Energy in Saint Lucia, explained.

How electricity works in Saint Lucia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Saint Lucia: Not yet available.Olmack is not offered in Saint Lucia yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Saint Lucia.

Saint Lucia electricity 2026: LUCELEC monopoly to 2045, monthly fuel surcharge, ~97% diesel, small net-metered rooftop solar, NURC regulation, 10 MW solar + battery planned.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in East Caribbean dollar (XCD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Saint Lucia energy at a glance.

Key figures for households in Saint Lucia. Each one links to its source on the full overview below.

  • Electricity price.

    1.23 XCD per kWh for households, including taxes. Figures for October 2026.

  • Household use.

    2,310 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    2.8% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Saint Lucia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Saint Lucia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Saint Lucia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Saint Lucia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Saint Lucia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Saint Lucia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Saint Lucia.

Full overview

The energy market in Saint Lucia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Saint Lucia has a single, isolated island grid with no connection to any other country. St. Lucia Electricity Services Limited (LUCELEC) generates almost all of the island’s electricity at its Cul de Sac diesel station, owns the 66 kV transmission and 11 kV distribution network, and meters and bills every customer. Under section 3 of the Electricity Supply Act it holds a sole and exclusive licence to generate, transmit, distribute and sell electricity for 80 years from 1 July 1965. Since the 2016 amendment, that exclusivity covers generation from fossil fuel only, and the National Utilities Regulatory Commission (NURC) licenses and regulates generation from renewable sources.

Electricity is expensive because it is made mostly from imported diesel. Ember data put solar at about 2.8% of generation in 2025, with oil providing the rest. LUCELEC passes changes in fuel cost to customers through a Fuel Surcharge Cost Adjustment (FSCA) recalculated every month. For October 2026 the FSCA was EC$0.415 per kWh on top of a 2026 base domestic tariff of EC$0.812 (first 180 kWh) and EC$0.862 (above 180 kWh), giving EC$1.227 and EC$1.277 per kWh. A household using the 2024 average of 2,310 kWh a year paid about EC$1.23 per kWh (around €0.41).

Customers with rooftop solar connect under a net-metering framework that LUCELEC has applied since a 2009–2010 pilot, with system-size limits reported in 2023 as 5 kW for homes and 25 kW for businesses. At the end of 2024 there were 292 grid-tied rooftop systems totalling 2.53 MW, alongside LUCELEC’s 3 MW La Tourney solar farm. LUCELEC is developing a 10 MW solar plant with about 13 MW / 26 MWh of battery storage at Troumassee, and a new Electricity Bill with licensing, grid code and tariff regulations was expected to be tabled in Parliament in 2026.

Energy snapshot.

Headline figures for electricity in Saint Lucia. Each shows its data year and links to its source.

  • Population180,149 peopleSource 152025
  • Households65,951 householdsSource 142022
  • Average household size2.6 people/householdSource 142022
  • Electricity use per household2,310 kWh/yrSource 82024
  • Household price (XCD)1.23 XCD/kWhSource 1October 2026
  • Household price (EUR)0.407 EUR/kWhSource 17October 2026
  • Renewable electricity share2.8%Source 162025
  • Solar capacity0.006 GWSource 112026
  • Wind capacity0 GWSource 122022
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
National Utilities Regulatory Commission (NURC)
System operator
St. Lucia Electricity Services Limited (LUCELEC), which dispatches the isolated island grid
Distribution networks
One island-wide 66 kV / 11 kV network owned and operated by LUCELEC; no other distribution companies
Currency
East Caribbean dollar (XCD)
Voltage and frequency
240 V single-phase / 415 V three-phase, 50 Hz (Electricity Supply Act s.26: +4% / −8% voltage, ±3% frequency)

Electricity prices in Saint Lucia.

Household price (XCD)
1.23 XCD/kWh (October 2026)Source 1Derived for a 192.5 kWh month (2,310 kWh/yr ÷ 12): 180 kWh at EC$1.227 plus 12.5 kWh at EC$1.277 (2026 base tariff + October 2026 FSCA of EC$0.415) = EC$236.82, i.e. EC$1.230/kWh. Electricity is zero-rated for VAT (PwC). Any fixed or minimum charges are not included because they could not be verified from a current source.
Household price (EUR)
0.407 EUR/kWh (October 2026)Source 17Converted from EC$1.230/kWh at EC$3.0256 per euro: ECB reference rate of USD 1.1206 per euro (9 October 2026) × the fixed rate of EC$2.70 per US dollar (World Bank, PA.NUS.FCRF).
Typical annual electricity bill
2,842 XCD/yr (October 2026 rates)Source 1Derived: the 192.5 kWh monthly energy cost of EC$236.82 at October 2026 rates × 12. The FSCA changes every month, so this is indicative; fixed or minimum charges are excluded.

Household price trend (XCD per kWh).Source 1

0.7861.0071.227Oct 2025Oct 2026
Saint Lucia household electricity price, XCD per kWh
Oct 20250.817 XCD/kWh
Jan 20260.786 XCD/kWh
Mar 20260.819 XCD/kWh
May 20261.122 XCD/kWh
Jul 20261.037 XCD/kWh
Sep 20261.168 XCD/kWh
Oct 20261.227 XCD/kWh

There is one tariff schedule for the whole island and one supplier. Each bill has two per-kWh elements: a base tariff that covers LUCELEC’s non-fuel costs and return, and the monthly Fuel Surcharge Cost Adjustment that passes through changes in the price of diesel. Because the FSCA is measured against the previous year’s average fuel price, it can be negative when oil is cheap. In January 2026 it reduced the first-block domestic rate to EC$0.786/kWh; by October 2026 it had risen to +41.5 cents, taking the same block to EC$1.227/kWh.

The domestic tariff has only two blocks, split at 180 kWh a month. The average home used about 192 kWh a month in 2024, so most of its consumption is billed at the lower rate. PwC lists electricity among supplies zero-rated for VAT (standard rate 12.5%).

Trend

The 2026 base tariff is about 3 cents per kWh lower than the 2025 base tariff for every class. Fuel prices rose sharply during 2026, however, so October 2026 domestic prices were about 50% higher than in October 2025 (EC$1.227 against EC$0.817 for the first 180 kWh). In 2023, according to CCREEE, residential tariffs including the fuel adjustment were about US$0.35–0.37 per kWh.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYes2026 base tariff (all classes priced per kWh). Domestic: EC$0.812 for the first 180 kWh and EC$0.862 above 180 kWh. Commercial and hotel/industrial: EC$0.962 low tension, EC$0.922 high tension. Streetlighting: EC$0.957. The 2025 base tariff was higher (domestic EC$0.843 / 0.893; commercial EC$0.993 / 0.953). LUCELEC’s 2024 annual report notes its rate of return (12.80%) fell within the 10.00%–14.25% range set by legislation.
VariableYesFuel Surcharge Cost Adjustment (FSCA), set monthly under the Electricity Supply Act No. 10 of 1994 as amended by Acts 12 and 13 of 2006. It equals the cost of last month’s fuel at the current price minus its cost at the previous year’s average price (EC$8.6121/gallon for 2026), divided by last month’s kWh sales. It was −2.6 cents in October 2025, −5.7 cents in January 2026, +0.7 cents in March, +31.0 cents in May, +22.5 cents in July, +35.6 cents in September and +41.5 cents per kWh in October 2026, when diesel cost EC$16.19 per gallon.
Time-of-useNoNo time-of-use or dynamic tariff was identified for households or businesses.
PrepaymentNoNot yet available. LUCELEC’s 2024 annual report says it plans to introduce pre-paid metering.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
2,310 kWh/yr (2024)Source 8LUCELEC average annual consumption per domestic customer (2,158 kWh in 2023). Domestic sales were 152,057 MWh across 65,827 domestic customers in 2024.
Average daily use per household
6.3 kWh/day (2024)Source 8Derived: 2,310 kWh per domestic customer ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
2,039 kWh/person/yr (2022)Source 12All sectors, as published by CCREEE. Tourism and commerce use far more than households: commercial customers (including hotels) bought 230 GWh in 2024 against 152 GWh for domestic customers.
Heat pumps
Not identified from a reliable public source.
Air conditioning
7.7 % of households (2022)Source 14Ranges from 2.1% in Choiseul to 17.5% in Gros Islet. 12.8% of households have a solar water heater.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0.2 % of households (2022)Source 1495.5% of households cook mainly with LPG/cooking gas.

Saint Lucian homes use relatively little electricity: about 2,310 kWh a year, or around 6 kWh a day, in 2024. Cooking is almost entirely on bottled LPG and only 7.7% of households had air conditioning at the 2022 census, so demand is mostly from refrigerators (82.2% of homes), lighting, fans, washing machines and electronics. Domestic consumption per customer has risen from 1,943 kWh in 2015.

Commercial customers, especially hotels, drive the system. In 2024 the commercial class (including hotels) bought 230 GWh, or 56% of LUCELEC’s 408.6 GWh of sales, with an average of 28,693 kWh per account. LUCELEC’s July 2026 country assessment for I-REC estimated demand at about 115 GWh residential, 190 GWh commercial and public sector, 35 GWh tourism and 20 GWh industrial.

Housing and households.

Dwellings
65,951 housing units (2022)Source 14Housing units occupied by households at the 2022 census (provisional).
Owner-occupied
74.4% (2022)Source 14Derived: owned outright (68.8%) plus owned with a mortgage (5.6%). A further 7.5% live rent-free.
Private rented
15.1% (2022)Source 14
Social or public housing
0.5% (2022)Source 14Rented from government.
Houses
79.7% (2022)Source 14Derived: detached one-family houses 77.2% plus attached houses 2.5%.
Apartments and flats
18.8% (2022)Source 14Derived from the census housing-stock table: buildings with 2 apartments 11.1%, 3–4 apartments 6.0%, 5–9 apartments 1.5%, 10–19 apartments 0.2%. Larger buildings and other types make up the small remainder.
Urban population
29.1% (2025)Source 15

Most Saint Lucians live in detached single-family houses that they own: 77.2% of housing units are detached houses and 74.4% of households own their home, mostly without a mortgage. Small apartment buildings of two to four units make up most of the rest. Private renting accounts for 15.1% of households and government renting for just 0.5%.

The World Bank classes only 29.1% of the population as urban, though many households live in the suburban and rural parts of Castries district and in Gros Islet, the fastest-growing district. Detached owner-occupied homes with their own roofs make rooftop solar physically straightforward for many households; the limits are the grid connection rules and system-size caps.

How the grid works in Saint Lucia.

  1. TransmissionSt. Lucia Electricity Services Limited (LUCELEC)
  2. DistributionOne island-wide 66 kV / 11 kV network owned and operated by LUCELEC; no other distribution companies
  3. MeteringLUCELEC
  4. Supply1 or more retail suppliers

Physically, the system is small and centralised. LUCELEC’s Cul de Sac station holds 88.4 MW of available diesel capacity (68 MW firm). It feeds a 66 kV transmission ring of about 78 miles and an 11 kV distribution network of more than 2,600 miles, delivering power to customers at 240 V single-phase or 415 V three-phase. Peak demand was 67.6 MW in 2024. The only utility-scale renewable plant is the 3 MW La Tourney solar farm near Hewanorra International Airport in Vieux Fort, commissioned in 2018.

Commercially there is no market: LUCELEC buys fuel, generates, and sells to every customer at regulated rates. The 2016 amendment to the Electricity Supply Act removed LUCELEC’s exclusive right to generate from renewable sources and gave NURC responsibility for licensing renewable generators, but CCREEE’s 2022 report recorded no independent power producers. Reliability was weaker in 2024, with a SAIDI of 8.63 hours compared with 4.52 hours in 2023, after Tropical Storm Beryl and the failure of equipment at Cul de Sac substation.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Infrastructure, Ports and Transport — Energy DivisionSets national energy policy, including the National Energy Policy 2023–2030, coordinates electricity sector reform and leads the drafting of the new Electricity Bill. Climate commitments sit with the Department of Sustainable Development.
RegulatorNational Utilities Regulatory Commission (NURC)Multi-sector regulator for electricity and water, created by the NURC Act No. 3 of 2016. Responsible for tariffs, service standards and licensing, including licensing and regulation of renewable generation under section 4 of the Electricity Supply Act.
TSOSt. Lucia Electricity Services Limited (LUCELEC)Owns the 66 kV transmission network and dispatches the system from Cul de Sac, where its diesel power station is located.
DSOLUCELECOwns and operates the 11 kV distribution network and the low-voltage service connections to every customer.
SupplierLUCELECSole retailer under its exclusive licence; bills 73,953 customers (end of 2024).
MeteringLUCELECOwns, installs and reads all revenue meters. Meter accuracy tests requested by customers are supervised by the Chief Electrical Engineer (Electricity Supply Act s.44).

Compared with the UK system.

Compared with the UK system.
UK conceptSaint Lucia equivalentHow it works
DNOLUCELECOne network for the whole island, owned and run by LUCELEC, which is also the generator, supplier and meter operator. There are no separate distribution companies.
National Grid/NESOLUCELEC system controlLUCELEC owns the 66 kV transmission lines and dispatches all generation itself. There is no independent system operator and no interconnector.
MPANLUCELEC customer accountThere is no national supply-point register or standard numbering scheme. A connection is identified by the account LUCELEC opens for it, together with the premises address and meter number shown on the bill.
MPRNNo equivalentThere is no piped gas network; 95.5% of households cook with bottled LPG bought from fuel distributors.
Meter operatorLUCELECThe utility owns and maintains all meters. Customers can ask for a meter test against a standard meter; if it is more than 3% out, LUCELEC must replace it and refund the fee.
SupplierLUCELEC (sole supplier)Households cannot change supplier. LUCELEC’s exclusive licence to transmit, distribute and sell electricity runs for 80 years from 1 July 1965.
Smart-meter infrastructureLUCELEC-owned metering systemsUnlike the UK’s DCC model, any advanced metering is owned and operated by the utility itself; there is no national data hub or third-party access scheme.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?LUCELEC customer account (with meter number and premises address)
Who issues it?St. Lucia Electricity Services Limited (LUCELEC)
FormatUtility-assigned account number; LUCELEC does not publish its structure and no national standard format exists
LengthNot publicly documented
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the LUCELEC electricity bill and in the customer’s MyAccount online portal; the meter number is on the meter itself.
Electronic accessCustomers can view their account and bills through LUCELEC’s MyAccount online service and Virtual Service Desk; a customer mobile app was planned from 2025.
Third-party accessNo regulated scheme gives third parties (installers, aggregators, other suppliers) access to customer or meter data; any sharing is by the customer’s own consent with LUCELEC.
Who keeps the registerLUCELEC’s own customer and billing system; there is no independent national register.
Register scopeNational

Saint Lucia has no supply-point identifier in the UK sense. Because LUCELEC is the only network company and the only supplier, it simply opens a customer account for each premises it connects, records the meter it installs there, and bills that account. There is no switching process, so there is no need for a standard number that other suppliers or a central registration service can read.

The account is held by a named customer rather than being a permanent attribute of the building, and LUCELEC does not publish whether the number is kept or replaced when occupiers change. The structure and length of LUCELEC account numbers are not published, so no example is given here. Anyone needing to identify a supply point, such as a solar installer, uses the customer’s bill, the premises address and the meter number.

Meters are LUCELEC property. The Electricity Supply Act (s.44) lets a customer ask for the meter to be tested against a standard meter under the supervision of the Chief Electrical Engineer. If it reads more than 3% high or low, LUCELEC must replace it and refund the test fee, and past bills can be adjusted to the average of the preceding six months.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringYes
Net billingUnknown
How exported electricity is paidNet metering through bi-directional meters under a LUCELEC-administered framework; the current credit rate for exported energy was not identified from a published source
Is there a size limit?Yes. NURC reported in April 2023 that limits were set at 5 kW for residential and 25 kW for commercial customers, and consulted on whether to change them. No later published change was identified.
What legal basis does net metering have?According to CCREEE, the net-billing/net-metering arrangement grew out of a 2009–2010 LUCELEC pilot. It is not set out in legislation, but LUCELEC operates on that framework. Interconnection standards and a feed-in tariff were recorded as drafts in 2022.
Is the current scheme under review?Yes. NURC described the current net-metering method as unsustainable in 2023 because it does not account for grid maintenance costs, and it commissioned studies on capacity limits and renewable energy pricing to inform the new electricity legislation.
How many systems are connected?292 grid-tied rooftop systems with 2.53 MW of capacity at the end of 2024, according to LUCELEC, which expected numbers to rise significantly once the revised legislation takes effect.

Connecting a home system.

  1. Confirm that the planned grid-tied system fits within LUCELEC’s size limits (reported in 2023 as 5 kW for residential and 25 kW for commercial customers).
  2. Apply to LUCELEC to interconnect the system to its distribution network.
  3. Have the installation carried out by a qualified electrician; electrical work is subject to the regulations made under the Electricity Supply Act.
  4. LUCELEC installs or configures a bi-directional meter that records imported and exported energy on separate registers, and the system is connected.

Households can connect rooftop solar and export surplus energy to LUCELEC’s grid, but under tight limits. The scheme is an operational arrangement run by the utility rather than a statutory feed-in tariff. Bi-directional meters record exported and imported energy separately, a method LUCELEC began testing in its 2009 grid-tied PV pilot.

Uptake has been modest: 292 systems and 2.53 MW by the end of 2024 among about 66,000 domestic customers. The NURC consultation in April 2023 covered both the 5 kW / 25 kW caps and a new pricing methodology. Stakeholder comments were to be passed to the government for the pending electricity legislation, which is expected to set new rules on capacity limits and compensation.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (fossil fuel)Exclusive to LUCELEC for 80 years from 1 July 1965 (Electricity Supply Act s.3)Electricity Supply ActSince the 2016 amendment, the exclusivity covers generation from fossil fuel only.
Generate electricity (renewable)Licensing and regulation by NURC (s.4); no published size threshold or exemption was identifiedNURCOpened to third parties by the Electricity Supply (Amendment) Act No. 2 of 2016. CCREEE recorded no IPPs in 2022.
Small-scale self-generation with exportInterconnection approval from LUCELEC under the net-metering framework; system caps of 5 kW (residential) / 25 kW (commercial)LUCELEC (NURC oversight)The framework is operational, not statutory; new licensing regulations are being drafted.
Store electricityNo specific licensing regime identified—LUCELEC is procuring a utility battery (13.3 MW / 26.6 MWh) itself; behind-the-meter batteries have no separate rules.
Transmit and distributeExclusive to LUCELEC (s.3)Electricity Supply ActNo third-party network operators.
Sell / supply to customersExclusive to LUCELEC (s.3)Electricity Supply ActNo retail competition and no private-wire supply regime identified.
Aggregate, trade, wholesale, balancing or VPPNo market or licence category exists—All dispatch and balancing is done internally by LUCELEC.
Install electrical wiringWork and inspection are governed by the electrical regulations under the Electricity Supply ActChief Electrical Engineer / Ministry of InfrastructureNew wiring and electrical licensing regulations are part of the 2026 Electricity Bill package.

Licensing in Saint Lucia rests on the Electricity Supply Act. LUCELEC holds a statutory exclusive licence covering fossil-fuel generation, transmission, distribution and sale. Renewable generation sits outside that exclusivity and is licensed by NURC, but secondary rules setting out application procedures and thresholds have not yet been published.

The draft Electricity Bill was expected to be tabled in 2026 with six sets of regulations: electrical licensing, customer code, grid code, network performance, tariffs and wiring. Until then, small customer generators rely on LUCELEC’s interconnection and net-metering practice.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Ancillary services / frequency responseNo—NoLUCELEC. Reserve and frequency control are provided internally by LUCELEC’s diesel units; there is no market for third parties.
Demand responseNo—NoLUCELEC. No demand-response or interruptible tariff programme was identified.

There is no wholesale, balancing or flexibility market, and no way for distributed assets to be paid for grid services. LUCELEC planned a SCADA upgrade in 2025 that includes distributed-energy-resource management functions, and its strategy refers to developing a smarter grid for managing distributed energy resources. These are utility tools, however, not market access for customers or aggregators.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
I-REC(E) registry (Evident)Saint Lucia was approved for I-REC(E) issuance on 30 July 2026, with the Green Certificate Company as issuer, so renewable output can be certified for voluntary claims. This is a certificate system, not a flexibility market.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutUtility-owned metering; current AMI coverage not verified from a published source; pre-paid metering planned
Reading intervalNot published
Meter ownerLUCELEC
Accuracy rule±3% against a standard meter (Electricity Supply Act s.44)
Online accessLUCELEC MyAccount
PlannedPre-paid metering (2024 annual report)

Metering is entirely in LUCELEC’s hands. The utility chooses, owns and reads the meters, and there is no separate national rollout programme, data hub or regulated data-access regime. Net-metered customers have bi-directional meters that record import and export separately.

LUCELEC’s 2024 annual report lists pre-paid metering among its strategic initiatives. It also lists digital customer channels such as MyAccount, a Virtual Service Desk and a planned mobile app. A verified figure for the share of customers with interval-reading smart meters could not be confirmed for this profile.

Renewable electricity.

Electricity generation mix (2025).

  • Oil (diesel): 97.2%
  • Solar: 2.8%
Source 16
Renewable electricity share
2.8% (2025)Source 16Ember data via Our World in Data: solar 2.78%, oil 97.22%. Ember’s recent figures for Saint Lucia change little from year to year and are partly modelled. The grid is isolated, so generation and consumption shares are the same. LUCELEC’s solar farm produced 5.06 GWh in 2024 out of 449.2 GWh generated or purchased (about 1.1%); rooftop output is not separately published.
Home solar
2.53 MW (2024)Source 8292 distributed (rooftop) systems connected to the grid, residential and commercial combined.
Solar added each year
Not identified from a reliable public source.
Solar PV (utility + rooftop)
6.29 MW (2026)Source 11
Utility solar (La Tourney)
3 MW (2024)Source 8
Diesel (available)
88.4 MW (2024)Source 8
Wind
0 MW (2022)Source 12

Targets.

  • Third NDC (February 2025): 14.7% emissions reduction by 2030 and 22% by 2035 in energy and transport, potentially 32% with geothermal (as summarised by LUCELEC/I-TRACK).
  • National Energy Policy 2023–2030: seven goals covering electricity, transport, energy efficiency, petroleum supply, financing and capacity.
  • CCREEE (2022) records a target of 50% renewable penetration by 2030; the earlier NDC aimed for 35% renewable energy by 2025.

Renewable electricity in Saint Lucia means solar. The 3 MW La Tourney farm produced 5.06 GWh in 2024 and 42.75 GWh since it began operating in 2018. Rooftop systems add a further 2.5 MW or so. Together this is under 3% of supply, far below the 35% by 2025 aim recorded in earlier policy.

The next step is LUCELEC’s Troumassee project at Micoud: 10 MWac of solar PV with a 13.3 MW / 26.6 MWh battery and a 66 kV/11 kV substation, with Hatch as owner’s engineer. LUCELEC secured the land in 2024, issued the EPC tender in 2025 and expects commissioning in 2027. The government is also exploring geothermal resources under the Renewable Energy Sector Development Project (2022–2026), with sites at Fond St Jacques, Belle Plaine and Saltibus. CCREEE estimates 170 MW of geothermal potential.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is at an early stage. The Troumassee battery will be the first large battery on the grid. It is owned by the utility and designed to firm solar output and support an isolated diesel system. Without a time-of-use tariff, an export price signal or rules for behind-the-meter storage, households have little financial reason to add batteries beyond backup during outages.

Storage projects.

  • Troumassee solar + BESS (LUCELEC): 10 MWac solar PV with a two-hour lithium-ion battery of about 13 MW / 26 MWh, connected at 66 kV. EPC tender 2025; commissioning expected 2027.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
St. Lucia Electricity Services Limited (LUCELEC)100% (sole licensed supplier)NoNoNoLimited

LUCELEC is a publicly owned shareholder company and the only electricity supplier. Its subsidiary ENERGYZE Holdings Inc. installs photovoltaic systems for commercial and residential customers, alongside independent solar installers.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Government of Saint Lucia (Ministry of Infrastructure, Ports and Transport)GovernmentEnergy policy and legislationIts Energy Division owns the National Energy Policy and the pending Electricity Bill.
National Utilities Regulatory Commission (NURC)RegulatorElectricity and water regulatorSets tariffs and licenses renewable generation; runs consultations on net-metering limits and pricing.
St. Lucia Electricity Services Limited (LUCELEC)DistributionIntegrated utilityGenerator, network owner, system operator, meter operator and sole supplier.
Central Statistical Office of Saint LuciaGovernmentNational statisticsPublishes census housing data and annual electricity output and consumption tables.
Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE)Renewable EnergyCARICOM energy centrePublishes Saint Lucia’s Energy Report Cards on capacity, policy and tariffs.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Supply voltage and frequencyElectricity Supply Act, section 26Parliament of Saint Lucia240 V domestic (+4% / −8% at the consumer’s terminals); 50 Hz ±3%; 415/240 V three-phase four-wire.
Grid connectionElectricity (Grid Code) Regulations 2022Government of Saint LuciaTechnical rules for connecting to and operating the grid; a new Grid Code Regulation is part of the 2026 Electricity Bill package.
Distributed generation interconnectionInterconnection policy/standards (draft)Government / LUCELECRecorded by CCREEE in 2022 as a draft; in practice LUCELEC sets interconnection requirements for net-metered systems.
Metering accuracyElectricity Supply Act, section 44Parliament of Saint LuciaMeters must register within ±3% of a standard meter.
Appliance efficiencySLNS 90, 91, 93, 94 and air-conditioner labellingSaint Lucia Bureau of StandardsEnergy-efficiency labelling for lamps, refrigerators and air conditioners.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Utility interconnection approvalYesNationalGrid-tied systems need LUCELEC’s approval and a bi-directional meter; size caps of 5 kW (residential) and 25 kW (commercial) were reported in 2023.
Generation licence (rooftop)UnknownNationalNURC licenses renewable generation, but no published threshold separating licensable from exempt small systems was identified.
Electrical inspectionUnknownNationalElectrical installations are governed by the regulations made under the Electricity Supply Act; the specific inspection procedure for PV systems is not published.
Planning permissionUnknownNationalLand development is governed by the Physical Planning and Development Act; no specific published rule for rooftop solar was identified.

For a household, the gatekeeper is LUCELEC: it approves interconnection, enforces the size cap and fits the meter. Utility-scale projects face much longer processes. LUCELEC reported that its 10 MW solar farm was held up by land acquisition and regulatory approvals before the land agreement was signed in 2024.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net meteringActiveNet meteringExported rooftop solar energy is offset through bi-directional metering under LUCELEC’s framework, within 5 kW (residential) / 25 kW (commercial) caps. Under review by NURC.—
Import duty exemption for renewable energy equipmentActiveImport duty reliefCabinet Conclusion #464 of 1999, amended by #969 of 2020, exempts from import duty apparatus that produces power, heat, light or electricity from renewable sources and energy-saving apparatus, as approved by the ministry responsible for sustainable development. Recorded as in force by CCREEE (2022); no later change identified.—
Hybrid and sustainable-fuel vehicle duty concessionsClosedImport duty and excise reliefReduced import duty and excise for hybrid and sustainable-fuel vehicles under Cabinet Conclusion #282 of 2014, as extended, was effective until 30 November 2023.2014 – 30 Nov 2023

Data and connectivity.

Fixed broadband
60.2 % of households (2022)Source 14Derived: 39,715 of 65,951 households reported broadband (cable, fibre or DSL) internet. The World Bank reports 68.2% of people using the internet in 2024.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband reaches about six in ten households and mobile data is widespread (35,402 households reported a smartphone data plan at the 2022 census). There is no public information on the communications technology behind LUCELEC’s meter reading or on any open protocol that third-party devices could use to interact with the grid.

Grid conditions.

National peak demand
0.068 GW (2024)Source 867.61 MW (65.94 MW in 2023).
Annual electricity demand
0.449 TWh (2024)Source 8Units generated or purchased (449.2 GWh); sales were 408.6 GWh and losses 6.1%.
Generation capacity
0.091 GW (2024)Source 8Derived: 88.4 MW available diesel + 3 MW utility solar; excludes about 2.5 MW of rooftop PV.
Interconnection
0 GWSource 10Isolated island grid with no cross-border links.
Curtailment
Not identified from a reliable public source.

The island grid peaks at under 70 MW and grew about 6% in 2024. With all firm capacity in one diesel station, reliability depends on the Cul de Sac site. Problems there in 2024, together with Tropical Storm Beryl, nearly doubled average outage time. LUCELEC plans to retire the older MAK engines at Station A in 2029 and is replacing the 66 kV switchgear at Castries substation.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
New Electricity Bill and regulationsUpcoming2026 (expected tabling)A new Electricity Bill was presented to stakeholders and was expected to be tabled in Parliament in 2026. It comes with electrical licensing, customer code, grid code, network performance, tariff and wiring regulations, and is expected to reset renewable licensing, net-metering caps and pricing.
Troumassee 10 MW solar + 26.6 MWh batteryUpcoming2027LUCELEC’s second utility solar plant, with storage and a new 66/11 kV substation, is expected to be commissioned in 2027.
I-REC(E) certificates availableCurrent30 July 2026Saint Lucia was approved for issuance of international renewable energy certificates, with the Green Certificate Company as issuer.
Retirement of MAK engines at Station AUpcoming2029LUCELEC plans to decommission the older MAK units at Cul de Sac.
End of LUCELEC’s 80-year exclusive licence termUpcoming30 June 2045The licence under s.3 runs for 80 years from 1 July 1965.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costHighLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow292 grid-tied rooftop systems (2.53 MW) at the end of 2024 among about 66,000 domestic customers; caps of 5 kW residential.
Distributed energy marketLowNet metering exists only as a utility framework with small size caps; no aggregation or storage rules.
Grid flexibility marketLowNo wholesale, balancing, ancillary or demand-response market; LUCELEC balances the system internally.
Energy storage adoptionLowNo operating grid battery; the first (13.3 MW / 26.6 MWh) is planned for 2027.
Renewable growth environmentLowSolar share around 2.8% (Ember 2025) and little change since the 3 MW farm opened in 2018; the 10 MW Troumassee project is the next step.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 24 sources
  1. Fuel Surcharge Cost Adjustment – applied to bills for October 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  2. Fuel Surcharge Cost Adjustment – applied to bills for September 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  3. Fuel Surcharge Cost Adjustment – applied to bills for July 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  4. Fuel Surcharge Cost Adjustment – applied to bills for May 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  5. Fuel Surcharge Cost Adjustment – applied to bills for March 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  6. Fuel Surcharge Cost Adjustment – applied to bills for January 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
  7. Fuel Surcharge Cost Adjustment – applied to bills for October 2025. St. Lucia Electricity Services Limited, 2025. accessed 10 October 2026.
  8. Annual Report 2024 (vital statistics, operations review, ESG, operating statistics). St. Lucia Electricity Services Limited, 2025. accessed 10 October 2026.
  9. LUCELEC Summarised Vital Statistics. St. Lucia Electricity Services Limited, 2015. accessed 10 October 2026.
  10. Country Assessment Report – Saint Lucia (v1.0). International Tracking Standard Foundation (prepared by LUCELEC), 2026. accessed 10 October 2026.
  11. Saint Lucia approved for I-REC(E) issuance. International Tracking Standard Foundation, 2026. accessed 10 October 2026.
  12. St. Lucia Energy Report Card 2022. Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE), 2024. accessed 10 October 2026.
  13. Electricity Output and Consumption in Kilowatt Hours (KWh) Thousands, 2010 to 2023. Central Statistical Office of Saint Lucia, 2024. accessed 10 October 2026.
  14. Saint Lucia 2022 Population and Housing Census – Provisional Results. Central Statistical Office of Saint Lucia, 2024. accessed 10 October 2026.
  15. World Development Indicators – Saint Lucia (population, urban share, internet use, electricity access, exchange rate). World Bank, 2025. accessed 10 October 2026.
  16. Share of electricity production by source – Saint Lucia (Ember). Our World in Data / Ember, 2025. accessed 10 October 2026.
  17. Euro foreign exchange reference rates (9 October 2026). European Central Bank, 2026. accessed 10 October 2026.
  18. Saint Lucia plans 10 MW solar project. pv magazine, 2025. accessed 10 October 2026.
  19. NURC holds public consultation on renewable energy pricing and capacity limits. The Voice (Saint Lucia), 2023. accessed 10 October 2026.
  20. Saint Lucia – Corporate – Other taxes. PwC Worldwide Tax Summaries, 2026. accessed 10 October 2026.
  21. Electricity Supply Act, section 3 – Grant of licence. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
  22. Electricity Supply Act, section 4 – Licensing and regulation of electricity from renewable resources. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
  23. Electricity Supply Act, section 26 – Voltage of electricity supply. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
  24. Electricity Supply Act, section 44 – Meters. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.