How electricity works in Albania.
Albania electricity 2026: ERE-regulated household prices, OST, OSSH distribution, metering points, self-producer net metering up to 500 kW, licensing and hydro-solar mix.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Albanian lek (ALL) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Albania energy at a glance.
Key figures for households in Albania. Each one links to its source on the full overview below.
Electricity price.
11.4 ALL per kWh for households, including taxes. Figures for 2025-S2.
Household use.
4,508 kWh a year for a typical household. Figures for 2024.
Renewable share.
99.1% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Albania.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Albania below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Albania requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Albania.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Albania, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Albania, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Albania.
The energy market in Albania, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Albania produces almost all of its electricity from renewable sources. In 2025, Eurostat monthly data show that 83.5% of net generation came from hydropower and 15.6% from solar photovoltaics. Fossil-fuel plants supplied less than 1%. Because hydro output depends on rainfall, the country swings between being a net importer and a net exporter from year to year. Its electricity sector is regulated by the Energy Regulatory Authority (Enti Rregullator i Energjisë, ERE).
Most households buy electricity from the universal service supplier at prices set each year by ERE. For 2026, ERE decision no. 322 of 15 December 2025 sets the household energy price at 8.5 ALL/kWh where monthly consumption stays at or below 700 kWh. If consumption goes above 700 kWh, 9.5 ALL/kWh applies to the whole month’s consumption. Eurostat records an average household price of 11.4 ALL/kWh including taxes (€0.1175) for the second half of 2025, which is among the lowest in Europe.
The networks are run by the state-owned transmission system operator OST and a single distribution system operator, OSSH, which is part of the OSHEE group. Law no. 24/2023 on renewable energy lets households and businesses become self-producers with systems of up to 500 kW. The Albanian Power Exchange, ALPEX, runs day-ahead and intraday markets for Albania and Kosovo.
Energy snapshot.
Headline figures for electricity in Albania. Each shows its data year and links to its source.
- Population2,335,930 peopleSource 21 Jan 2026
- Households755,950 householdsSource 172023 census
- Average household size3.2 people/householdSource 172023 census
- Electricity use per household4,508 kWh/yrSource 32024
- Household price (ALL)11.4 ALL/kWhSource 12025-S2
- Household price (EUR)0.118 EUR/kWhSource 12025-S2
- Renewable electricity share99.1%Source 42025
- Solar capacity0.72 GWSource 5end 2024
- Wind capacity0 GWSource 5end 2024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy Regulatory Authority (Enti Rregullator i Energjisë, ERE)
- System operator
- OST (Operatori i Sistemit të Transmetimit)
- Distribution networks
- One national DSO, OSSH (Operatori i Sistemit të Shpërndarjes), part of the state-owned OSHEE group
- Currency
- Albanian lek (ALL)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Albania.
- Household price (ALL)
- 11.4 ALL/kWh (2025-S2)Source 1Eurostat average household price including all taxes for annual consumption of 2,500–4,999 kWh. Eurostat gives 9.5 ALL/kWh excluding taxes, so its breakdown implies 20% VAT. Eurostat has reported the same 9.5 / 11.4 ALL/kWh every half-year since 2018. It has not reflected the lower 8.5 ALL/kWh tier that ERE’s tariff tables apply to households using up to 700 kWh a month since February 2025.
- Household price (EUR)
- 0.118 EUR/kWh (2025-S2)Source 1Eurostat’s own EUR figure for the same band, so no separate conversion was applied. It implies about 97.0 ALL per EUR (11.4 ÷ 0.1175), Eurostat’s rate for the second half of 2025.
- Typical annual electricity bill
- 51,391 ALL/yr (2024–2025)Source 1Derived: average consumption of 4,508 kWh per occupied household (2024) multiplied by Eurostat’s 2025-S2 price of 11.4 ALL/kWh including VAT (about €530). A household consuming within the 8.5 ALL/kWh tier would pay less, so treat this as an upper indication rather than an official typical bill.
Household price trend (ALL per kWh).Source 1
| 2018-S2 | 11.4 ALL/kWh |
|---|---|
| 2019-S1 | 11.4 ALL/kWh |
| 2019-S2 | 11.4 ALL/kWh |
| 2020-S1 | 11.4 ALL/kWh |
| 2020-S2 | 11.4 ALL/kWh |
| 2021-S1 | 11.4 ALL/kWh |
| 2021-S2 | 11.4 ALL/kWh |
| 2022-S1 | 11.4 ALL/kWh |
| 2022-S2 | 11.4 ALL/kWh |
| 2023-S1 | 11.4 ALL/kWh |
| 2023-S2 | 11.4 ALL/kWh |
| 2024-S1 | 11.4 ALL/kWh |
| 2024-S2 | 11.4 ALL/kWh |
| 2025-S1 | 11.4 ALL/kWh |
| 2025-S2 | 11.4 ALL/kWh |
How the household price is set
ERE approves each year the retail prices charged by the universal service supplier to household and small customers. It also sets the network tariffs and the price paid to existing priority (feed-in) producers. For 2026 the transmission tariff is 0.85 ALL/kWh (decision no. 279, 16 December 2024, valid for 2025–2027). The distribution tariff for customers at 0.4 kV is 6.42 ALL/kWh, for January–April 2026 (decision no. 312, 12 December 2025). Existing priority producers are paid 10 ALL/kWh in 2026 (decision no. 324). The household retail price is a single bundled figure per kWh. The bill does not split it into energy and network components, as it does in many EU countries.
The 700 kWh threshold
Until January 2025, households paid a flat 9.5 ALL/kWh. From 1 February 2025, ERE’s tables introduced a lower 8.5 ALL/kWh price for households using up to 700 kWh a month, and this continued for 2026. The threshold is applied to the whole month. A household that uses 701 kWh pays 9.5 ALL/kWh on every unit, so there is a jump in the bill at the threshold. An average occupied household uses about 375 kWh a month, well within the lower tier. Heavy winter users of electric heating can cross it.
Trend and comparison
Eurostat’s series in lek has not changed since 2018. Rising euro values, from €0.091/kWh in late 2018 to €0.1175/kWh in late 2025, reflect the lek strengthening against the euro, not price rises. Albania’s regulated household price stayed fixed through the 2022 energy crisis. Wholesale prices were much higher: the Energy Community reports an average baseload day-ahead price of €112/MWh on ALPEX.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Universal service prices approved by ERE (decision no. 322, 15 December 2025) for 1 January–31 December 2026. Households pay 8.5 ALL/kWh if they use up to 700 kWh in a month. Above 700 kWh, 9.5 ALL/kWh applies to all of that month’s consumption, not just the excess. Electricity for the common parts of apartment buildings (stair lighting, pumps and lifts) costs 9.5 ALL/kWh. ERE’s tables show prices before VAT; Eurostat’s data imply 20% VAT on top. |
| Time-of-use | Limited | Households have no peak/off-peak tariff in the 2026 table. Non-household customers at 0.4 kV pay 14 ALL/kWh, or 16.1 ALL/kWh in the evening peak (18:00–22:00 from November to March, 19:00–23:00 from April to October). |
| Variable | Limited | ERE’s general conditions of supply give all customers the right to choose a domestic or foreign supplier at unregulated prices and to switch free of charge. In practice households remain on universal service. The Energy Community reports that 13.29% of supply was at non-regulated prices, with 13 active suppliers. |
| Other | Yes | Electric-vehicle charging points of more than 11 kW connected at 0.4 kV have their own regulated price: 22 ALL/kWh, or 25.3 ALL/kWh at peak. |
| Dynamic | No | No dynamic or wholesale-indexed household offers were identified. Households are read monthly. |
Household prices compared with neighbouring countries (EUR per kWh).
- Italy€0.316
- Greece€0.238
- Albania€0.118
- North Macedonia€0.116
- Montenegro€0.104
- Kosovo€0.078
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,508 kWh/yr (2024)Source 3Derived: Eurostat household electricity consumption of 3,407.9 GWh in 2024 divided by the 755,950 households counted at the 2023 census. It is a national average per occupied household, not a metered median. Divided across the 1,158,186 household connections, the figure would be about 2,940 kWh.
- Average daily use per household
- 12.4 kWh/day (2024)Source 3Derived: 4,508 kWh a year divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,442 kWh/person/yr (residential) (2024)Source 3Derived: 3,407.9 GWh of household consumption divided by the population of 2,363,314 on 1 January 2025 (Eurostat).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households account for about half of final electricity use. Eurostat records 3,408 GWh of household consumption in 2024, against total final electricity consumption of 6,743 GWh. Household demand has been broadly flat at 3,280–3,500 GWh since 2021, even as the resident population fell.
Air-conditioner ownership has risen sharply since 2011, according to the census. The 2023 census found that 11.4% of households own a solar panel, up from 2.7% in 2011. The census does not separate solar water heaters from photovoltaic panels.
Housing and households.
- Dwellings
- 1,082,529 dwellings (2023 census)Source 17Conventional dwellings. 726,325 (67.1%) were occupied, a vacancy rate of 32.9%.
- Owner-occupied
- 82.5 % of households (2023 census)Source 17Includes households in the process of acquiring the legal ownership title.
- Private rented
- 8.8 % of households (2023 census)Source 17All rented dwellings. A further 8.7% had another tenure arrangement.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 60.1 % of dwellings (2023 census)Source 17Derived: detached 47.0% + semi-detached 8.1% + row/terraced 5.0% of conventional dwellings.
- Apartments and flats
- 39.9 % of dwellings (2023 census)Source 17
- Urban population
- 58.9 % of population (2025)Source 19
Most Albanian households own their homes: 82.5% at the 2023 census. Ownership of the roof or building is therefore rarely a barrier to rooftop solar on houses. Apartment blocks are a different case: they make up 39.9% of dwellings and are concentrated in Tirana, Durrës and other cities. There, a rooftop system needs the agreement of other owners. Law no. 24/2023 allows self-producers in the same building to act jointly and share energy produced on site.
The housing stock is relatively new: 36.4% of conventional dwellings were built after 2000. A high vacancy rate (32.9%) reflects emigration and holiday homes on the coast. This explains why the number of household electricity connections is much larger than the number of resident households.
How the grid works in Albania.
- TransmissionOST sh.a. (Operatori i Sistemit të Transmetimit)
- DistributionOne national DSO, OSSH (Operatori i Sistemit të Shpërndarjes), part of the state-owned OSHEE group
- MeteringOSSH (and OST at transmission level)
- Supply2 or more retail suppliers
Physically, most electricity comes from large hydropower plants on the Drin cascade (Fierza, Koman and Vau i Dejës, operated by the state company KESH) and smaller private hydro plants. A fast-growing fleet of solar parks adds to this. Power flows through OST’s high-voltage network to substations, where OSSH takes it over its 35, 20, 10, 6 and 0.4 kV networks to homes. Hydro output follows rainfall, so cross-border trade fills gaps in dry years. Eurostat records imports of 2,669 GWh and exports of 2,335 GWh in 2024, and a net export of 920 GWh in 2023.
Commercially, a household on universal service has one contract with FSHU. FSHU buys electricity largely from KESH and from priority producers, and pays for transmission and distribution. OSSH reads the meter monthly and passes the data on for billing and settlement. Suppliers and traders are responsible to OST for imbalances. Under Law no. 43/2015, ERE can exempt universal-service customers from imbalance responsibility.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Infrastructure and Energy (Ministria e Infrastrukturës dhe Energjisë) | Sets energy policy, runs the competitive auctions for solar and wind support, and proposes the Council of Ministers decisions that implement Law no. 24/2023, including the rules for self-producers. |
| Regulator | Energy Regulatory Authority (ERE) | Licenses generation above 1 MW, transmission, distribution, supply, trading and market operation. Approves network and universal-service tariffs, network codes, supply contract conditions and the price paid to priority producers. |
| TSO | OST sh.a. (Operatori i Sistemit të Transmetimit) | State-owned transmission owner and system operator. Responsible for balancing, cross-border capacity and metering at transmission level. |
| DSO | OSSH sh.a. (Operatori i Sistemit të Shpërndarjes) | Single national distribution operator in the OSHEE group. Connects customers and self-producers, owns and reads meters, and keeps the meter registration system and the register of renewable self-generators. |
| Supplier | FSHU sh.a. (Furnizuesi i Shërbimit Universal) | Universal service supplier in the OSHEE group, supplying households and small customers at ERE-approved prices. |
| Supplier | FTL sh.a. (Furnizuesi i Tregut të Lirë) | Free-market supplier in the OSHEE group. Under Law no. 24/2023 it also performs the Renewable Energy Operator’s duties until that operator is set up. |
| Exchange | ALPEX (Albanian Power Exchange) | Runs the day-ahead market and intraday auctions for the Albanian and Kosovo bidding zones, with offices in Tirana and Prishtina. In September 2026 it announced Nord Pool as the new provider of its trading and clearing platforms. |
| Metering | OSSH (and OST at transmission level) | Law no. 43/2015 makes the system operators responsible for metering and meter reading in their networks. They may contract independent metering operators with ERE’s approval. Households cannot choose a meter operator. |
Compared with the UK system.
| UK concept | Albania equivalent | How it works |
|---|---|---|
| DNO | OSSH (Operatori i Sistemit të Shpërndarjes) | A single company runs the medium- and low-voltage networks for the whole country, so there is no regional patchwork as in GB. Its distribution tariffs are set by ERE by voltage level (6.42 ALL/kWh at 0.4 kV in early 2026). Households do not see them as a separate line, because they are bundled into the regulated retail price. |
| National Grid / NESO | OST | OST combines the roles that GB splits between National Grid Electricity Transmission and NESO. It owns the high-voltage network and also balances the system and manages interconnection with neighbouring systems. |
| MPAN | Contract number (numri i kontratës) plus the metering point record in the DSO’s meter registration system (Sistemi i Regjistrimit të Matësave, SRM) | Albania has no published equivalent of the MPAN. The Metering Code requires the system operator to keep each metering point in the SRM, recording the meter serial number, the connection point and address, the customer ID and the supplier ID. On the household side, the supply contract number is the reference used for bills, payments and applications such as connecting a solar system. |
| MPRN | No household gas supply-point identifier identified | ERE regulates natural gas transmission (2.6457 ALL/kWh in 2026), but no household gas supply-point identifier or residential gas distribution scheme was identified, so no MPRN equivalent is described here. |
| Meter operator | OSSH (no competitive metering) | The distribution operator installs, seals and reads meters. Seals on the terminal cover, meter box and limiter are recorded in the supply contract. Self-producers pay for a bidirectional meter that meets OSSH’s specifications. |
| Supplier | FSHU (universal service) or a licensed supplier | Households can legally choose any licensed supplier and switch free of charge. Almost all stay with FSHU at prices ERE approves each year. |
| Smart-meter infrastructure (DCC / SMETS2) | No national smart-meter programme identified | There is no central data company. Under Law no. 43/2015, smart metering depends on the DSO’s economic assessment and a ten-year implementation timetable approved by the minister. ERE must ensure interoperability. The Metering Code allows remote reading by agreement, but the standard is a monthly reading. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Supply contract number (numri i kontratës) linked to a metering point in the meter registration system (SRM) (SRM — Sistemi i Regjistrimit të Matësave) |
| Who issues it? | OSHEE group: OSSH (distribution operator, metering point and meter) and FSHU (universal-service supply contract) |
| Format | No public format is published. The Metering Code requires each metering point record in the SRM to hold: the meter’s technical specification and serial number, the call number for remotely read meters, the connection point and address, the customer’s ID number, the supplier’s ID number, the installation date and test records. The universal-service contract also records the meter serial number, the meter seals, the number of phases and the name of the substation (kabina) supplying the property. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the electricity bill. ERE’s contract conditions require each bill to show the technical data of the connection point and the customer’s identification data. Payments must quote the contract number, invoice number and customer name. The meter serial number is on the meter and in the contract. |
| Electronic access | OSHEE’s online portal (online.oshee.al) is used for bills, debt checks and service requests. New connection requests go through lidhje.oshee.al. For a household connection of up to 20 kW, the applicant submits ID, a site plan and proof of ownership, and must deposit the documents within five days of the online application. |
| Third-party access | Under the Metering Code, the data in the SRM are confidential. They are administered under the market rules and made available to authorised parties in the format the Code sets. A new supplier arranges the switch with the DSO, and the customer has the right to switch free of charge under ERE’s rules on changing supplier. No consumer-facing data-sharing service for third parties such as aggregators was identified. |
| Who keeps the register | OSSH keeps the meter registration system for the distribution network, including any change of user, meter or disconnection, and keeps records for at least ten years. OSSH also keeps the register of renewable self-generators (name, location, capacity and start date) required by Law no. 24/2023. |
| Register scope | National |
Albania does not give households a standard, published supply-point identifier like the British MPAN or the EU-style EAN code. A connection is identified through two linked records. The first is the supply contract, whose number the customer uses for bills, payments and applications. The second is the metering point record in the distribution operator’s meter registration system (SRM), which ties a specific meter, by serial number, to an address, a connection point, a customer ID and a supplier ID.
How it is used
When a household asks to connect a photovoltaic system, OSSH’s document checklist asks for the number of the existing supply contract, with no unpaid debt, and the customer’s identity card. The contract number is therefore the practical handle for any change to a connection. When a property changes hands or a new contract is signed, the new contract is linked to the same meter and connection point in the SRM. ERE’s rules do not state publicly whether the contract number itself stays with the property, so that is left open here.
Metering and data
The Metering Code requires meters to be read and recorded every month, for the electricity balance and billing. Readings at other intervals, or remote (online) reading, are allowed by agreement between the parties. A remotely read meter has a “call number” stored in its SRM record. Meters must be verified by the General Directorate of Metrology before use and periodically afterwards, and customers may install additional meters at their own expense.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Limited |
| How exported electricity is paid | Annual net metering per metering point. Electricity fed into the grid offsets consumption, with the balance and invoice settled once a year. Law no. 24/2023 provides for a move to monthly net invoicing, with surplus valued at a price set by ERE under a Council of Ministers methodology. No decision bringing this into effect was confirmed as of October 2026. |
| How large can a self-producer system be? | Up to 500 kW for renewable self-generators, under Article 20 of Law no. 24/2023. The same limit applied under the previous Law no. 7/2017. Systems of 10.8 kW or less connect by simple notification to the distribution operator. |
| How is surplus electricity credited? | Under the transitional rule in Law no. 24/2023 and as OSHEE describes it, the net balance is calculated and invoiced annually for each metering point. Surplus offsets consumption within a period of up to one year. |
| What changes under Law no. 24/2023? | Article 20 gives self-generators the right to generate, consume, store and sell their surplus, including through bilateral agreements with suppliers and peer-to-peer trading. A Council of Ministers decision is to set a net-invoicing compensation scheme (monthly invoice for the difference between consumption and injection) and the rules for selling surplus. ERE then sets the price, which must reflect the market value of the energy and avoid cross-subsidies. |
| Can neighbours in a block of flats share solar power? | Yes in law. Self-generators in the same building, including multi-apartment blocks, may act jointly and share the renewable energy produced on site. Network charges, fees and taxes still apply to each participant. |
| Can a third party own the system? | Yes. The law allows a third party to own or manage the installation, provided it remains subject to the self-generator’s instructions. |
Connecting a home system.
- Size the system. Self-producers may install up to 500 kW. OSSH asks for a declaration of average annual consumption over the last two years, or an energy audit by a certified auditor if there is no history, together with the proposed capacity.
- Have a licensed engineer prepare the connection project in line with the Distribution Code. The designer must hold licence category 10C for design, and the installer category NP10 for execution.
- Obtain the municipality’s acknowledgement for works carried out under a prior declaration of works (Council of Ministers decision no. 408 of 13 May 2015 on territorial development).
- Submit the application to OSSH with ID, the existing contract number (with no debt), the technical report, inverter data and the proposed bidirectional meter model. Installations of 10.8 kW or less, or single-phase equivalents, connect after notifying the DSO.
- Install the system and a bidirectional meter at your own cost, plus a generation meter after the main inverter, to OSSH’s specifications.
- OSSH connects the installation and records it in the register of self-generators. Net metering then applies to the metering point.
Albania’s self-producer regime is generous on size. A household can in principle install the same 500 kW cap as a business. In practice, OSSH asks for consumption history or an energy audit to justify the proposed capacity, which ties system size to the applicant’s own demand. Self-producers bear the cost of the connection and of bidirectional and generation meters.
With regulated household prices of 8.5–9.5 ALL/kWh before VAT, the savings from self-consumption are modest by European standards. Annual netting is valuable because it lets summer solar surplus offset winter consumption, when electric heating is used. The planned move to monthly net invoicing at a market-based price would reduce that benefit.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | ERE generation licence for plants above 1 MW. Exempt: generators, including grid-connected self-producers, with installed capacity up to 1 MW, and self-producers not connected to the grid (Law no. 43/2015, Article 37). | ERE | Exempt generators must still follow the market rules and network codes. Licences for generation can last up to 30 years. |
| Self-consume and export (self-producer) | No licence up to 500 kW. Connection approval from OSSH; notification only for 10.8 kW or less. | OSSH; municipality (prior declaration of works) | Law no. 24/2023, Articles 18 and 20. OSSH records each installation in its register of self-generators. |
| Store electricity | Law no. 43/2015 has no separate storage licence. Storage at a self-producer site falls within the self-generator rights of Law no. 24/2023, and priority producers may use their own storage. Grid-scale stand-alone storage may be supported through capacity mechanisms decided by the minister. | Ministry; ERE (approval of support schemes) | No ERE licensing rule specific to stand-alone batteries was identified, so developers should check with ERE how a project would be classified. |
| Sell electricity to customers (supply) | ERE supply licence for any supply to end customers. | ERE | Universal-service and last-resort supply are public service obligations assigned to licensed suppliers. |
| Trade electricity (wholesale) | ERE trading licence. | ERE | Trading on ALPEX also requires membership under its market rules. |
| Aggregate customers or assets | Aggregation is defined in Law no. 24/2023 and renewable energy communities may provide it. No separate aggregator licence exists in Law no. 43/2015. | ERE (market rules) | Detailed rules for independent aggregators were not identified. |
| Balancing and grid services | Participation through OST’s balancing arrangements under the market rules. Suppliers and traders are balance-responsible to OST. | OST; ERE | No household-scale or aggregated route into balancing services was identified. |
| Virtual power plant / remote control of assets | No specific licensing regime identified. | — | A VPP would need to work through a licensed supplier or trader and the balancing rules. |
| Operate a distribution or transmission network | ERE licence (distribution or transmission system operation). No licence needed for a direct line. | ERE | Local government units may hold licences except for transmission and market operation. |
Albania’s licensing threshold is simple. Any grid-connected generator up to 1 MW, including a self-producer, is exempt from ERE’s generation licence. Households and small businesses with rooftop systems therefore deal with OSSH and the municipality, not the regulator. Separate ERE licences are needed for supply, trading, network operation and market operation. ERE may issue several of them to the same company.
Newer activities such as aggregation, energy communities and peer-to-peer trading are recognised in Law no. 24/2023. Their detailed operating rules depend on secondary legislation that had not all been identified as adopted by October 2026.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Day-ahead market (ALPEX) | Restricted | — | Limited | ALPEX. Day-ahead auctions for the Albanian and Kosovo bidding zones. Access is through licensed traders, suppliers and producers that are ALPEX members. Small distributed assets take part only through such a participant. |
| Intraday auctions (CRIDA) | Restricted | — | Limited | ALPEX. ALPEX runs complementary regional intraday auctions in sessions (CRIDA-1, -2 and -3). |
| Balancing services | Developing | — | Unknown | OST. OST is responsible for balancing the system under Law no. 43/2015. No route for aggregated small assets was identified. |
Albania’s main source of flexibility is its large hydro reservoirs, which can store water across seasons and ramp quickly. That limits the immediate need for demand-side flexibility. Law no. 24/2023 introduces the concepts of aggregators, renewable energy communities and peer-to-peer trading, and lets communities access energy markets directly or through aggregation. Without smart metering for households and detailed market rules for independent aggregators, distributed flexibility is still at an early stage.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| ALPEX | Albanian Power Exchange for Albania and Kosovo; moving to Nord Pool’s platform. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme identified; monthly reading is standard |
| Reading interval | Monthly reading (Metering Code); shorter intervals by agreement |
| Responsible party | OSSH (distribution system operator) |
| Legal basis | Law no. 43/2015, Article 78 (intelligent metering systems) |
| Roll-out decision | DSO cost-benefit assessment, then a 10-year timetable approved by the minister |
| Interoperability | To be ensured by ERE nationwide |
| Meter register | SRM, kept by the system operator |
The Power Sector Law makes the distribution operator responsible for metering. It required OSSH to prepare an economic assessment of intelligent metering within a year of the law taking effect. A ten-year implementation timetable would follow, subject to the minister’s approval. No public figure for the share of households with smart or remotely read meters was identified.
The Metering Code, approved by ERE in 2008, still describes monthly readings as the norm, with remote reading possible by agreement. Self-producers must fit a bidirectional meter at their own cost, as well as a generation meter after the inverter.
Renewable electricity.
Electricity generation mix (2025).
- Hydro: 83.5%
- Solar: 15.6%
- Fossil fuels: 0.9%
- Renewable electricity share
- 99.1% (2025)Source 4Derived from Eurostat monthly net generation: 8,455 GWh from renewables out of 8,534 GWh in 2025 (hydro 7,128 GWh, solar 1,327 GWh). Albania is not a large net importer: Eurostat’s 2024 balance shows net imports of 334 GWh, and in 2023 it was a net exporter of 920 GWh.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 513 MW (2024)Source 5Derived: Eurostat net capacity of 719.6 MW at end 2024 minus 206.7 MW at end 2023.
- Hydro
- 2.556 GW (end 2024)Source 5
- Solar PV
- 0.72 GW (end 2024)Source 5Up from 100 MW in 2022 and 207 MW in 2023.
- Wind
- 0 GW (end 2024)Source 5
Targets.
- Law no. 24/2023 sets the framework for national renewable targets and trajectories in line with Albania’s Energy Community obligations, supported through contracts for difference awarded by competitive auction.
Albania’s electricity has been almost entirely renewable for decades, because of its hydropower. The new development is solar. Eurostat records net solar capacity rising from 100 MW in 2022 to 720 MW in 2024, and solar generation reached 1,327 GWh (15.6% of the total) in 2025. Large solar parks have been supported through auctions run by the ministry. The state generator KESH also operates a photovoltaic plant at Qyrsaq.
Law no. 24/2023 replaced feed-in tariffs for new projects with market-based support, awarded by competitive bidding as contracts for difference or premiums, normally for up to 15 years. A Renewable Energy Operator acts as the counterparty. Existing priority producers keep their power purchase agreements, paid at 10 ALL/kWh in 2026, with the option of converting to contracts for difference once ERE judges the market liquid. No wind generation was recorded by Eurostat up to 2025.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Law no. 24/2023 has a chapter on storage. The minister may support stand-alone storage through capacity mechanisms if OST’s system adequacy assessment or the network development plan shows a need. The Council of Ministers may support on-site storage paired with renewables through grants, loans or premiums awarded competitively. Self-producers have the right to store their own electricity, and priority producers may use storage to cover their obligations.
The country’s large hydro reservoirs already provide seasonal storage, which reduces the system need for short-duration batteries compared with many neighbours. No grid-scale battery capacity figure was identified.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| FSHU — Furnizuesi i Shërbimit Universal (OSHEE group) | Universal service; supplies almost all households (about 87% of supply was at regulated prices) | No | Limited | No | Yes |
| FTL — Furnizuesi i Tregut të Lirë (OSHEE group) | — | Unknown | Unknown | Unknown | Unknown |
The Energy Community reports 13 active suppliers in Albania, with 13.29% of supply at non-regulated prices. Competitive supply is used by larger business customers. Households are almost all supplied by FSHU under universal service. The full list of licensed suppliers and traders is published in ERE’s licensees register.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Infrastructure and Energy | Government | Energy policy, renewable auctions, secondary legislation | Drafts the Council of Ministers decisions that set self-producer compensation and support schemes. |
| Enti Rregullator i Energjisë (ERE) | Regulator | Energy regulator | Sets tariffs and universal-service prices, licenses market actors and publishes codes and contracts. |
| OST sh.a. | Transmission | Transmission system operator | Operates the high-voltage grid, balancing and interconnections. |
| OSSH sh.a. | Distribution | Distribution system operator | Handles connections, metering and the self-producer register. |
| OSHEE Group | Distribution | State group comprising OSSH, FSHU and FTL | Customer portal, new connections and self-producer information. |
| ALPEX | Market | Power exchange for Albania and Kosovo | Publishes day-ahead and intraday prices and volumes. |
| KESH (Korporata Elektroenergjetike Shqiptare) | Renewable Energy | State-owned generator | Operates the Drin hydropower cascade, the Vlora thermal plant and the Qyrsaq solar plant. |
| INSTAT | Government | National statistics institute | Census data on households, dwellings and amenities. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Distribution Code (Kodi i Shpërndarjes), ERE decision no. 100 of 26 August 2008 | ERE / OSSH | Self-producer connection projects must comply with it. |
| Metering | Metering Code (Kodi i Matjes), ERE decision no. 101 of 26 August 2008 | ERE | Defines the meter registration system, accuracy classes and monthly reading. |
| Bidirectional meter | OSSH technical standards; MIE instruction no. 3 of 20 June 2019 (net metering scheme) | OSSH; Ministry of Infrastructure and Energy | The self-producer pays for the meter, which must meet OSSH’s specifications. |
| Installer qualification | Professional licence category 10C (design) and NP10 (execution) | Licensing of engineers under Albanian construction law | Required by OSSH for the engineer signing the PV connection project. |
| Meter verification | Legal metrology rules | General Directorate of Metrology | Meters must be verified before use and periodically. |
| Inverters / anti-islanding | No national standard identified | — | OSSH asks for data on the main inverter. Specific product standards were not identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO connection approval | Yes | National | Application to OSSH with technical project and meter proposal. Notification only for 10.8 kW or less. |
| Municipal works declaration | Yes | Local | Prior declaration of works with the municipality under Council of Ministers decision no. 408/2015. |
| ERE generation licence | No | National | Not needed up to 1 MW. |
| Owners’ consent in apartment blocks | Limited | Local | Needed where the roof is common property. Joint self-consumption in the same building is allowed under Law no. 24/2023. |
For a household, the permission path is short: a licensed engineer’s project, a declaration to the municipality and an application to OSSH. Systems up to 10.8 kW benefit from a notification-only connection under Law no. 24/2023.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for self-producers | Active | Net metering | Annual netting of injected and consumed electricity per metering point for systems up to 500 kW. | — |
| Contracts for difference for renewable generators | Active | Contract for difference | Support awarded through competitive auctions under Law no. 24/2023, normally for up to 15 years, with the Renewable Energy Operator as counterparty. Aimed at utility-scale plants. | — |
| Feed-in price for existing priority producers | Closed | Feed-in tariff | Closed to new entrants under Law no. 24/2023. Existing priority producers are paid 10 ALL/kWh for 2026 (ERE decision no. 324, 15 December 2025). | — |
Data and connectivity.
- Fixed broadband
- 24.9 fixed subscriptions per 100 people (2024)Source 20The 2023 census found that more than 74% of households had an internet connection.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Fixed broadband reached 24.9 subscriptions per 100 people in 2024 (World Bank). Household internet access rose from 12.3% in 2011 to more than 74% in 2023, according to the census. No national smart-meter communications standard was identified. The Metering Code refers to remote reading through a chosen communication technology and application software, by agreement.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 8.725 TWh (2024)Source 18Gross electricity consumption reported by the Energy Community (its net import figure of 334 GWh matches Eurostat’s 2024 balance).
- Generation capacity
- 3.213 GW (2024)Source 18Total installed capacity reported by the Energy Community, with 96.53% renewable.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Albania’s system is dominated by hydropower: about 2.56 GW of hydro out of 3.2 GW in total. Generation follows rainfall. In a wet year Albania exports. In a dry year it imports heavily, with 2,669 GWh of imports in 2024. Cross-border trade with Kosovo is organised through the shared ALPEX day-ahead market.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| 2026 regulated household prices | Current | 1 January 2026 | ERE decision no. 322 keeps 8.5 ALL/kWh up to 700 kWh a month and 9.5 ALL/kWh on all consumption above that. |
| Law no. 24/2023 on renewable energy | Current | In force since 2023 | Replaced Law no. 7/2017. Introduced contracts for difference, a Renewable Energy Operator, renewable energy communities, aggregation and a 500 kW self-generator regime. |
| Net invoicing for self-producers | Upcoming | Pending Council of Ministers decision | Article 20 of Law no. 24/2023 provides for a net-invoicing compensation scheme with an ERE-set price for surplus. Adoption was not confirmed as of October 2026. |
| ALPEX moves to Nord Pool platform | Upcoming | Announced 3 September 2026 | ALPEX announced Nord Pool as the new provider of its trading and clearing platforms. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential PV figure identified. Self-producer net metering exists, but low regulated prices limit the savings. |
| Distributed energy market | Low | Distributed generation is supported legally (500 kW self-generators, energy communities), but no smart-meter roll-out or aggregator rules were identified. |
| Grid flexibility market | Low | Day-ahead and intraday markets exist on ALPEX, but no route for small or aggregated assets into balancing was identified. |
| Energy storage adoption | Low | No official battery capacity identified. Law no. 24/2023 allows support schemes for storage. |
| Renewable growth environment | High | Solar capacity rose from 100 MW (2022) to 720 MW (2024), and solar reached 15.6% of generation in 2025 (Eurostat). |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 24 sources
- Electricity prices for household consumers (nrg_pc_204), Albania, band DC. Eurostat, 2025. accessed 9 October 2026.
- Population on 1 January (tps00001), Albania. Eurostat, 2026. accessed 9 October 2026.
- Complete energy balances (nrg_bal_c), Albania, electricity. Eurostat, 2024. accessed 9 October 2026.
- Net electricity generation by type of fuel – monthly data (nrg_cb_pem), Albania. Eurostat, 2025. accessed 9 October 2026.
- Electricity production capacities for renewables (nrg_inf_epcrw), Albania. Eurostat, 2024. accessed 9 October 2026.
- Tarifat dhe Çmimet e energjisë elektrike dhe gazit natyror për vitin 2026. Enti Rregullator i Energjisë (ERE), 2025. accessed 9 October 2026.
- Tarifat dhe Çmimet e energjisë elektrike dhe gazit natyror për periudhën 1 Shkurt – 31 Dhjetor 2025. Enti Rregullator i Energjisë (ERE), 2025. accessed 9 October 2026.
- Tarifat dhe Çmimet e energjisë elektrike dhe gazit natyror për periudhën 1–31 janar 2025. Enti Rregullator i Energjisë (ERE), 2025. accessed 9 October 2026.
- Law no. 24/2023 on the promotion of the use of energy from renewable sources (English translation). Enti Rregullator i Energjisë (ERE), 2023. accessed 9 October 2026.
- Law no. 43/2015 on the power sector, as amended (English translation). Enti Rregullator i Energjisë (ERE), 2018. accessed 9 October 2026.
- Vetëprodhuesit. OSHEE Group. accessed 9 October 2026.
- Dokumentacion për impiant fotovoltaik vetëprodhues. OSHEE Group, 2023. accessed 9 October 2026.
- Lidhje e re. OSHEE Group. accessed 9 October 2026.
- Kushtet e përgjithshme të kontratës së shërbimit universal të furnizimit me energji elektrike (ERE decision no. 15, 10.01.2018). Enti Rregullator i Energjisë (ERE), 2018. accessed 9 October 2026.
- Rregullorja mbi kushtet e përgjithshme të shërbimit të furnizimit me energji elektrike për klientët fundorë (ERE decision no. 203, 18.12.2017). Enti Rregullator i Energjisë (ERE), 2017. accessed 9 October 2026.
- Kodi i Matjes (ERE decision no. 101, 26.08.2008). OSSH / ERE, 2008. accessed 9 October 2026.
- Population and Housing Census 2023 – Main Results. INSTAT, 2024. accessed 9 October 2026.
- Albania – Contracting Party profile (key energy data). Energy Community Secretariat, 2024. accessed 9 October 2026.
- Urban population (% of total population), Albania. World Bank, 2025. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people), Albania. World Bank, 2024. accessed 9 October 2026.
- ALPEX – Albanian Power Exchange. ALPEX. accessed 9 October 2026.
- KESH – Korporata Elektroenergjetike Shqiptare. KESH. accessed 9 October 2026.
- Kode (Distribution Code and Metering Code). OSSH. accessed 9 October 2026.
- Energy Profile: Albania. IRENA, 2025. accessed 9 October 2026.
Questions about energy in Albania.
Households on universal service pay 8.5 ALL/kWh if they use up to 700 kWh a month, and 9.5 ALL/kWh on all their consumption if they use more (ERE decision no. 322, 2026). Eurostat’s all-in household price was 11.4 ALL/kWh (€0.1175) in the second half of 2025.
About 99% of net generation was renewable in 2025: 83.5% hydro and 15.6% solar, according to Eurostat monthly data.
Yes. Self-producers with systems up to 500 kW can feed surplus into the distribution grid. Under the current arrangement it is netted against consumption once a year for each metering point. Law no. 24/2023 also lets self-producers sell surplus to suppliers.
There is no published standard code. A connection is identified by the supply contract number used on bills and payments, linked to a metering point record in OSSH’s meter registration system. That record holds the meter serial number, address, customer ID and supplier ID.
OST operates the transmission grid. OSSH, part of the state-owned OSHEE group, runs the distribution network nationwide. ERE regulates both.
No ERE licence is needed for generators up to 1 MW. A household needs a licensed engineer’s project, a declaration of works to the municipality and connection approval from OSSH. Systems up to 10.8 kW connect by notification.
Yes. All customers have the legal right to choose and switch supplier free of charge, but almost all households stay with the universal service supplier at ERE-approved prices.