How electricity works in Saint Lucia.
Saint Lucia electricity 2026: LUCELEC monopoly to 2045, monthly fuel surcharge, ~97% diesel, small net-metered rooftop solar, NURC regulation, 10 MW solar + battery planned.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in East Caribbean dollar (XCD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Saint Lucia energy at a glance.
Key figures for households in Saint Lucia. Each one links to its source on the full overview below.
Electricity price.
1.23 XCD per kWh for households, including taxes. Figures for October 2026.
Household use.
2,310 kWh a year for a typical household. Figures for 2024.
Renewable share.
2.8% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Saint Lucia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Saint Lucia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Saint Lucia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Saint Lucia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Saint Lucia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Saint Lucia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Saint Lucia.
The energy market in Saint Lucia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Saint Lucia has a single, isolated island grid with no connection to any other country. St. Lucia Electricity Services Limited (LUCELEC) generates almost all of the island’s electricity at its Cul de Sac diesel station, owns the 66 kV transmission and 11 kV distribution network, and meters and bills every customer. Under section 3 of the Electricity Supply Act it holds a sole and exclusive licence to generate, transmit, distribute and sell electricity for 80 years from 1 July 1965. Since the 2016 amendment, that exclusivity covers generation from fossil fuel only, and the National Utilities Regulatory Commission (NURC) licenses and regulates generation from renewable sources.
Electricity is expensive because it is made mostly from imported diesel. Ember data put solar at about 2.8% of generation in 2025, with oil providing the rest. LUCELEC passes changes in fuel cost to customers through a Fuel Surcharge Cost Adjustment (FSCA) recalculated every month. For October 2026 the FSCA was EC$0.415 per kWh on top of a 2026 base domestic tariff of EC$0.812 (first 180 kWh) and EC$0.862 (above 180 kWh), giving EC$1.227 and EC$1.277 per kWh. A household using the 2024 average of 2,310 kWh a year paid about EC$1.23 per kWh (around €0.41).
Customers with rooftop solar connect under a net-metering framework that LUCELEC has applied since a 2009–2010 pilot, with system-size limits reported in 2023 as 5 kW for homes and 25 kW for businesses. At the end of 2024 there were 292 grid-tied rooftop systems totalling 2.53 MW, alongside LUCELEC’s 3 MW La Tourney solar farm. LUCELEC is developing a 10 MW solar plant with about 13 MW / 26 MWh of battery storage at Troumassee, and a new Electricity Bill with licensing, grid code and tariff regulations was expected to be tabled in Parliament in 2026.
Energy snapshot.
Headline figures for electricity in Saint Lucia. Each shows its data year and links to its source.
- Population180,149 peopleSource 152025
- Households65,951 householdsSource 142022
- Average household size2.6 people/householdSource 142022
- Electricity use per household2,310 kWh/yrSource 82024
- Household price (XCD)1.23 XCD/kWhSource 1October 2026
- Household price (EUR)0.407 EUR/kWhSource 17October 2026
- Renewable electricity share2.8%Source 162025
- Solar capacity0.006 GWSource 112026
- Wind capacity0 GWSource 122022
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- National Utilities Regulatory Commission (NURC)
- System operator
- St. Lucia Electricity Services Limited (LUCELEC), which dispatches the isolated island grid
- Distribution networks
- One island-wide 66 kV / 11 kV network owned and operated by LUCELEC; no other distribution companies
- Currency
- East Caribbean dollar (XCD)
- Voltage and frequency
- 240 V single-phase / 415 V three-phase, 50 Hz (Electricity Supply Act s.26: +4% / −8% voltage, ±3% frequency)
Electricity prices in Saint Lucia.
- Household price (XCD)
- 1.23 XCD/kWh (October 2026)Source 1Derived for a 192.5 kWh month (2,310 kWh/yr ÷ 12): 180 kWh at EC$1.227 plus 12.5 kWh at EC$1.277 (2026 base tariff + October 2026 FSCA of EC$0.415) = EC$236.82, i.e. EC$1.230/kWh. Electricity is zero-rated for VAT (PwC). Any fixed or minimum charges are not included because they could not be verified from a current source.
- Household price (EUR)
- 0.407 EUR/kWh (October 2026)Source 17Converted from EC$1.230/kWh at EC$3.0256 per euro: ECB reference rate of USD 1.1206 per euro (9 October 2026) × the fixed rate of EC$2.70 per US dollar (World Bank, PA.NUS.FCRF).
- Typical annual electricity bill
- 2,842 XCD/yr (October 2026 rates)Source 1Derived: the 192.5 kWh monthly energy cost of EC$236.82 at October 2026 rates × 12. The FSCA changes every month, so this is indicative; fixed or minimum charges are excluded.
Household price trend (XCD per kWh).Source 1
| Oct 2025 | 0.817 XCD/kWh |
|---|---|
| Jan 2026 | 0.786 XCD/kWh |
| Mar 2026 | 0.819 XCD/kWh |
| May 2026 | 1.122 XCD/kWh |
| Jul 2026 | 1.037 XCD/kWh |
| Sep 2026 | 1.168 XCD/kWh |
| Oct 2026 | 1.227 XCD/kWh |
There is one tariff schedule for the whole island and one supplier. Each bill has two per-kWh elements: a base tariff that covers LUCELEC’s non-fuel costs and return, and the monthly Fuel Surcharge Cost Adjustment that passes through changes in the price of diesel. Because the FSCA is measured against the previous year’s average fuel price, it can be negative when oil is cheap. In January 2026 it reduced the first-block domestic rate to EC$0.786/kWh; by October 2026 it had risen to +41.5 cents, taking the same block to EC$1.227/kWh.
The domestic tariff has only two blocks, split at 180 kWh a month. The average home used about 192 kWh a month in 2024, so most of its consumption is billed at the lower rate. PwC lists electricity among supplies zero-rated for VAT (standard rate 12.5%).
Trend
The 2026 base tariff is about 3 cents per kWh lower than the 2025 base tariff for every class. Fuel prices rose sharply during 2026, however, so October 2026 domestic prices were about 50% higher than in October 2025 (EC$1.227 against EC$0.817 for the first 180 kWh). In 2023, according to CCREEE, residential tariffs including the fuel adjustment were about US$0.35–0.37 per kWh.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | 2026 base tariff (all classes priced per kWh). Domestic: EC$0.812 for the first 180 kWh and EC$0.862 above 180 kWh. Commercial and hotel/industrial: EC$0.962 low tension, EC$0.922 high tension. Streetlighting: EC$0.957. The 2025 base tariff was higher (domestic EC$0.843 / 0.893; commercial EC$0.993 / 0.953). LUCELEC’s 2024 annual report notes its rate of return (12.80%) fell within the 10.00%–14.25% range set by legislation. |
| Variable | Yes | Fuel Surcharge Cost Adjustment (FSCA), set monthly under the Electricity Supply Act No. 10 of 1994 as amended by Acts 12 and 13 of 2006. It equals the cost of last month’s fuel at the current price minus its cost at the previous year’s average price (EC$8.6121/gallon for 2026), divided by last month’s kWh sales. It was −2.6 cents in October 2025, −5.7 cents in January 2026, +0.7 cents in March, +31.0 cents in May, +22.5 cents in July, +35.6 cents in September and +41.5 cents per kWh in October 2026, when diesel cost EC$16.19 per gallon. |
| Time-of-use | No | No time-of-use or dynamic tariff was identified for households or businesses. |
| Prepayment | No | Not yet available. LUCELEC’s 2024 annual report says it plans to introduce pre-paid metering. |
Household prices compared with neighbouring countries (EUR per kWh).
- Grenada€0.465
- Saint Lucia€0.407
- Dominica€0.295
- Barbados€0.267
- Martinique€0.19
- Trinidad and Tobago€0.056
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,310 kWh/yr (2024)Source 8LUCELEC average annual consumption per domestic customer (2,158 kWh in 2023). Domestic sales were 152,057 MWh across 65,827 domestic customers in 2024.
- Average daily use per household
- 6.3 kWh/day (2024)Source 8Derived: 2,310 kWh per domestic customer ÷ 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,039 kWh/person/yr (2022)Source 12All sectors, as published by CCREEE. Tourism and commerce use far more than households: commercial customers (including hotels) bought 230 GWh in 2024 against 152 GWh for domestic customers.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 7.7 % of households (2022)Source 14Ranges from 2.1% in Choiseul to 17.5% in Gros Islet. 12.8% of households have a solar water heater.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 0.2 % of households (2022)Source 1495.5% of households cook mainly with LPG/cooking gas.
Saint Lucian homes use relatively little electricity: about 2,310 kWh a year, or around 6 kWh a day, in 2024. Cooking is almost entirely on bottled LPG and only 7.7% of households had air conditioning at the 2022 census, so demand is mostly from refrigerators (82.2% of homes), lighting, fans, washing machines and electronics. Domestic consumption per customer has risen from 1,943 kWh in 2015.
Commercial customers, especially hotels, drive the system. In 2024 the commercial class (including hotels) bought 230 GWh, or 56% of LUCELEC’s 408.6 GWh of sales, with an average of 28,693 kWh per account. LUCELEC’s July 2026 country assessment for I-REC estimated demand at about 115 GWh residential, 190 GWh commercial and public sector, 35 GWh tourism and 20 GWh industrial.
Housing and households.
- Dwellings
- 65,951 housing units (2022)Source 14Housing units occupied by households at the 2022 census (provisional).
- Owner-occupied
- 74.4% (2022)Source 14Derived: owned outright (68.8%) plus owned with a mortgage (5.6%). A further 7.5% live rent-free.
- Private rented
- 15.1% (2022)Source 14
- Social or public housing
- 0.5% (2022)Source 14Rented from government.
- Houses
- 79.7% (2022)Source 14Derived: detached one-family houses 77.2% plus attached houses 2.5%.
- Apartments and flats
- 18.8% (2022)Source 14Derived from the census housing-stock table: buildings with 2 apartments 11.1%, 3–4 apartments 6.0%, 5–9 apartments 1.5%, 10–19 apartments 0.2%. Larger buildings and other types make up the small remainder.
- Urban population
- 29.1% (2025)Source 15
Most Saint Lucians live in detached single-family houses that they own: 77.2% of housing units are detached houses and 74.4% of households own their home, mostly without a mortgage. Small apartment buildings of two to four units make up most of the rest. Private renting accounts for 15.1% of households and government renting for just 0.5%.
The World Bank classes only 29.1% of the population as urban, though many households live in the suburban and rural parts of Castries district and in Gros Islet, the fastest-growing district. Detached owner-occupied homes with their own roofs make rooftop solar physically straightforward for many households; the limits are the grid connection rules and system-size caps.
How the grid works in Saint Lucia.
- TransmissionSt. Lucia Electricity Services Limited (LUCELEC)
- DistributionOne island-wide 66 kV / 11 kV network owned and operated by LUCELEC; no other distribution companies
- MeteringLUCELEC
- Supply1 or more retail suppliers
Physically, the system is small and centralised. LUCELEC’s Cul de Sac station holds 88.4 MW of available diesel capacity (68 MW firm). It feeds a 66 kV transmission ring of about 78 miles and an 11 kV distribution network of more than 2,600 miles, delivering power to customers at 240 V single-phase or 415 V three-phase. Peak demand was 67.6 MW in 2024. The only utility-scale renewable plant is the 3 MW La Tourney solar farm near Hewanorra International Airport in Vieux Fort, commissioned in 2018.
Commercially there is no market: LUCELEC buys fuel, generates, and sells to every customer at regulated rates. The 2016 amendment to the Electricity Supply Act removed LUCELEC’s exclusive right to generate from renewable sources and gave NURC responsibility for licensing renewable generators, but CCREEE’s 2022 report recorded no independent power producers. Reliability was weaker in 2024, with a SAIDI of 8.63 hours compared with 4.52 hours in 2023, after Tropical Storm Beryl and the failure of equipment at Cul de Sac substation.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Infrastructure, Ports and Transport — Energy Division | Sets national energy policy, including the National Energy Policy 2023–2030, coordinates electricity sector reform and leads the drafting of the new Electricity Bill. Climate commitments sit with the Department of Sustainable Development. |
| Regulator | National Utilities Regulatory Commission (NURC) | Multi-sector regulator for electricity and water, created by the NURC Act No. 3 of 2016. Responsible for tariffs, service standards and licensing, including licensing and regulation of renewable generation under section 4 of the Electricity Supply Act. |
| TSO | St. Lucia Electricity Services Limited (LUCELEC) | Owns the 66 kV transmission network and dispatches the system from Cul de Sac, where its diesel power station is located. |
| DSO | LUCELEC | Owns and operates the 11 kV distribution network and the low-voltage service connections to every customer. |
| Supplier | LUCELEC | Sole retailer under its exclusive licence; bills 73,953 customers (end of 2024). |
| Metering | LUCELEC | Owns, installs and reads all revenue meters. Meter accuracy tests requested by customers are supervised by the Chief Electrical Engineer (Electricity Supply Act s.44). |
Compared with the UK system.
| UK concept | Saint Lucia equivalent | How it works |
|---|---|---|
| DNO | LUCELEC | One network for the whole island, owned and run by LUCELEC, which is also the generator, supplier and meter operator. There are no separate distribution companies. |
| National Grid/NESO | LUCELEC system control | LUCELEC owns the 66 kV transmission lines and dispatches all generation itself. There is no independent system operator and no interconnector. |
| MPAN | LUCELEC customer account | There is no national supply-point register or standard numbering scheme. A connection is identified by the account LUCELEC opens for it, together with the premises address and meter number shown on the bill. |
| MPRN | No equivalent | There is no piped gas network; 95.5% of households cook with bottled LPG bought from fuel distributors. |
| Meter operator | LUCELEC | The utility owns and maintains all meters. Customers can ask for a meter test against a standard meter; if it is more than 3% out, LUCELEC must replace it and refund the fee. |
| Supplier | LUCELEC (sole supplier) | Households cannot change supplier. LUCELEC’s exclusive licence to transmit, distribute and sell electricity runs for 80 years from 1 July 1965. |
| Smart-meter infrastructure | LUCELEC-owned metering systems | Unlike the UK’s DCC model, any advanced metering is owned and operated by the utility itself; there is no national data hub or third-party access scheme. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | LUCELEC customer account (with meter number and premises address) |
| Who issues it? | St. Lucia Electricity Services Limited (LUCELEC) |
| Format | Utility-assigned account number; LUCELEC does not publish its structure and no national standard format exists |
| Length | Not publicly documented |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the LUCELEC electricity bill and in the customer’s MyAccount online portal; the meter number is on the meter itself. |
| Electronic access | Customers can view their account and bills through LUCELEC’s MyAccount online service and Virtual Service Desk; a customer mobile app was planned from 2025. |
| Third-party access | No regulated scheme gives third parties (installers, aggregators, other suppliers) access to customer or meter data; any sharing is by the customer’s own consent with LUCELEC. |
| Who keeps the register | LUCELEC’s own customer and billing system; there is no independent national register. |
| Register scope | National |
Saint Lucia has no supply-point identifier in the UK sense. Because LUCELEC is the only network company and the only supplier, it simply opens a customer account for each premises it connects, records the meter it installs there, and bills that account. There is no switching process, so there is no need for a standard number that other suppliers or a central registration service can read.
The account is held by a named customer rather than being a permanent attribute of the building, and LUCELEC does not publish whether the number is kept or replaced when occupiers change. The structure and length of LUCELEC account numbers are not published, so no example is given here. Anyone needing to identify a supply point, such as a solar installer, uses the customer’s bill, the premises address and the meter number.
Meters are LUCELEC property. The Electricity Supply Act (s.44) lets a customer ask for the meter to be tested against a standard meter under the supervision of the Chief Electrical Engineer. If it reads more than 3% high or low, LUCELEC must replace it and refund the test fee, and past bills can be adjusted to the average of the preceding six months.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Yes |
| Net billing | Unknown |
| How exported electricity is paid | Net metering through bi-directional meters under a LUCELEC-administered framework; the current credit rate for exported energy was not identified from a published source |
| Is there a size limit? | Yes. NURC reported in April 2023 that limits were set at 5 kW for residential and 25 kW for commercial customers, and consulted on whether to change them. No later published change was identified. |
| What legal basis does net metering have? | According to CCREEE, the net-billing/net-metering arrangement grew out of a 2009–2010 LUCELEC pilot. It is not set out in legislation, but LUCELEC operates on that framework. Interconnection standards and a feed-in tariff were recorded as drafts in 2022. |
| Is the current scheme under review? | Yes. NURC described the current net-metering method as unsustainable in 2023 because it does not account for grid maintenance costs, and it commissioned studies on capacity limits and renewable energy pricing to inform the new electricity legislation. |
| How many systems are connected? | 292 grid-tied rooftop systems with 2.53 MW of capacity at the end of 2024, according to LUCELEC, which expected numbers to rise significantly once the revised legislation takes effect. |
Connecting a home system.
- Confirm that the planned grid-tied system fits within LUCELEC’s size limits (reported in 2023 as 5 kW for residential and 25 kW for commercial customers).
- Apply to LUCELEC to interconnect the system to its distribution network.
- Have the installation carried out by a qualified electrician; electrical work is subject to the regulations made under the Electricity Supply Act.
- LUCELEC installs or configures a bi-directional meter that records imported and exported energy on separate registers, and the system is connected.
Households can connect rooftop solar and export surplus energy to LUCELEC’s grid, but under tight limits. The scheme is an operational arrangement run by the utility rather than a statutory feed-in tariff. Bi-directional meters record exported and imported energy separately, a method LUCELEC began testing in its 2009 grid-tied PV pilot.
Uptake has been modest: 292 systems and 2.53 MW by the end of 2024 among about 66,000 domestic customers. The NURC consultation in April 2023 covered both the 5 kW / 25 kW caps and a new pricing methodology. Stakeholder comments were to be passed to the government for the pending electricity legislation, which is expected to set new rules on capacity limits and compensation.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (fossil fuel) | Exclusive to LUCELEC for 80 years from 1 July 1965 (Electricity Supply Act s.3) | Electricity Supply Act | Since the 2016 amendment, the exclusivity covers generation from fossil fuel only. |
| Generate electricity (renewable) | Licensing and regulation by NURC (s.4); no published size threshold or exemption was identified | NURC | Opened to third parties by the Electricity Supply (Amendment) Act No. 2 of 2016. CCREEE recorded no IPPs in 2022. |
| Small-scale self-generation with export | Interconnection approval from LUCELEC under the net-metering framework; system caps of 5 kW (residential) / 25 kW (commercial) | LUCELEC (NURC oversight) | The framework is operational, not statutory; new licensing regulations are being drafted. |
| Store electricity | No specific licensing regime identified | — | LUCELEC is procuring a utility battery (13.3 MW / 26.6 MWh) itself; behind-the-meter batteries have no separate rules. |
| Transmit and distribute | Exclusive to LUCELEC (s.3) | Electricity Supply Act | No third-party network operators. |
| Sell / supply to customers | Exclusive to LUCELEC (s.3) | Electricity Supply Act | No retail competition and no private-wire supply regime identified. |
| Aggregate, trade, wholesale, balancing or VPP | No market or licence category exists | — | All dispatch and balancing is done internally by LUCELEC. |
| Install electrical wiring | Work and inspection are governed by the electrical regulations under the Electricity Supply Act | Chief Electrical Engineer / Ministry of Infrastructure | New wiring and electrical licensing regulations are part of the 2026 Electricity Bill package. |
Licensing in Saint Lucia rests on the Electricity Supply Act. LUCELEC holds a statutory exclusive licence covering fossil-fuel generation, transmission, distribution and sale. Renewable generation sits outside that exclusivity and is licensed by NURC, but secondary rules setting out application procedures and thresholds have not yet been published.
The draft Electricity Bill was expected to be tabled in 2026 with six sets of regulations: electrical licensing, customer code, grid code, network performance, tariffs and wiring. Until then, small customer generators rely on LUCELEC’s interconnection and net-metering practice.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services / frequency response | No | — | No | LUCELEC. Reserve and frequency control are provided internally by LUCELEC’s diesel units; there is no market for third parties. |
| Demand response | No | — | No | LUCELEC. No demand-response or interruptible tariff programme was identified. |
There is no wholesale, balancing or flexibility market, and no way for distributed assets to be paid for grid services. LUCELEC planned a SCADA upgrade in 2025 that includes distributed-energy-resource management functions, and its strategy refers to developing a smarter grid for managing distributed energy resources. These are utility tools, however, not market access for customers or aggregators.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| I-REC(E) registry (Evident) | Saint Lucia was approved for I-REC(E) issuance on 30 July 2026, with the Green Certificate Company as issuer, so renewable output can be certified for voluntary claims. This is a certificate system, not a flexibility market. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Utility-owned metering; current AMI coverage not verified from a published source; pre-paid metering planned |
| Reading interval | Not published |
| Meter owner | LUCELEC |
| Accuracy rule | ±3% against a standard meter (Electricity Supply Act s.44) |
| Online access | LUCELEC MyAccount |
| Planned | Pre-paid metering (2024 annual report) |
Metering is entirely in LUCELEC’s hands. The utility chooses, owns and reads the meters, and there is no separate national rollout programme, data hub or regulated data-access regime. Net-metered customers have bi-directional meters that record import and export separately.
LUCELEC’s 2024 annual report lists pre-paid metering among its strategic initiatives. It also lists digital customer channels such as MyAccount, a Virtual Service Desk and a planned mobile app. A verified figure for the share of customers with interval-reading smart meters could not be confirmed for this profile.
Renewable electricity.
Electricity generation mix (2025).
- Oil (diesel): 97.2%
- Solar: 2.8%
- Renewable electricity share
- 2.8% (2025)Source 16Ember data via Our World in Data: solar 2.78%, oil 97.22%. Ember’s recent figures for Saint Lucia change little from year to year and are partly modelled. The grid is isolated, so generation and consumption shares are the same. LUCELEC’s solar farm produced 5.06 GWh in 2024 out of 449.2 GWh generated or purchased (about 1.1%); rooftop output is not separately published.
- Home solar
- 2.53 MW (2024)Source 8292 distributed (rooftop) systems connected to the grid, residential and commercial combined.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV (utility + rooftop)
- 6.29 MW (2026)Source 11
- Utility solar (La Tourney)
- 3 MW (2024)Source 8
- Diesel (available)
- 88.4 MW (2024)Source 8
- Wind
- 0 MW (2022)Source 12
Targets.
- Third NDC (February 2025): 14.7% emissions reduction by 2030 and 22% by 2035 in energy and transport, potentially 32% with geothermal (as summarised by LUCELEC/I-TRACK).
- National Energy Policy 2023–2030: seven goals covering electricity, transport, energy efficiency, petroleum supply, financing and capacity.
- CCREEE (2022) records a target of 50% renewable penetration by 2030; the earlier NDC aimed for 35% renewable energy by 2025.
Renewable electricity in Saint Lucia means solar. The 3 MW La Tourney farm produced 5.06 GWh in 2024 and 42.75 GWh since it began operating in 2018. Rooftop systems add a further 2.5 MW or so. Together this is under 3% of supply, far below the 35% by 2025 aim recorded in earlier policy.
The next step is LUCELEC’s Troumassee project at Micoud: 10 MWac of solar PV with a 13.3 MW / 26.6 MWh battery and a 66 kV/11 kV substation, with Hatch as owner’s engineer. LUCELEC secured the land in 2024, issued the EPC tender in 2025 and expects commissioning in 2027. The government is also exploring geothermal resources under the Renewable Energy Sector Development Project (2022–2026), with sites at Fond St Jacques, Belle Plaine and Saltibus. CCREEE estimates 170 MW of geothermal potential.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is at an early stage. The Troumassee battery will be the first large battery on the grid. It is owned by the utility and designed to firm solar output and support an isolated diesel system. Without a time-of-use tariff, an export price signal or rules for behind-the-meter storage, households have little financial reason to add batteries beyond backup during outages.
Storage projects.
- Troumassee solar + BESS (LUCELEC): 10 MWac solar PV with a two-hour lithium-ion battery of about 13 MW / 26 MWh, connected at 66 kV. EPC tender 2025; commissioning expected 2027.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| St. Lucia Electricity Services Limited (LUCELEC) | 100% (sole licensed supplier) | No | No | No | Limited |
LUCELEC is a publicly owned shareholder company and the only electricity supplier. Its subsidiary ENERGYZE Holdings Inc. installs photovoltaic systems for commercial and residential customers, alongside independent solar installers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Government of Saint Lucia (Ministry of Infrastructure, Ports and Transport) | Government | Energy policy and legislation | Its Energy Division owns the National Energy Policy and the pending Electricity Bill. |
| National Utilities Regulatory Commission (NURC) | Regulator | Electricity and water regulator | Sets tariffs and licenses renewable generation; runs consultations on net-metering limits and pricing. |
| St. Lucia Electricity Services Limited (LUCELEC) | Distribution | Integrated utility | Generator, network owner, system operator, meter operator and sole supplier. |
| Central Statistical Office of Saint Lucia | Government | National statistics | Publishes census housing data and annual electricity output and consumption tables. |
| Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE) | Renewable Energy | CARICOM energy centre | Publishes Saint Lucia’s Energy Report Cards on capacity, policy and tariffs. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Supply voltage and frequency | Electricity Supply Act, section 26 | Parliament of Saint Lucia | 240 V domestic (+4% / −8% at the consumer’s terminals); 50 Hz ±3%; 415/240 V three-phase four-wire. |
| Grid connection | Electricity (Grid Code) Regulations 2022 | Government of Saint Lucia | Technical rules for connecting to and operating the grid; a new Grid Code Regulation is part of the 2026 Electricity Bill package. |
| Distributed generation interconnection | Interconnection policy/standards (draft) | Government / LUCELEC | Recorded by CCREEE in 2022 as a draft; in practice LUCELEC sets interconnection requirements for net-metered systems. |
| Metering accuracy | Electricity Supply Act, section 44 | Parliament of Saint Lucia | Meters must register within ±3% of a standard meter. |
| Appliance efficiency | SLNS 90, 91, 93, 94 and air-conditioner labelling | Saint Lucia Bureau of Standards | Energy-efficiency labelling for lamps, refrigerators and air conditioners. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Utility interconnection approval | Yes | National | Grid-tied systems need LUCELEC’s approval and a bi-directional meter; size caps of 5 kW (residential) and 25 kW (commercial) were reported in 2023. |
| Generation licence (rooftop) | Unknown | National | NURC licenses renewable generation, but no published threshold separating licensable from exempt small systems was identified. |
| Electrical inspection | Unknown | National | Electrical installations are governed by the regulations made under the Electricity Supply Act; the specific inspection procedure for PV systems is not published. |
| Planning permission | Unknown | National | Land development is governed by the Physical Planning and Development Act; no specific published rule for rooftop solar was identified. |
For a household, the gatekeeper is LUCELEC: it approves interconnection, enforces the size cap and fits the meter. Utility-scale projects face much longer processes. LUCELEC reported that its 10 MW solar farm was held up by land acquisition and regulatory approvals before the land agreement was signed in 2024.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering | Active | Net metering | Exported rooftop solar energy is offset through bi-directional metering under LUCELEC’s framework, within 5 kW (residential) / 25 kW (commercial) caps. Under review by NURC. | — |
| Import duty exemption for renewable energy equipment | Active | Import duty relief | Cabinet Conclusion #464 of 1999, amended by #969 of 2020, exempts from import duty apparatus that produces power, heat, light or electricity from renewable sources and energy-saving apparatus, as approved by the ministry responsible for sustainable development. Recorded as in force by CCREEE (2022); no later change identified. | — |
| Hybrid and sustainable-fuel vehicle duty concessions | Closed | Import duty and excise relief | Reduced import duty and excise for hybrid and sustainable-fuel vehicles under Cabinet Conclusion #282 of 2014, as extended, was effective until 30 November 2023. | 2014 – 30 Nov 2023 |
Data and connectivity.
- Fixed broadband
- 60.2 % of households (2022)Source 14Derived: 39,715 of 65,951 households reported broadband (cable, fibre or DSL) internet. The World Bank reports 68.2% of people using the internet in 2024.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Fixed broadband reaches about six in ten households and mobile data is widespread (35,402 households reported a smartphone data plan at the 2022 census). There is no public information on the communications technology behind LUCELEC’s meter reading or on any open protocol that third-party devices could use to interact with the grid.
Grid conditions.
- National peak demand
- 0.068 GW (2024)Source 867.61 MW (65.94 MW in 2023).
- Annual electricity demand
- 0.449 TWh (2024)Source 8Units generated or purchased (449.2 GWh); sales were 408.6 GWh and losses 6.1%.
- Generation capacity
- 0.091 GW (2024)Source 8Derived: 88.4 MW available diesel + 3 MW utility solar; excludes about 2.5 MW of rooftop PV.
- Interconnection
- 0 GWSource 10Isolated island grid with no cross-border links.
- Curtailment
- Not identified from a reliable public source.
The island grid peaks at under 70 MW and grew about 6% in 2024. With all firm capacity in one diesel station, reliability depends on the Cul de Sac site. Problems there in 2024, together with Tropical Storm Beryl, nearly doubled average outage time. LUCELEC plans to retire the older MAK engines at Station A in 2029 and is replacing the 66 kV switchgear at Castries substation.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| New Electricity Bill and regulations | Upcoming | 2026 (expected tabling) | A new Electricity Bill was presented to stakeholders and was expected to be tabled in Parliament in 2026. It comes with electrical licensing, customer code, grid code, network performance, tariff and wiring regulations, and is expected to reset renewable licensing, net-metering caps and pricing. |
| Troumassee 10 MW solar + 26.6 MWh battery | Upcoming | 2027 | LUCELEC’s second utility solar plant, with storage and a new 66/11 kV substation, is expected to be commissioned in 2027. |
| I-REC(E) certificates available | Current | 30 July 2026 | Saint Lucia was approved for issuance of international renewable energy certificates, with the Green Certificate Company as issuer. |
| Retirement of MAK engines at Station A | Upcoming | 2029 | LUCELEC plans to decommission the older MAK units at Cul de Sac. |
| End of LUCELEC’s 80-year exclusive licence term | Upcoming | 30 June 2045 | The licence under s.3 runs for 80 years from 1 July 1965. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 292 grid-tied rooftop systems (2.53 MW) at the end of 2024 among about 66,000 domestic customers; caps of 5 kW residential. |
| Distributed energy market | Low | Net metering exists only as a utility framework with small size caps; no aggregation or storage rules. |
| Grid flexibility market | Low | No wholesale, balancing, ancillary or demand-response market; LUCELEC balances the system internally. |
| Energy storage adoption | Low | No operating grid battery; the first (13.3 MW / 26.6 MWh) is planned for 2027. |
| Renewable growth environment | Low | Solar share around 2.8% (Ember 2025) and little change since the 3 MW farm opened in 2018; the 10 MW Troumassee project is the next step. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 24 sources
- Fuel Surcharge Cost Adjustment – applied to bills for October 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for September 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for July 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for May 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for March 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for January 2026. St. Lucia Electricity Services Limited, 2026. accessed 10 October 2026.
- Fuel Surcharge Cost Adjustment – applied to bills for October 2025. St. Lucia Electricity Services Limited, 2025. accessed 10 October 2026.
- Annual Report 2024 (vital statistics, operations review, ESG, operating statistics). St. Lucia Electricity Services Limited, 2025. accessed 10 October 2026.
- LUCELEC Summarised Vital Statistics. St. Lucia Electricity Services Limited, 2015. accessed 10 October 2026.
- Country Assessment Report – Saint Lucia (v1.0). International Tracking Standard Foundation (prepared by LUCELEC), 2026. accessed 10 October 2026.
- Saint Lucia approved for I-REC(E) issuance. International Tracking Standard Foundation, 2026. accessed 10 October 2026.
- St. Lucia Energy Report Card 2022. Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE), 2024. accessed 10 October 2026.
- Electricity Output and Consumption in Kilowatt Hours (KWh) Thousands, 2010 to 2023. Central Statistical Office of Saint Lucia, 2024. accessed 10 October 2026.
- Saint Lucia 2022 Population and Housing Census – Provisional Results. Central Statistical Office of Saint Lucia, 2024. accessed 10 October 2026.
- World Development Indicators – Saint Lucia (population, urban share, internet use, electricity access, exchange rate). World Bank, 2025. accessed 10 October 2026.
- Share of electricity production by source – Saint Lucia (Ember). Our World in Data / Ember, 2025. accessed 10 October 2026.
- Euro foreign exchange reference rates (9 October 2026). European Central Bank, 2026. accessed 10 October 2026.
- Saint Lucia plans 10 MW solar project. pv magazine, 2025. accessed 10 October 2026.
- NURC holds public consultation on renewable energy pricing and capacity limits. The Voice (Saint Lucia), 2023. accessed 10 October 2026.
- Saint Lucia – Corporate – Other taxes. PwC Worldwide Tax Summaries, 2026. accessed 10 October 2026.
- Electricity Supply Act, section 3 – Grant of licence. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
- Electricity Supply Act, section 4 – Licensing and regulation of electricity from renewable resources. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
- Electricity Supply Act, section 26 – Voltage of electricity supply. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
- Electricity Supply Act, section 44 – Meters. Attorney General’s Chambers, Saint Lucia (Revised Laws 2023), 2023. accessed 10 October 2026.
Questions about energy in Saint Lucia.
In October 2026 households paid EC$1.227 per kWh for the first 180 kWh a month and EC$1.277 above that. This is the 2026 base tariff plus a fuel surcharge of EC$0.415. For an average home using about 192 kWh a month, that works out at about EC$1.23 per kWh (around €0.41), or roughly EC$237 a month.
Because of the Fuel Surcharge Cost Adjustment. Each month LUCELEC compares the cost of the diesel it burned with what it would have cost at the previous year’s average price, and spreads the difference over units sold. It was −5.7 cents per kWh in January 2026 and +41.5 cents in October 2026.
Yes, within limits. LUCELEC connects grid-tied systems under a net-metering framework with bi-directional meters, and caps were reported in 2023 as 5 kW for homes and 25 kW for businesses. NURC is reviewing the caps and pricing as part of new electricity legislation.
No. LUCELEC holds a sole and exclusive licence to generate from fossil fuel and to transmit, distribute and sell electricity, which runs for 80 years from 1 July 1965. Only renewable generation has been opened to other licensees.
There is none. Because LUCELEC is the only supplier, a connection is identified by the LUCELEC customer account on the bill, together with the premises address and meter number. There is no national register or switching process.
Under 3%. Ember data show about 2.8% solar and 97.2% diesel in 2025. Solar capacity is about 6.3 MW, including the 3 MW La Tourney farm and roughly 2.5 MW of rooftop systems. A 10 MW solar farm with battery storage is planned for 2027.
The National Utilities Regulatory Commission (NURC), set up under the NURC Act of 2016. It regulates tariffs and service standards and licenses renewable generation. Energy policy sits with the Energy Division of the Ministry of Infrastructure, Ports and Transport.