How electricity works in Kosovo.
Kosovo electricity 2026: ERO-regulated block tariffs, KOSTT, KEDS distribution, KESCO supply, net billing for prosumers up to 7 kW, licensing and a lignite-heavy mix.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Kosovo energy at a glance.
Key figures for households in Kosovo. Each one links to its source on the full overview below.
Electricity price.
0.078 EUR per kWh for households, including taxes. Figures for 2026-S1.
Household use.
4,711 kWh a year for a typical household. Figures for 2024.
Renewable share.
9.4% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Kosovo.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Kosovo below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Kosovo requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Kosovo.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Kosovo, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Kosovo, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Kosovo.
The energy market in Kosovo, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Kosovo generates most of its electricity from lignite. In 2025, Eurostat monthly data show that 89.7% of net generation came from coal-fired plants, essentially the Kosova A and Kosova B power stations. Wind supplied 5.9%, hydropower 4.2% and solar 0.3%. Domestic generation does not cover demand. The Energy Regulatory Office (ERO, in Albanian Zyra e Rregullatorit për Energji, ZRRE) reports that demand reached 6,944 GWh in 2025, while domestic generation was 5,298 GWh. Imports filled the gap, especially at the winter peak.
Households are supplied under universal service at tariffs set by ERO. Since 1 May 2026 (decision V_3216_2026), a household with a two-rate meter pays a fixed charge of €2.32 a month. Energy costs 9.05 euro cents/kWh at the high (day) rate and 3.88 c/kWh at the low (night) rate for the first 800 kWh a month. Above 800 kWh the rates rise to 15.43 c and 7.28 c. Eurostat records an average household price of €0.0782/kWh including taxes for the first half of 2026, among the lowest in Europe.
The transmission system and market operator is KOSTT. A single distribution operator, KEDS, runs the low- and medium-voltage network, and KESCO is the universal-service supplier. ALPEX, the Albanian Power Exchange, runs a coupled day-ahead and intraday market for Kosovo and Albania. ERO Rule 03/2023 lets households install up to 7 kW of rooftop generation under a net-billing scheme.
Energy snapshot.
Headline figures for electricity in Kosovo. Each shows its data year and links to its source.
- Population1,576,876 peopleSource 62025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per household4,711 kWh/yrSource 22024
- Household price (EUR)0.078 EUR/kWhSource 12026-S1
- Renewable electricity share9.36 % of electricity consumptionSource 52024
- Solar capacity0.035 GWSource 10end 2025
- Wind capacity0.137 GWSource 10end 2025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy Regulatory Office (ERO / Zyra e Rregullatorit për Energji, ZRRE)
- System operator
- KOSTT (transmission, system and market operator)
- Distribution networks
- One distribution system operator, KEDS. In the four northern municipalities, customers are billed by the licensed supplier Elektrosever.
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Kosovo.
- Household price (EUR)
- 0.078 EUR/kWh (2026-S1)Source 1Eurostat average household price including all taxes, consumption band 2,500–4,999 kWh a year. Eurostat publishes only the tax-inclusive figure for Kosovo. ERO’s annual report gives an average household price of 8.17 c/kWh excluding VAT for 2025, which includes consumption in the dearer block above 800 kWh a month.
- Typical annual electricity bill
- 368 EUR/yr (2024–2026)Source 1Derived: 4,711 kWh per household connection (2024) multiplied by Eurostat’s 2026-S1 price of €0.0782/kWh including taxes. It is an indication, not an official typical bill. Households that use more than 800 kWh a month in winter pay considerably more per kWh.
Household price trend (EUR per kWh).Source 1
| 2018-S1 | 0.0569 EUR/kWh |
|---|---|
| 2018-S2 | 0.0579 EUR/kWh |
| 2019-S1 | 0.0537 EUR/kWh |
| 2019-S2 | 0.0528 EUR/kWh |
| 2020-S1 | 0.0525 EUR/kWh |
| 2020-S2 | 0.0525 EUR/kWh |
| 2021-S1 | 0.0522 EUR/kWh |
| 2021-S2 | 0.0535 EUR/kWh |
| 2022-S1 | 0.0555 EUR/kWh |
| 2022-S2 | 0.0583 EUR/kWh |
| 2023-S1 | 0.0603 EUR/kWh |
| 2023-S2 | 0.0662 EUR/kWh |
| 2024-S1 | 0.065 EUR/kWh |
| 2024-S2 | 0.066 EUR/kWh |
| 2025-S1 | 0.0679 EUR/kWh |
| 2025-S2 | 0.0783 EUR/kWh |
| 2026-S1 | 0.0782 EUR/kWh |
How the household price is set
Each year ERO sets the maximum allowed revenues of the universal-service supplier, the distribution operator and the transmission/market operator. The supplier then proposes retail tariffs that recover those revenues, and ERO approves them. For 2026 the universal-service supplier’s allowed revenue is €442.2 million (decision V_3213_2026), against €528.8 million requested. The tariff covers wholesale energy (largely bought from the state generator KEK), imports, transmission and distribution charges, and the supplier’s own costs. It also covers the cost of the Renewable Energy Fund, put at €8.724 million for 2026.
Blocks and the 800 kWh threshold
The two-block structure is designed to send a price signal on heavy use. The first 800 kWh in a month are charged at the lower block rates. Only consumption above 800 kWh is charged at the higher rates. Electric heating makes winter use high: household consumption billed in January 2025 was 448 GWh, more than twice the June figure of 193 GWh. Many homes therefore cross the threshold in winter, but not in summer.
Trend and comparison
Eurostat’s household price for Kosovo rose from €0.0522/kWh in early 2021 to €0.0782/kWh in early 2026. The largest jumps were in 2023 and 2025; for 2025, ERO raised regulated tariffs by 16.1% for all categories. The 2026 review left tariffs unchanged. ERO noted that KEK and KESCO had agreed to reschedule debts for January–March 2026 invoices, so that higher import costs were not passed on to customers at once. Even so, Kosovo’s household price remains among the lowest in Europe. On wholesale markets, ALPEX’s day-ahead price averaged €118.38/MWh in 2025.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Universal-service tariffs approved by ERO decision V_3216_2026 (7 May 2026), applied from 1 May 2026 until the next tariff review. A household with a two-rate meter (tariff group 5) pays a fixed charge of €2.32 per customer per month. For the first 800 kWh a month, energy costs 9.05 c/kWh at the high rate and 3.88 c/kWh at the low rate. Above 800 kWh it costs 15.43 c/kWh (high) and 7.28 c/kWh (low). The values are identical to the 2025 table in ERO’s annual report. |
| Time-of-use | Yes | Day/night pricing is built into the regulated tariff for households with two-rate meters. The high (day) rate applies 07:00–22:00 from 1 October to 31 March and 08:00–23:00 from 1 April to 30 September. All other hours are at the low rate. In May 2026 ERO declined KESCO’s proposal to remove the day/night split and the consumption blocks, saying such a change would need a separate impact analysis and consultation. |
| Other | Yes | Households with a single-rate meter (group 6) pay €2.32 a month plus 7.12 c/kWh up to 800 kWh and 12.39 c/kWh above that. Unmetered households (group 7) pay €2.32 a month plus 9.05 c/kWh on estimated consumption. Small businesses at 0.4 kV (category II) pay €3.87 a month plus 11.47 c/kWh at a single rate, or 13.92 c/6.90 c at high/low rates. |
| Variable | Limited | Unregulated supply is open to any customer. Universal service is limited by law to households and to non-household customers with no more than 50 employees, or annual turnover of no more than €10 million. Larger businesses moved to the free market in 2025. The Energy Community reports that only 2.22% of supply was at non-regulated prices, and no household switching. |
| Dynamic | No | No dynamic or wholesale-indexed household offers were identified. Most household meters are read monthly, by hand-held unit or remotely. |
Household prices compared with neighbouring countries (EUR per kWh).
- Serbia€0.119
- Albania€0.118
- North Macedonia€0.116
- Montenegro€0.104
- Kosovo€0.078
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,711 kWh/yr (2024)Source 2Derived: Eurostat household electricity consumption of 3,041.96 GWh in 2024 divided by the 645,688 household customers reported by the Energy Community. This is an average per household connection, not per census household. Electricity is widely used for space heating, which makes winter consumption high.
- Average daily use per household
- 12.9 kWh/day (2024)Source 2Derived: 4,711 kWh a year per household connection divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,908 kWh/person/yr (residential) (2024)Source 2Derived: 3,041.96 GWh of household consumption (Eurostat) divided by the World Bank 2024 population of 1,594,353.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households are the largest group of electricity users. Eurostat records 3,042 GWh of household consumption in 2024, out of 5,294 GWh of final electricity consumption (about 57%). ERO reports 3,393 GWh billed to regulated households in 2025, or 59.7% of electricity sold to final customers.
Demand is strongly seasonal because many homes heat with electricity. Billed household consumption ranged from 181 GWh in September 2025 to 448 GWh in January 2025. The national system peak of 1,624 MW was recorded at 18:00 on 31 December 2025. The minimum load was 317 MW, in June.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 50.9 % of population (2025)Source 7
About half of Kosovo’s population lives in urban areas (50.9% in 2025, World Bank). ERO’s tariff design treats houses and flats in the same way, but the self-consumption rules separate the two. A household on the low-voltage network can install up to 7 kW of its own generation. Residents of a multi-apartment block can become jointly-acting prosumers and share the output of a common installation, provided the total does not exceed the sum of their connection capacities (ERO Rule 03/2023).
The 2024 census (Kosovo Agency of Statistics) publishes tables on dwellings by type, heating method and main heating fuel. Their figures could not be verified for this profile, so housing tenure and dwelling-type shares are left blank.
How the grid works in Kosovo.
- TransmissionKOSTT
- DistributionOne distribution system operator, KEDS. In the four northern municipalities, customers are billed by the licensed supplier Elektrosever.
- MeteringKEDS
- Supply1 or more retail suppliers
Physically, most electricity comes from the lignite plants Kosova A (432 MW net) and Kosova B (528 MW net). Wind farms at Selac and Kitka, the Ujmani reservoir and about two dozen small hydro plants add to this, along with a growing number of solar parks. ERO counts 1,593 MW of installed capacity, of which about 1,261 MW is operational. KOSTT’s 400, 220 and 110 kV network links Kosovo with Albania, North Macedonia, Montenegro and Serbia. KEDS takes power from KOSTT substations and distributes it at 35, 20, 10 and 0.4 kV.
Commercially, KEK sells its output under a wholesale supply agreement to KESCO for universal-service customers and to cover network losses, and trades any surplus on ALPEX or bilaterally. Renewable generators in the support scheme sell through ALPEX under contracts for difference. Because the lignite units are inflexible, Kosovo often imports during daytime peaks and exports at night within the same day. ERO reports that commercial use of the interconnection with Serbia remained blocked in 2025, which raised the cost of imports.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Economy (Ministria e Ekonomisë) | Sets energy policy, including the Energy Strategy 2022–2031. It runs competitive renewable auctions (a first 50–100 MW wind auction was under evaluation in October 2026) and administers grant schemes for household renewables. |
| Regulator | Energy Regulatory Office (ERO / ZRRE) | Licenses energy activities and authorises construction of all new generation, including rooftop systems. It sets the allowed revenues and tariffs of KOSTT, KEDS and the universal-service supplier, approves network codes and market rules, keeps the register of renewable self-consumers and issues guarantees of origin. |
| TSO | KOSTT | State-owned transmission system and market operator. It balances the system as a regulating area within the Kosovo–Albania regulating block, allocates cross-border capacity (except on the border with Serbia) and manages congestion. |
| DSO | KEDS | The single distribution operator for the 35, 20, 10 and 0.4 kV networks. It owns and reads meters, connects new customers and prosumers, and keeps the meter register. It reported distribution losses of 995 GWh (15.05% of distribution demand) in 2025. |
| Supplier | KESCO | Universal-service supplier (FSHU) under a public service obligation set by ERO. It supplies all households and eligible small businesses at regulated tariffs, and also offers free-market contracts to businesses. |
| Supplier | Elektrosever | Licensed supplier for the four northern municipalities since 2024. In 2025 it had 24,429 active customers, of whom 21,718 were households (ERO annual report). |
| Exchange | ALPEX (Albanian Power Exchange) | Nominated electricity market operator for Albania and Kosovo, with a branch in Prishtina since May 2021. It runs a coupled day-ahead market (1.64 TWh traded in 2025 at an average €118.38/MWh) and intraday auctions (CRIDA). |
| Metering | KEDS | Under the DSO Metering Code (ERO decision V_1337_2020), metering systems on the distribution network belong to the distribution operator. The exception is the official metering between KOSTT and KEDS, which belongs to KOSTT. Customers cannot choose a meter operator. |
Compared with the UK system.
| UK concept | Kosovo equivalent | How it works |
|---|---|---|
| DNO | KEDS | One company runs the whole distribution network, so there is no regional patchwork as in GB. Its revenues and use-of-system charges are set by ERO (decision V_3215_2026 for 2026). Households do not see them as a separate line, because they are bundled into the regulated retail tariff. |
| National Grid / NESO | KOSTT | KOSTT combines transmission ownership, system operation and the national market operator role. GB splits these between National Grid Electricity Transmission, NESO and the market bodies. Day-ahead and intraday trading itself is run by ALPEX. |
| MPAN | Customer number (shifra e konsumatorit) on the KESCO bill, linked to a metering point in KEDS’s meter register | Kosovo has no published national metering-point code like the MPAN. A household is identified commercially by the customer number printed at the top of its bill, which KESCO illustrates as “DPR 00000”. Technically, it is identified by the meter, which KEDS records in its register by serial number, installation date and seal number. Suppliers ask business customers moving to the free market to list these customer codes for each supply point. |
| MPRN | No household gas network | ERO regulates natural gas under a separate law, but no household gas distribution network or gas supply-point identifier was identified. In Prishtina, heat is supplied through the Termokos district heating network. |
| Meter operator | KEDS (no competitive metering) | The distribution operator installs, seals, owns and reads meters. It may entrust reading to suppliers or contractors but remains responsible. Prosumers pay for their bidirectional meter and generation meter. |
| Supplier | KESCO (universal service) or a licensed supplier | All customers may legally use a licensed supplier at market prices. A standard switch takes 21 calendar days. In practice, households stay with KESCO at ERO tariffs. |
| Smart-meter infrastructure (DCC / SMETS2) | No national smart-meter programme; KEDS installs remotely read meters | There is no central data company. KEDS is adding meters with GSM/GPRS and PLC communication. Customers with remotely read meters can see near-real-time consumption in the eKesco app. Others are read by hand-held unit once a month. |
How a supply point is identified.
DPR 48213
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Customer number (shifra / numri i konsumatorit) linked to a metering point in KEDS’s meter register (Shifra e konsumatorit) |
| Who issues it? | KESCO (or the customer’s licensed supplier) for the customer number on the bill; KEDS for the metering point and meter |
| Format | No public format is published. KESCO’s help centre shows the customer number as a letter prefix followed by digits, using the example “DPR 00000”. The metering-point record in KEDS’s register holds the meter serial number, installation, removal and re-installation dates, seal number, test date and accuracy after calibration (DSO Metering Code). |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | At the top of the electricity bill, according to KESCO. The same number is used in the eKesco app and on the fatura.kesco-energy.com portal to view and pay bills. The meter serial number is on the meter itself. |
| Electronic access | The eKesco app and web portal show monthly bills and consumption comparisons. Customers with remotely read meters can also see real-time readings. Businesses applying to move to the free market use openmarket.kesco-energy.com and list their customer codes for each supply point. |
| Third-party access | Under the DSO Metering Code, meter data may be accessed by KEDS, its control centre, KOSTT (for planning), the customer and any supplier contracted to the customer. A supplier needs the customer’s written authorisation, presented to KEDS. Rule 04/2026 on renewable energy communities adds a right for communities and authorised parties to receive official metering and energy-sharing data from the network operator. No consumer-facing data-sharing service for third parties such as aggregators was identified. |
| Who keeps the register | KEDS keeps the register of all meters on the distribution network. For electronic meters it must also keep a database of 12 months of monthly billing readings and a five-year archive. ERO keeps a separate register of renewable self-consumers (name, address, technology, location, installed capacity and connection capacity). |
| Register scope | National |
Kosovo does not give households a standard, published supply-point code like the British MPAN or the EU-style EAN. A connection is identified through two linked records. The first is the customer number on the supplier’s bill, which the customer uses for payments, complaints and applications. The second is the metering point in the distribution operator’s register, which ties a specific meter (by serial number and seal) to a connection.
How it is used
A new household connection starts with an application to KEDS. KEDS inspects the property, issues a technical acceptance report and installs a meter. The customer then takes that report to a licensed supplier and signs a supply contract. KEDS must energise the metering point within 48 hours of the supplier’s request. A customer who wants to become a prosumer goes through KEDS for connection consent and through ERO for authorisation. KEDS then replaces the meter with a bidirectional one, and the customer signs a self-consumption agreement with the supplier. ERO’s rules do not state publicly whether the customer number stays with the property when it changes hands, so that is left open here.
Metering and data
Billing is monthly. The Metering Code allows meters to be read manually, through the meter’s optical port, or remotely. KESCO says that meters read with hand-held units generate bills only when field teams take a reading. Remotely read meters feed data continuously. In multi-storey buildings the Code requires a total meter with remote reading plus an individual meter for each customer.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Net billing under ERO Rule 03/2023. Surplus fed into the grid earns a euro credit valued at 85% of ERO’s energy-component supply price for each tariff period (80% for medium-voltage customers). This credit is netted against the value of energy taken from the grid in the same monthly billing period. Unused credit carries forward for up to six months and resets on 1 January and 1 July. Network charges are not netted. |
| How large can a prosumer system be? | Within the net-billing scheme: 7 kW for households at 0.4 kV; 15 kW for non-household 0.4 kV customers not billed for power; 100 kW for 0.4 kV customers billed for power; 200 kW at medium voltage or transmission. In all cases the system cannot exceed the contracted connection capacity. Larger systems can still gain prosumer status outside the scheme. |
| How is surplus electricity valued? | Surplus is valued at a coefficient times the energy component of ERO’s supply price for each tariff period, without network charges or taxes. The coefficient is 0.85 at 0.4 kV and 0.80 at higher voltages. Outside the scheme, the coefficient is negotiated with the supplier but cannot be below 0.70. |
| Is there a limit on how much can be exported? | Yes. Annual surplus injected must be lower than annual withdrawals from the grid. A prosumer that produces more than 10% above its consumption over a calendar year loses prosumer status once the network operator verifies it. |
| Do prosumers pay any extra charge? | Yes. All prosumers pay a prosumer fee on the energy they inject, equal to the system-operator and market-operator tariffs plus a 3% margin for KEDS’s reading and billing services. |
| Can neighbours in a block of flats share solar power? | Yes. Two or more customers in the same building can become jointly-acting prosumers with a contract setting how the shared output is split. KEDS collects the metering data and the supplier bills each member as an individual prosumer. Since July 2026, Rule 04/2026 also allows renewable energy communities. |
| What technical protections are required? | A disconnection switch at or next to the connection point, automatic shutdown on loss of grid voltage (island operation is forbidden), and a bidirectional meter plus one or more generation meters. |
Connecting a home system.
- Check the size limit. A household on the 0.4 kV network may install up to 7 kW within the net-billing scheme. The allowed power is also capped by the customer’s connection capacity and calculated from its annual consumption. A new customer gets 50% of the allowed power at first.
- Ask KEDS for grid connection consent. The application must include an electrical project prepared by a licensed engineering company.
- Apply to ERO for authorisation to build and for prosumer status, with the KEDS consent, municipal permit, annual consumption and expected annual production. ERO decides within 30 days.
- Submit the electrical project and the entry-permit form to KEDS. Install the system, then request technical acceptance with the ERO decision attached. KEDS must issue the certificate of admission within seven calendar days.
- Sign the connection agreement with KEDS. Ask KEDS to replace the meter with a bidirectional meter, at your own cost.
- Sign the prosumer supply contract (net-billing) with your supplier. Under the scheme, power purchase agreements run for 12 years.
Kosovo moved from kWh net metering to net billing in 2023. Under ERO’s 2017 support-scheme rule, surplus kWh were credited to the next bill and any balance was cancelled without payment at the end of the calendar year. Rule 03/2023 repealed those articles. Surplus is now converted to money at a discount to the regulated energy price, and the credit lasts up to six months. Customers authorised under the 2017 rule keep their original terms.
Uptake is growing from a low base. ERO issued 283 decisions authorising solar self-consumption in 2025, totalling 11.062 MW. Its board continued to approve batches in 2026, such as 19 systems totalling 388.2 kW at the end of July. The Energy Community reports 17 MW of prosumer capacity, which fed 6 GWh into the grid. With household tariffs as low as 3.88–9.05 c/kWh within the first block, savings from self-consumption are modest. They are larger for homes that regularly exceed 800 kWh a month.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | ERO generation licence for plants above 5 MW. Plants of 5 MW or less need only ERO’s authorisation for construction. All new generating capacity needs that authorisation (Rule 03/2022). | ERO | Thermal (heat) generation needs a licence above 1 MW. Solar park licences have been issued for 25 years, and wind licences for up to 40 years. |
| Self-consume and export (prosumer) | No licence. ERO authorisation and prosumer-status decision, KEDS connection consent and a contract with the supplier. Net-billing thresholds: 7 / 15 / 100 / 200 kW by customer type. | ERO; KEDS | Prosumers outside the support scheme must file their surplus-sale contract with ERO, unless they are zero-export. |
| Store electricity | No separate storage licence identified. Prosumers may store their own output (Rule 03/2023 definition). Grid-scale batteries attached to generation have been handled by ERO as a modification of the construction authorisation. | ERO | In July 2026 ERO accepted in principle a request by Solar Energy Group Europe to add a battery energy storage system to its authorisation, subject to documentation. |
| Sell electricity to customers (supply) | ERO supply licence. | ERO | ERO issued 11 supply licences in 2025, including licences recognised from Albania and North Macedonia on a reciprocity basis. Universal service is a public service obligation assigned by ERO to KESCO. |
| Trade electricity (wholesale) | ERO wholesale supply (trading) licence, issued for five years. | ERO | Trading on ALPEX also requires exchange membership. ALPEX had 45 exchange members at the end of 2025. |
| Aggregate customers or assets | No aggregator licence regime identified. Rule 04/2026 lets renewable energy communities sell surplus through an aggregator or other authorised market participant. | ERO (market rules) | Detailed rules for independent aggregators were not identified. |
| Balancing and grid services | Provided to KOSTT under the Grid Code (Balancing Code) and the Market Rules (version 3.2 approved in 2026). | KOSTT; ERO | No route for household-scale or aggregated assets into balancing services was identified. |
| Virtual power plant / remote control of assets | No specific licensing regime identified. | — | A VPP would need to work through a licensed supplier or trader and KOSTT’s balancing arrangements. |
| Form a renewable energy community | ERO authorisation under Rule 04/2026 (adopted 31 July 2026). Installations up to 10 MW connect to KEDS, larger ones to KOSTT. | ERO; KEDS or KOSTT | Energy shared within a community is not treated as supply to third parties and does not create a separate balancing obligation. |
Kosovo separates two steps that many systems combine. Every new generating installation, from a 3 kW roof to a 100 MW solar park, first needs ERO’s authorisation for construction. A generation licence is required only above 5 MW. Small producers, including all prosumers, therefore deal with ERO once for authorisation and status, and then with KEDS and their supplier.
The 2023 prosumer rule and the 2026 rule on renewable energy communities, adopted under Law No. 08/L-258 on promoting the use of renewable energy sources, introduced shared self-consumption and the concept of selling through aggregators. No standalone licence for aggregators, storage operators or VPPs was identified.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Day-ahead market (ALPEX) | Restricted | — | Limited | ALPEX. Coupled day-ahead market for the Albanian and Kosovo bidding zones, with prices converging more than 99% of the time in 2025. Access is through licensed producers, suppliers and traders that are exchange members. |
| Intraday auctions (CRIDA) | Restricted | — | Limited | ALPEX. Complementary regional intraday auctions: 29,442 MWh traded in 2025 at an average €139.17/MWh. |
| Balancing (aFRR and mFRR) | Developing | — | Unknown | KOSTT. KOSTT is fully responsible for balancing its regulating area within the Kosovo–Albania regulating block. A planned battery project includes 45 MW for KOSTT’s secondary regulation. No route for aggregated small assets was identified. |
Kosovo’s system has little flexible capacity. ERO describes it as designed for lignite base load, not for following peaks or balancing. The Ujmani reservoir is the only sizeable dispatchable hydro plant. As a result, Kosovo relies on imports and on the coupled market with Albania, whose large hydro fleet complements Kosovo’s thermal plants.
Demand-side flexibility for households is limited to the regulated day/night tariff. No household demand-response or aggregation programme was identified.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| ALPEX | Albanian Power Exchange, serving the Albania and Kosovo bidding zones. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme; KEDS is gradually installing remotely read GSM/GPRS and PLC meters |
| Reading interval | Monthly billing reads; real-time data for remotely read meters |
| Responsible party | KEDS (distribution system operator) |
| Meter ownership | KEDS, under the DSO Metering Code (V_1337_2020) |
| Remote meters installed in 2025 | 7,668 GSM/GPRS + 22,577 PLC (ERO annual report) |
| Mechanical meters replaced in 2025 | 31,843 replaced with digital meters |
| Data retention | 12 months of billing reads; 5-year archive |
| Consumer access | eKesco app and fatura.kesco-energy.com portal |
Kosovo has no legislated smart-meter roll-out target or central data hub. KEDS is replacing old meters as part of its investment plan, which ERO approves. In 2025 it installed more than 30,000 meters with remote communication and replaced about 32,000 mechanical meters, while fitting 30,132 meters for new connections. Remote reading also helps against non-technical losses: ERO puts these at 323 GWh in 2025, including the northern municipalities.
For customers, the visible change is the eKesco app. Households with remotely read meters see current consumption. Others see a monthly bill based on a hand-held reading. Prosumers need a bidirectional meter at their own cost, plus a generation meter.
Renewable electricity.
Electricity generation mix (2025).
- Coal (lignite): 89.7%
- Wind: 5.9%
- Hydro: 4.2%
- Solar: 0.3%
- Renewable electricity share
- 9.36 % of electricity consumption (2024)Source 5Eurostat SHARES renewable share of electricity (RES-E). This share of consumption is used because Kosovo is a net importer: ERO reports imports of 1,965 GWh against exports of 377 GWh in 2025, with demand of 6,944 GWh. Renewables were 10.3% of domestic net generation in 2025 (Eurostat monthly data, derived) and 8.5% of gross generation in 2024 (571.6 of 6,749.9 GWh).
- Home solar
- 17 MW (2025 (Energy Community reporting))Source 8Prosumer installed capacity reported by the Energy Community, all customer types, not only households. ERO authorised a further 11.062 MW for self-consumption in 2025.
- Solar added each year
- 21.5 MW (2025)Source 10Six new solar plants connected in 2025, according to ERO. Excludes self-consumption systems.
- Wind
- 0.137 GW (end 2025)Source 10Derived: 103.41 + 32.40 + 1.35 MW.
- Hydro
- 0.132 GW (end 2025)Source 10Derived: 55.25 MW outside the support scheme (including Ujmani, 35 MW) plus 77.18 MW of small hydro in the scheme.
- Solar PV (ground-mounted)
- 0.035 GW (end 2025)Source 10Derived: 35.48 MW of plants in the support-scheme list. Excludes self-consumption systems.
Targets.
- The Energy Community lists a 2030 renewable energy target of 32% for Kosovo, against an overall renewable share of 18.0% in 2024 (Eurostat).
- The Ministry of Economy plans to add 200 MW of wind beyond its first 50–100 MW auction, aiming for about 300 MW of wind capacity.
Renewables supply only about a tenth of Kosovo’s electricity, but the share is rising. Eurostat’s renewable share of electricity rose from 5.2% in 2021 to 9.4% in 2024. The largest renewable plant is the 103.4 MW Selac (SOWI Kosova) wind farm, which produced 252 GWh in 2025. Wind has produced more than hydro in every year since 2022.
Alongside the support scheme of ERO’s 2017 rule, new capacity is now procured through competitive auctions. ERO set a ceiling price of €80.2/MWh for a 100 MW wind auction, and supported generators sell through ALPEX under contracts for difference. ERO also authorised several large solar parks in 2025–2026, including 100 MW at Rahovec, 84 MW near Peja and 80 MW in Istog. Under Law No. 08/L-258, ERO issues guarantees of origin.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Kosovo’s main flexibility gap, an inflexible lignite fleet and evening winter peaks, makes storage a policy priority. The planned MCC battery is the flagship project. Prosumers may store their own output under Rule 03/2023, and renewable energy communities may store surplus under Rule 04/2026. No dedicated storage licence or household battery incentive was identified.
Storage projects.
- MCC-financed battery storage project: Battery installation of 170 MW, including 45 MW intended for KOSTT’s secondary frequency regulation. It is financed through a Millennium Challenge Corporation programme. The project was briefly paused in 2025 and confirmed to continue after a review at the end of July 2025 (ERO annual report).
- Solar Energy Group Europe (SEGE) battery integration: In July 2026 ERO accepted in principle a request to modify SEGE’s authorisation to add a battery energy storage system, subject to the required documentation.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| KESCO | Universal-service supplier for all households outside the four northern municipalities (about 739,000 bills a month in late 2025) | No | Yes | No | Yes |
KESCO supplies almost all customers at ERO-regulated tariffs. Elektrosever supplies the four northern municipalities. In 2025 several other licensed suppliers began supplying business customers that left universal service, among them Future Energy Trading and Exchange Dynamics, VoltKos, EDS International KS, Enerco and the state generator KEK. KEK also acted as temporary last-resort supplier until 30 July 2025. The Energy Community counts six active suppliers and no household switching.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Economy | Government | Energy policy, renewable auctions, household grant schemes | Runs wind and solar auctions and publishes calls for renewable subsidies. |
| Energy Regulatory Office (ERO / ZRRE) | Regulator | Licensing, authorisation, tariffs, network codes | Authorises every prosumer and generator and sets all regulated tariffs. |
| KOSTT | Transmission | Transmission system and market operator | Balances the system and manages interconnection with neighbouring grids. |
| KEDS | Distribution | Distribution system operator and meter owner | Grants connection consent and fits bidirectional meters for prosumers. |
| ALPEX | Market | Power exchange for Albania and Kosovo | Runs the coupled day-ahead and intraday markets. |
| KESCO | Consumer | Universal-service supplier | Signs the net-billing contracts that prosumers need. |
| Kosovo Agency of Statistics (ASK) | Government | Official statistics, including the 2024 census | Source of census data on households, dwellings and heating. |
| Energy Community Secretariat | Regulator | Monitors transposition of EU energy law | Publishes comparable market indicators and implementation scores for Kosovo. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Prosumer technical requirements | ERO Rule 03/2023 on Prosumers of Renewable Sources, Article 12 | ERO | Disconnection switch, automatic shutdown on loss of grid voltage (no island mode), bidirectional and generation meters, compliance with network-code quality requirements. KEDS was required to draft detailed technical criteria for ERO approval. |
| Distribution connection | Distribution Code (ERO decision V_1338_2020) | ERO / KEDS | Connection and operating rules for the distribution network. |
| Metering | DSO Metering Code (ERO decision V_1337_2020) | ERO / KEDS | Meter ownership, registers, reading methods and data access. |
| Transmission connection and balancing | Grid Code v2.4 (Connection Code, Balancing Code, Operational Code) | ERO / KOSTT | ERO also publishes an Electrical Standards Code (v1.3) and a code for wind generation stations. |
| PV module quality (grant scheme) | IEC / EN / ISO certification | Ministry of Economy | The 2024 household PV grant required modules certified to IEC or equivalent EU-market standards, with efficiency of at least 20% and degradation of at most 0.8% a year. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| ERO authorisation and prosumer status | Yes | National | Needed for every self-consumption installation. ERO decides within 30 days of application. |
| DSO connection consent (KEDS) | Yes | National | Issued before the ERO application. KEDS must give prosumer applications priority and decide within 30 calendar days. |
| Municipal permit | Yes | Local | KEDS lists a municipal permit among the documents for the ERO application. |
| Licensed engineering company and project | Yes | National | The electrical project must be prepared by a licensed engineering company and signed by a qualified engineer. |
| Supplier contract | Yes | National | A net-billing contract (12 years) inside the scheme, or a bilateral surplus contract outside it. Zero-export systems are exempt from the surplus-contract filing. |
The process involves ERO, KEDS, the municipality and the supplier. It is more administrative than in many EU countries, because even a small household system needs an individual ERO decision. ERO publishes these decisions, so the register of approved systems is public.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net-billing support scheme for prosumers | Active | Net billing | ERO Rule 03/2023. Surplus is credited at 85% of the regulated energy price (80% at medium voltage) for up to six months, under 12-year contracts. Limited to 7 kW for households. | Since 2023 |
| Household PV self-consumption grant (Ministry of Economy) | Closed | Grant | €250 per kWp, up to €1,750, for thermally insulated, occupied houses using at least 4,000 kWh a year, with a maximum of 7 kWp. It was part of the government’s €75 million energy-crisis action plan linked to EU IPA 2023 funding. A parallel call supported solar water heaters. | Feb 2024 – 30 Dec 2024 |
| Renewable auctions with contracts for difference | Active | Contract for difference | Competitive auctions run by the Ministry of Economy. A first 50–100 MW wind auction was at the bid-evaluation stage in October 2026. ERO’s 2025 report records a ceiling price of €80.2/MWh set for a 100 MW wind auction. Supported generators sell on ALPEX under contracts for difference. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
KEDS uses two communication methods for remotely read meters: GSM/GPRS mobile data and power-line communication (PLC) over the low-voltage network. Customer-facing data are provided through the eKesco mobile app and web portal. No official broadband or mobile coverage figures were verified for this profile.
Grid conditions.
- National peak demand
- 1.624 GW (2025)Source 10Recorded at 18:00 on 31 December 2025, up from 1,472 MW in 2024.
- Annual electricity demand
- 6.944 TWh (2025)Source 10National demand including network losses, up 5.04% on 2024.
- Generation capacity
- 1.593 GW (end 2025)Source 10Installed capacity. ERO considers about 1,261 MW operational; the units Kosova A1 and A2 are out of service.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Kosovo’s grid is short of flexible capacity. The two lignite plants are old and often trip: ERO notes that their reliability is falling year by year. They cannot follow the evening peak, which reached 1,624 MW in December 2025. Imports rose 42% in 2025 to 1,965 GWh, at an average contract price of €121.56/MWh.
Network losses are high. Distribution losses were 995 GWh (15.05% of distribution demand) in 2025. ERO estimates technical losses at 10.16%, and the rest is non-technical, including unbilled consumption in the northern municipalities. Transmission losses were 1.41% of energy entering the transmission network.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| 2026 universal-service tariffs | Current | 1 May 2026 | ERO decision V_3216_2026 keeps household tariffs at their 2025 levels: €2.32 a month fixed; 9.05/3.88 c/kWh up to 800 kWh; 15.43/7.28 c/kWh above. |
| Rule 04/2026 on renewable energy communities | Current | 31 July 2026 | Lets citizens, businesses and municipalities form communities to produce, store and share renewable electricity, and sell surplus directly, through an aggregator or via their supplier. |
| Market Rules version 3.2 | Current | 2026 | ERO decision V_3210_2026 approved a revised version of the market rules. |
| Wind auctions | Upcoming | Bids under evaluation, October 2026 | First 50–100 MW wind auction in evaluation. The Ministry of Economy plans a further 200 MW with IFC support. |
| 170 MW battery storage project | Upcoming | In preparation | MCC-financed battery project, including 45 MW for KOSTT’s secondary regulation. |
| Review of the household tariff structure | Upcoming | Not scheduled | ERO deferred KESCO’s proposal to remove day/night and block pricing until a separate impact analysis and consultation take place. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | About 17 MW of prosumer capacity (Energy Community) and 11 MW authorised in 2025, with a 7 kW cap for households. |
| Distributed energy market | Low | Net billing and energy communities exist in rules, but there is no smart-meter programme or aggregator framework. |
| Grid flexibility market | Low | Day-ahead and intraday markets exist on ALPEX, but no route for small or aggregated assets into balancing was identified. |
| Energy storage adoption | Low | No operational grid-scale or household battery capacity identified; a 170 MW project is planned. |
| Renewable growth environment | Medium | The renewable share of electricity rose from 5.2% (2021) to 9.4% (2024) (Eurostat). Wind, solar and storage auctions and authorisations are in progress. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 24 sources
- Electricity prices for household consumers (nrg_pc_204), Kosovo, band DC. Eurostat, 2026. accessed 9 October 2026.
- Complete energy balances (nrg_bal_c), Kosovo, electricity. Eurostat, 2024. accessed 9 October 2026.
- Gross electricity production by fuel (nrg_bal_peh), Kosovo. Eurostat, 2024. accessed 9 October 2026.
- Net electricity generation by type of fuel – monthly data (nrg_cb_pem), Kosovo. Eurostat, 2025. accessed 9 October 2026.
- Share of energy from renewable sources (nrg_ind_ren), Kosovo. Eurostat, 2024. accessed 9 October 2026.
- Population, total (SP.POP.TOTL), Kosovo. World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total) (SP.URB.TOTL.IN.ZS), Kosovo. World Bank, 2025. accessed 9 October 2026.
- Kosovo – contracting party page (key electricity indicators). Energy Community Secretariat, 2025. accessed 9 October 2026.
- Decision V_3216_2026 on retail electricity tariffs for universal-service customers. Energy Regulatory Office (ZRRE), 2026. accessed 9 October 2026.
- Raporti Vjetor 2025 (Annual Report 2025). Energy Regulatory Office (ZRRE), 2026. accessed 9 October 2026.
- Rule No. 03/2023 on Prosumers of Renewable Sources. Energy Regulatory Office (ZRRE), 2023. accessed 9 October 2026.
- Rule No. 10/2017 on the Support Scheme for Renewable Energy Generators. Energy Regulatory Office (ZRRE), 2017. accessed 9 October 2026.
- Rule No. 04/2026 on Renewable Energy Communities in Kosovo. Energy Regulatory Office (ZRRE), 2026. accessed 9 October 2026.
- Communiqué – ERO Board Session IX of 2026. Energy Regulatory Office (ZRRE), 2026. accessed 9 October 2026.
- Vendimet 2026 (ERO decisions 2026). Energy Regulatory Office (ZRRE), 2026. accessed 9 October 2026.
- Kodet (network, distribution and metering codes). Energy Regulatory Office (ZRRE). accessed 9 October 2026.
- Metering Code of the Distribution System Operator (decision V_1337_2020). Energy Regulatory Office (ZRRE), 2020. accessed 9 October 2026.
- Prosumatorët (prosumer connection process). KEDS. accessed 9 October 2026.
- Konsumatorët e rinj (new connections). KEDS. accessed 9 October 2026.
- Pyetjet e shpeshta (frequently asked questions). KESCO. accessed 9 October 2026.
- Më 30 korrik përfundon furnizimi nga FMF-KEK. KESCO, 2025. accessed 9 October 2026.
- Public call to support household consumers investing in photovoltaic systems. Ministry of Economy, 2024. accessed 9 October 2026.
- Ministria e Ekonomisë dhe IFC zgjerojnë bashkëpunimin për zhvillimin e ankandeve të energjisë nga era. Ministry of Economy, 2026. accessed 9 October 2026.
- ALPEX – Albanian Power Exchange. ALPEX. accessed 9 October 2026.
Questions about energy in Kosovo.
Households on universal service pay €2.32 a month plus, for the first 800 kWh, 9.05 c/kWh by day and 3.88 c/kWh at night (ERO decision V_3216_2026, from 1 May 2026). Consumption above 800 kWh costs 15.43 c and 7.28 c. Eurostat’s average household price was €0.0782/kWh including taxes in the first half of 2026.
Not very. About 90% of domestic generation comes from lignite. Renewables (wind, hydro and solar) produced 10.3% of net generation in 2025. Eurostat’s renewable share of electricity was 9.4% in 2024.
Yes, under net billing. With ERO authorisation, a household can install up to 7 kW. Surplus earns a euro credit worth 85% of the regulated energy price, which offsets the energy part of later bills for up to six months.
There is no published national code. A home is identified by the customer number printed at the top of the KESCO bill, linked to a meter that KEDS records in its meter register by serial number.
KOSTT runs the transmission system and the national market. KEDS runs the distribution network. ERO regulates both. KESCO is the universal-service supplier for households.
No licence is needed below 5 MW, but every installation needs ERO authorisation for construction and prosumer status, plus connection consent from KEDS and a municipal permit.
Legally yes; a standard switch takes 21 days. In practice, households stay with KESCO at regulated tariffs, and the Energy Community reports no household switching.