage operators, but BL&P remains the only network owner and supplier.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy, Business Development and Consumer Affairs (Energy Division) | Sets energy policy (Barbados National Energy Policy 2019–2030) and, through the Minister, issues generation, storage, transmission and distribution, dispatch and sales licences under the Electric Light and Power Act. Runs the online ELPA licensing system and the household “Right to Renewable Energy” registration. |
| Regulator | Fair Trading Commission (FTC) | Its Utility Regulation Division regulates electricity, telecoms and water. It sets BL&P’s base rates (interim rates since 16 September 2022), oversees the Fuel Clause Adjustment, sets feed-in rates under the Renewable Energy Rider, approves the grid code and sets guaranteed and overall Standards of Service (2023–2025 decision). |
| System operator | Barbados Light & Power Company Limited (BL&P) | The public utility, an Emera affiliate. Generates most electricity from four power stations (the Spring Garden, Garrison and Seawell fossil-fuel plants and the Trents solar farm in St Lucy) plus the 33 MW Clean Energy Bridge diesel plant at Trents, dispatches the island grid and buys power from independent producers and customer-generators. |
| TSO | Barbados Light & Power Company Limited (BL&P) | Owns and operates 150.2 km of transmission cables and lines and 18 substations, 12 of them fully underground-connected with redundant transmission links. |
| DSO | Barbados Light & Power Company Limited (BL&P) | Owns and operates about 2,800 km of overhead distribution lines on roughly 77,000 poles, plus about 30,000 streetlights. Distributed generation connects at 24.9 kV and below under the BL&P grid code. |
| Supplier | Barbados Light & Power Company Limited (BL&P) | The only retail supplier. Bills all domestic and business customers on FTC-approved tariffs. |
| Metering | Barbados Light & Power Company Limited (BL&P) | Supplies, installs and reads all revenue meters. Customers provide the meter socket base for services up to 200 A. BL&P is deploying Landis+Gyr AMI smart meters. |
| Regulator | Government Electrical Engineering Department (GEED) | Inspects electrical installations and issues the Certificate of Approval needed before BL&P will connect a new service, reconnect one off for more than six months or connect a renewable system. Approves single-line diagrams for solar installations. |
Compared with the UK system.
| UK concept | Barbados equivalent | How it works |
|---|---|---|
| DNO | Barbados Light & Power (BL&P) | There is one network for the whole island, owned and run by BL&P, which is also the generator, supplier and meter operator. No separate distribution companies exist. |
| National Grid/NESO | BL&P as public utility and dispatcher | BL&P owns the transmission system and dispatches generation. The 2019 amendment to the Electric Light and Power Act created a separate dispatch licence and defines the “system operator” as its holder, and requires a dispatch code alongside the grid code, but in practice the utility runs the system. There are no interconnectors. |
| MPAN | BL&P Account ID | There is no national supply-point register or standard identifier. A home is identified by the 10-digit Account ID that BL&P assigns to the customer’s electricity service and prints on every bill, together with the service address and meter number. |
| MPRN | No equivalent for gas meters in this profile | Piped natural gas and LPG are supplied separately; no public gas supply-point identifier scheme was identified. |
| Meter operator | BL&P | BL&P owns, installs and reads the meter; the customer supplies the socket base for services up to 200 A. There is no competitive metering market. |
| Supplier | BL&P (sole supplier) | Households cannot switch supplier. A sales licence exists in law, but no competing retailer serves households. |
| Smart-meter infrastructure | BL&P Advanced Metering Infrastructure (AMI) | Unlike the UK’s DCC, the network is run by the utility itself: Landis+Gyr meters with low-power radios send encrypted data to BL&P for remote reading. Coverage figures are not published. |
How a supply point is identified.
4402718356 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | BL&P Account ID (Account ID) |
| Who issues it? | Barbados Light & Power Company Limited (BL&P) |
| Format | Numeric customer account number assigned by BL&P to each electricity service, shown as “Account ID” on the bill. BL&P’s sample bill uses a 10-digit number. |
| Length | 10 digits (as shown on BL&P’s sample domestic bill) |
| Stays with the property when you switch supplier? | No |
| Where to find it | Printed as “Account ID” at the top of every BL&P bill and on the payment stub, alongside the service address and the meter reading section with its read codes (E estimate, I interim, R regular, C customer, V verified). |
| Electronic access | Customers can view accounts, bills and payments through BL&P’s web self-service portal (myaccount.blpc.com.bb). No open data or consumer data-sharing scheme exists. |
| Third-party access | No regulated third-party data access route exists. Installers and others obtain consumption history from the customer’s own bills; a current BL&P bill must be supplied with a household renewable energy registration. |
| Who keeps the register | BL&P’s own customer information and billing system; there is no independent registry or data hub. |
| Register scope | National |
Barbados has no national metering-point register like the UK’s MPAN system. BL&P is the only supplier and network operator, so it identifies supply points within its own billing system. The identifier a customer sees is the Account ID on the bill, which BL&P’s sample domestic bill shows as a 10-digit number. Each bill also carries a tax invoice number, the service address and the meter readings.
The account is tied to the customer as well as the premises. New customers must apply with government ID (passport, ID card or driver’s licence) and, unless they are Barbadian citizens applying for a residential service, pay a security deposit of about three months’ bills. BL&P asks customers to tell it when they leave or sublet a property, otherwise they stay liable for charges in their name; a new occupier opens their own account. A reconnection or transfer of service below 200 A costs BBD 20 plus VAT.
Physical connection depends on a Government Electrical Engineering Department (GEED) inspection. BL&P will not energise a new service, reconnect one off for more than six months or connect altered wiring without a GEED Certificate of Approval. A new service below 200 A costs BBD 50 plus VAT.
Because there is one supplier, the account number is used mainly for billing, payments and applications rather than switching. The household renewable energy registration, BL&P’s interconnection application and its feed-in agreement all refer to the customer’s BL&P account.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Fixed feed-in tariff set by the FTC under BL&P’s Renewable Energy Rider, held for 20 years from commissioning (rates effective 1 January 2023: 34.25 cents/kWh for solar up to 10 kW) |
| Can new systems connect now? | BL&P states that, because of a grid capacity limit of 100 MW of solar PV, there is a temporary pause on renewable applications. |
| What is the maximum size under the Renewable Energy Rider? | The rider is for customer-generators of no more than 500 kW, available first come, first served up to a combined 20 MW. Separate FTC rates exist for 1–5 MW systems. |
| How is energy credited? | Two options: “Buy all/sell all”, where all consumption is billed at the normal tariff and all generation is credited at the rider rate; or “Sale of excess”, where only exported surplus is credited. Systems over 3 kW must use buy all/sell all. |
| What are the feed-in rates? | From 1 January 2023: solar up to 10 kW 34.25 cents/kWh, 10–100 kW 35.75, 100–250 kW 34.75; wind up to 10 kW 36.75, 10 kW–1 MW 45.75. For 1–5 MW plants in 2023: solar 26.75 and wind 26.25 cents/kWh. |
| How are credits paid? | Credits are applied to the bill, and BL&P refunds credit balances quarterly once they reach BBD 100. |
| How long does the contract last? | Twenty years from the system’s commissioning date, after which it ends unless the customer asks for an extension. The customer may not modify the system or metering without BL&P’s written consent. |
Connecting a home system.
- Design the system and prepare a single-line diagram (pre-approved diagrams are available for household systems).
- For a household system up to a cumulative 10 kW(ac), register through the Ministry of Energy’s “Householders’ Right to Renewable Energy” form to obtain a Right to Renewable Energy certificate; larger or commercial systems apply for a licence through the online ELPA system (apps.energy.gov.bb).
- Obtain GEED approval of the single-line diagram and, after installation, a GEED Certificate of Approval.
- Apply to BL&P for interconnection with the Ministry certificate or licence, GEED approval, voltage/frequency ride-through settings and proof of insurance (at least BBD 100,000 up to 10 kW; BBD 500,000 above).
- For systems of 150 kW and above, BL&P carries out a Connection Impact Assessment.
- Sign and witness the feed-in tariff agreement under the Renewable Energy Rider; BL&P fits the metering and starts crediting exports.
Barbados pays households a fixed feed-in rate rather than netting exports against consumption. Under BL&P’s Renewable Energy Rider, approved by the FTC, a customer with solar, wind or a hybrid system sells power to BL&P at the FTC rate while buying power at the normal tariff. Most systems use “buy all/sell all”: every kWh generated is credited at the rider rate and every kWh consumed is billed, which for small solar systems currently values generation at 34.25 cents/kWh. Only systems of 3 kW or less may choose to export just their surplus.
Connection rights come from the licensing law, not the utility. Householders have a statutory route to register up to 10 kW(ac) of renewable capacity with the Ministry; anything larger requires an ELPA licence, and at least 30% of each licensed renewable project must be Barbadian-owned. BL&P then checks grid capacity and the technical settings before connecting.
The main constraint is capacity on a small isolated grid. BL&P says solar has reached a 100 MW limit and has paused new renewable applications. The November 2024 grid code amendment for battery energy storage connected at 24.9 kV and below is intended to support further solar alongside storage.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Generation licence required to generate wholly or partly to supply another person; exempt where cumulative installed capacity supplying the grid does not exceed the First Schedule threshold. Households up to a cumulative 10 kW(ac) use the Right to Renewable Energy registration instead of a licence; larger systems apply via ELPA. | Minister responsible for energy (Ministry of Energy, Business Development and Consumer Affairs) | Electric Light and Power Act 2013, s.3 as replaced in 2019. Applications for plants at or above a second threshold, and by the public utility, must be advertised twice in two daily newspapers. At least 30% Barbadian ownership is required for renewable projects. |
| Store electricity | Storage licence required to store electricity for supply to the public grid; not required where the person’s generation is itself licence-exempt, or in other cases the Minister prescribes by Order. | Minister responsible for energy | Introduced by the 2019 amendment. Storage licence applications must be advertised. Behind-the-meter storage that does not supply the grid is outside the licence requirement. BESS connection rules are in the November 2024 grid code amendment. |
| Export to the grid | Ministry certificate (≤10 kW household) or licence, GEED approval and a signed Renewable Energy Rider agreement with BL&P. | Ministry of Energy; GEED; BL&P; FTC (rates) | New renewable applications temporarily paused by BL&P at the 100 MW solar limit. |
| Sell / supply electricity | Sales licence required to offer for sale or sell electricity. | Minister responsible for energy | Selling to the public utility under a feed-in agreement is the normal route for small generators. BL&P is the only supplier to households. |
| Transmit and distribute | Transmission and distribution licence required. | Minister responsible for energy | Held by BL&P; applications must be advertised. |
| Dispatch / system operation | Dispatch licence required; the holder is the “system operator” and must issue a dispatch code approved by the FTC and the Chief Electrical Officer. | Minister responsible for energy; FTC | Not required for a person who only sells electricity to the public utility. |
| Aggregate / VPP / remote control of assets | No specific licence category or market exists for aggregation or virtual power plants. | None | Any aggregator that sold electricity would fall under the sales licence; none is identified. |
| Wholesale trading / balancing / grid services | No wholesale or balancing market exists. | None | BL&P procures energy and reserves internally. The only demand-side product is the Interruptible Service Rider for large customers. |
Licensing in Barbados is set by the Electric Light and Power Act 2013 (CAP. 278), amended in 2015 and 2019. The 2019 amendment replaced a single licensing provision with five separate, non-exclusive licences issued by the Minister: generation, storage, transmission and distribution, dispatch and sales. Operating without the required licence is an offence carrying a fine of up to BBD 100,000 and two years’ imprisonment, plus BBD 10,000 a day for continuing offences. Fees are set by the Electric Light and Power (Fees) Regulations 2017.
Since 1 February 2022 all ELPA applications go through the Ministry’s online system, with payment by EZPay+. The Ministry passes technical documents to GEED and to BL&P, which assesses grid capacity and prepares any Connection Impact Assessment; planning permission from the Town and Country Development Planning Office is a separate process where required. Households have a lighter route: a one-session online registration for up to 10 kW(ac), giving a Right to Renewable Energy certificate.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Interruptible Service Rider | Restricted | Billing demand over 300 kVA, with at least 100 kVA interruptible | No | BL&P. An opt-in rider for Secondary Voltage Power and Large Power customers who agree to have load interrupted. Limited to 20 customers with a combined 10,000 kVA; time-of-use customers are not eligible. |
| Frequency response / reserves | No | — | No | BL&P. Reserves are provided by BL&P’s own generation (including temporary units). No market or tender for third-party ancillary services exists. |
| Battery energy storage connected to the grid | Developing | — | No | BL&P / Ministry of Energy. A storage licence exists in law and the grid code has a November 2024 amendment for BESS at 24.9 kV and below providing energy services to the grid. No published compensation scheme for household batteries was found. |
Barbados has no flexibility market. BL&P plans and dispatches the whole system and buys power under fixed tariffs, so there is no route for households or aggregators to sell flexibility or grid services. The only demand-response product is the Interruptible Service Rider for large customers. The ETIP recommends a demand-flexibility assessment and smart EV charging, and the 2019 law and 2024 grid code amendment create a framework for grid-connected storage.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | BL&P Advanced Metering Infrastructure project under way; no published coverage figure |
| Reading interval | Not published |
| Meter owner | BL&P (customer supplies socket base up to 200 A) |
| Technology | Landis+Gyr smart meters with 1-watt radios |
| Radio use | About 45 seconds of transmission per day on average |
| Security | Encrypted data, described by BL&P as similar to banking |
| Domestic reading cycle (tariff) | Normally read every other month, billed monthly with estimates |
Smart metering in Barbados is a utility project, not a national programme. BL&P’s Advanced Metering Infrastructure uses Landis+Gyr meters that communicate by low-power radio, giving remote reading for actual monthly bills, faster service and new energy-management services. BL&P does not publish the number installed or the share of customers covered.
Its Domestic Tariff, dated 2022, still says domestic meters are normally read every other month with estimated bills in between, and bills show read codes for estimated, interim, regular, customer and verified reads. There is no independent data hub and no regulated access to meter data for third parties.
Renewable electricity.
Electricity generation mix (2024).
- Oil: 88.3%
- Solar: 9%
- Gas: 2.7%
- Renewable electricity share
- 9% (2024)Source 39Ember data via Our World in Data: solar 9.01% of 1.11 TWh; no wind, hydro or bioenergy generation recorded. Barbados has no interconnection, so generation and consumption shares are the same. The ETIP gives 9% solar and 91% fossil fuels for 2022.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV
- 0.069 GW (2025)Source 42IRENA; BL&P cites a 100 MW solar limit already reached.
- Wind
- 0.001 GW (2025)Source 43
- Total installed capacity (all sources)
- 0.36 GW (2022)Source 29
Targets.
- 100% renewable energy and carbon neutrality by 2030 (Barbados National Energy Policy 2019–2030)
- Net-zero emissions pathway to 2035 modelled in the Energy Transition & Investment Plan, including 180 MW of new solar and 160 MW of onshore wind
Solar is effectively the only renewable source of electricity. Ember data show its share rising from 3.8% of generation in 2019 to 9.0% in 2024, almost all from rooftop and commercial systems paid under the Renewable Energy Rider plus BL&P’s Trents solar farm in St Lucy (44,496 panels on 42 acres). Wind contributes very little so far. BL&P’s planned Lamberts wind farm in St Lucy, with five Enercon turbines, would supply about 3.4% of annual electricity needs.
The 2030 target of 100% renewable energy remains national policy, but progress has been slowed by grid limits: BL&P says solar has reached a 100 MW ceiling and has paused new applications. The ETIP’s net-zero scenario relies on more solar and wind, batteries, hydrogen and some gas, with EVs charged smartly to absorb midday solar.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is recognised in law and in the grid code but is not yet widespread. Since 2019 a storage licence is required to store electricity for supply to the public grid, except where the owner’s generation is itself licence-exempt. The November 2024 grid code amendment sets technical rules for batteries supplying energy to the grid. The ETIP expects battery storage to balance higher solar and wind shares but also stresses using EV charging and other flexible demand to limit storage costs.
Storage projects.
- Grid code BESS amendment: November 2024 amendment to the BL&P grid code covering battery energy storage systems connected at 24.9 kV and below providing energy services to the grid.
- Energy Smart Fund II: IDB-backed programme that includes promoting technologies such as energy storage and smart grids that allow more renewable energy on the grid.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Barbados Light & Power Company Limited (BL&P) | Sole retail supplier | No | Limited | No | Yes |
BL&P is the only electricity supplier. Its tariffs are Domestic, General Service, Secondary Voltage Power, Large Power and a pilot Time-of-Use tariff, with riders for renewable generation and interruptible load. Time-of-use is limited to large customers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy, Business Development and Consumer Affairs | Government | Energy policy and ELPA licensing | Issues generation and storage licences and household renewable energy certificates, and publishes the National Energy Policy and ETIP. |
| Fair Trading Commission (FTC) | Regulator | Utility regulator | Sets electricity rates, the fuel clause, feed-in rates, standards of service and approves the grid code. |
| Barbados Light & Power Company Limited | Distribution | Integrated public utility | Generator, network owner, system operator, meter operator and only supplier. |
| Smart Energy Barbados | Renewable Energy | Government smart energy programme portal | Hub for the Ministry’s Energy Smart Fund and public-sector smart energy programmes. |
| Barbados Statistical Service | Government | National statistics office | Publishes the Population and Housing Census used for household and dwelling data. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (distributed generation) | BL&P Grid Code (FTC-approved, March 2017) | BL&P, approved by the FTC | Technical, planning and operational requirements for distributed generation of any size connecting at 24.9 kV and below, including inverter-based systems. |
| Battery storage | Grid Code Battery Storage amendment (November 2024) | BL&P, approved by the FTC | Covers BESS connecting at 24.9 kV and below providing energy services to the grid. |
| Inverter ride-through | Voltage and frequency ride-through (VFRT) settings | BL&P | Required as part of every interconnection application. |
| Electrical installation approval | GEED Certificate of Approval and single-line diagram approval | Government Electrical Engineering Department | Required for new services, reconnections after six months and renewable systems. |
| Service and metering | “Information and Requirements Covering Installation of Electric Services and Meters” | BL&P | Customer-supplied 5-jaw meter socket bases for 3-wire services up to 200 A, mounted about 1,675 mm above grade and accessible to BL&P at all times. |
| Installer training | Level 1 National Vocational Qualification in solar PV installation | Developed under the DREAM project (Ministry of Energy, UNDP/GEF) | An entry-level qualification; no mandatory installer accreditation scheme was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Right to Renewable Energy certificate (household ≤10 kW(ac)) | Yes | National | Online registration with the Ministry of Energy; needs ID, a current BL&P bill, system details and a single-line diagram. |
| ELPA licence (above 10 kW or commercial) | Limited | National | Applied for through the online ELPA system. BL&P lists a Ministry licence for residential systems of 10 kW or more and commercial systems over 25 kW. |
| GEED approval | Yes | National | Single-line diagram approval and a Certificate of Approval after inspection. |
| BL&P interconnection and feed-in agreement | Yes | National | Signed Renewable Energy Rider agreement and proof of insurance; Connection Impact Assessment for 150 kW and above. New applications currently paused. |
| Planning permission | Limited | National | Handled separately by the Town and Country Development Planning Office where needed; ground-mounted systems must submit site plans and elevations. |
Permissions are national; Barbados has no regional tier. A typical rooftop system needs a Ministry registration, GEED electrical approval and a BL&P agreement. Ground-mounted and larger systems may also need planning approval and further assessments.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Renewable Energy Rider feed-in tariff | Active | Feed-in tariff | FTC-set rates paid by BL&P for 20 years: 34.25 cents/kWh for solar up to 10 kW, 35.75 for 10–100 kW and 34.75 for 100–250 kW (effective 1 January 2023). Existing contracts continue, but BL&P has temporarily paused new renewable applications because of the 100 MW solar limit. | — |
| Energy Smart Fund II (Sustainable Energy Investment Programme) | Active | Financing and technical assistance | IDB-financed programme (status “Implementation” on the Ministry’s page) offering financing instruments and technical assistance for renewable energy and energy-efficiency projects, and promoting storage and smart grids. | — |
Data and connectivity.
- Fixed broadband
- 37.5 fixed subscriptions per 100 people (2022)Source 37
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use is widespread: the World Bank (ITU data) records 70.4% of people using the internet in 2024 and 37.5 fixed broadband subscriptions per 100 people in 2022. BL&P’s smart meters use their own low-power radio network rather than public mobile networks, and customers manage their accounts through BL&P’s online portal.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 1.11 TWh (2024)Source 40Total generation (Ember). With no imports, generation equals supply.
- Generation capacity
- 0.36 GW (2022)Source 29
- Interconnection
- 0 GWSource 17BL&P: Barbados operates an isolated grid with no external back-up supply.
- Curtailment
- Not identified from a reliable public source.
The grid is small, isolated and fossil-heavy. With no interconnection, BL&P must keep enough firm generation available at all times, which is why it has relied on temporary rental units since 2024. Solar output is concentrated at midday on a system with about 1.1 TWh of annual demand, and BL&P says solar has reached a 100 MW connection limit. Critical sites such as the main hospital, airport and port are fed by underground cables linked directly to a power station.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Pause on new renewable applications | Current | In effect at October 2026 | BL&P states that, due to a grid capacity limit of 100 MW of solar PV, there is a temporary pause on renewable applications. |
| Additional temporary generation approved | Current | June 2026 (cost impact from September 2026 at the earliest) | The FTC allowed about 11 MW of temporary generation in place since 2024 to run through 2027 and approved 6 MW more, estimated by BL&P at about 0.4 cents/kWh. |
| Grid code amendment for battery storage | Current | November 2024 | Adds requirements for battery energy storage systems connecting at 24.9 kV and below and providing energy services to the grid. |
| Online ELPA licensing system | Current | 1 February 2022 | All licence applications under the Electric Light and Power Act are made and paid for online; email applications were discontinued. |
| BL&P rate review – interim rates | Current | 16 September 2022 | The FTC approved interim rates at 50% of BL&P’s requested increase pending a final determination; the published tariff schedules are still dated 16 September 2022. |
| 100% renewable energy target | Upcoming | 2030 | The Barbados National Energy Policy 2019–2030 targets 100% renewable energy and carbon neutrality by 2030. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | Solar supplied 9.0% of generation in 2024 (Ember), mostly distributed systems on feed-in contracts; BL&P reports the grid has reached a 100 MW solar limit and paused new applications. |
| Distributed energy market | Medium | Customer-owned generation is licence-exempt for households up to 10 kW(ac) and paid a fixed FIT, but no aggregation or storage compensation exists. |
| Grid flexibility market | Low | No flexibility or ancillary-services market; the only demand-response product is an Interruptible Service Rider for up to 20 large customers. |
| Energy storage adoption | Low | No published battery capacity; storage licensing (2019) and grid code rules (November 2024) are recent. |
| Renewable growth environment | Medium | Renewable share rose from 3.8% (2019) to 9.0% (2024) per Ember, but further solar growth is constrained by the 100 MW limit. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 43 sources
- Domestic Tariff (Residential Services). Barbados Light & Power Company Limited, 2022. accessed 9 October 2026.
- Fuel Clause Adjustment. Barbados Light & Power Company Limited, 2026. accessed 9 October 2026.
- Rising Global Oil Prices Impacting Electricity Fuel Costs. Barbados Light & Power Company Limited, 2026. accessed 9 October 2026.
- Time-of-Use Tariff (Business Services). Barbados Light & Power Company Limited, 2022. accessed 9 October 2026.
- Billing Under the Renewable Energy Rider. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Energy Rider. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Applying for Interconnection to the Grid. Barbados Light & Power Company Limited. accessed 9 October 2026.
- The Grid Code. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Understanding Your Renewable Energy Contract. Barbados Light & Power Company Limited. accessed 9 October 2026.
- The Advanced Metering Infrastructure Project. Barbados Light & Power Company Limited. accessed 9 October 2026.
- How We Generate Electricity. Barbados Light & Power Company Limited. accessed 9 October 2026.
- How We Deliver Electricity. Barbados Light & Power Company Limited. accessed 9 October 2026.
- The Clean Energy Bridge Project. Barbados Light & Power Company Limited. accessed 9 October 2026.
- The Lamberts Wind Farm Project. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Fair Trading Commission Issues Interim Rates Decision. Barbados Light & Power Company Limited, 2022. accessed 9 October 2026.
- Light & Power’s Rate Review Statement. Barbados Light & Power Company Limited, 2021. accessed 9 October 2026.
- BLPC Response to Positive FTC Ruling for Application to Extend and Add Temporary Generation. Barbados Light & Power Company Limited, 2026. accessed 9 October 2026.
- BLPC Customers to Receive an Additional Eight Months of VAT Relief on Electricity Bills. Barbados Light & Power Company Limited, 2023. accessed 9 October 2026.
- Customer Charges. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Domestic Service bill brochure. Barbados Light & Power Company Limited. accessed 9 October 2026.
- What Do I Need to Apply for Service. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Metering and Installations. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Electric Vehicles – Frequently Asked Questions. Barbados Light & Power Company Limited. accessed 9 October 2026.
- Householders’ Right to Renewable Energy. Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- Electric Light and Power Act (ELPA) Online System. Ministry of Energy, Business Development and Consumer Affairs, 2022. accessed 9 October 2026.
- Electric Light & Power Act – Supporting Documents. Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- Electric Light and Power (Amendment) Act, 2019. Government of Barbados, 2019. accessed 9 October 2026.
- Barbados National Energy Policy (BNEP) 2019–2030. Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- Barbados Energy Transition & Investment Plan (ETIP). Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- Sustainable Energy Investment Programme (Energy Smart Fund 2). Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- Disaster Risk and Energy Access Management (DREAM) project. Ministry of Energy, Business Development and Consumer Affairs. accessed 9 October 2026.
- 2021 Population and Housing Census. Barbados Statistical Service, 2021. accessed 9 October 2026.
- Population, total – Barbados (SP.POP.TOTL). World Bank, 2025. accessed 9 October 2026.
- Official exchange rate, LCU per US$ – Barbados (PA.NUS.FCRF). World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total) – Barbados (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 9 October 2026.
- Individuals using the Internet – Barbados (IT.NET.USER.ZS). World Bank / ITU, 2024. accessed 9 October 2026.
- Fixed broadband subscriptions per 100 people – Barbados (IT.NET.BBND.P2). World Bank / ITU, 2022. accessed 9 October 2026.
- Euro foreign exchange reference rates (9 October 2026). European Central Bank, 2026. accessed 9 October 2026.
- Share of electricity production by source – Barbados (Ember). Our World in Data / Ember, 2024. accessed 9 October 2026.
- Electricity generation – Barbados (Ember). Our World in Data / Ember, 2024. accessed 9 October 2026.
- Per capita electricity consumption – Barbados (Ember). Our World in Data / Ember, 2024. accessed 9 October 2026.
- Installed solar PV capacity – Barbados (IRENA). Our World in Data / IRENA, 2025. accessed 9 October 2026.
- Cumulative installed wind capacity – Barbados (IRENA). Our World in Data / IRENA, 2025. accessed 9 October 2026.
Questions about energy in Barbados.
For an average household using 250 kWh a month, the September 2026 bill on BL&P’s Domestic Tariff came to about BBD 149 before VAT, or about BBD 0.60 per kWh (around €0.27). More than half of that is the Fuel Clause Adjustment, which changes monthly with world oil prices.
The Barbados Light & Power Company Limited (BL&P), part of the Emera group, is the only supplier. It also generates most of the power, owns the grid and reads the meters. The Fair Trading Commission regulates its prices.
Yes. Under BL&P’s Renewable Energy Rider, small solar systems up to 10 kW are paid 34.25 cents/kWh for 20 years. However, BL&P says the grid has reached a 100 MW solar limit and new renewable applications are temporarily paused.
Households can register up to a cumulative 10 kW(ac) with the Ministry of Energy to get a Right to Renewable Energy certificate; larger systems need a licence through the online ELPA system. GEED must also approve the design and inspect the installation.
There is none. With one supplier, homes are identified by the BL&P Account ID printed on each bill (a 10-digit number on BL&P’s sample bill), held in BL&P’s own billing system rather than a national register.
About 9% of electricity came from solar in 2024 according to Ember, with the rest mainly from oil and a little gas. The national goal is 100% renewable energy by 2030.
It is a per-kWh charge recalculated every month from the previous month’s fuel and purchased-energy costs divided by kWh sales. It was 37.5253 cents/kWh in September 2026.