How electricity works in Madagascar.
Madagascar electricity market 2026: JIRAMA tariffs, ARELEC regulation, isolated grids, hydro and solar, self-production declarations, surplus sales and licensing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Malagasy ariary (MGA) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Madagascar energy at a glance.
Key figures for households in Madagascar. Each one links to its source on the full overview below.
Electricity price.
370 MGA per kWh for households, including taxes. Figures for 2018–2026.
Renewable share.
53% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Madagascar.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Madagascar below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Madagascar requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Madagascar.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Madagascar, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Madagascar, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Madagascar.
The energy market in Madagascar, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Madagascar’s public electricity service is dominated by JIRAMA (Jiro sy Rano Malagasy), a state-owned company created in 1975 that produces, transports, distributes and sells electricity and also runs the public water service. Independent producers sell power to JIRAMA, and in rural areas private operators run mini-grids under authorisations awarded with the support of the rural electrification agency ADER. The sector is governed by Law 2017-020 on the Electricity Code, promulgated on 10 April 2018, which turned the former regulator ORE into the Autorité de Régulation de l’Électricité (ARELEC), an independent administrative authority.
The island has no electrical link with any other country. Electricity is supplied through several separate networks run by JIRAMA, of which the interconnected network around Antananarivo (RIA) is the largest, plus many isolated grids in smaller towns. Access is low: the World Bank estimates that 42.5% of the population had electricity in 2024, 75.9% in towns but 26.5% in rural areas.
Generation is split between hydropower and oil-fired thermal plants, with a growing share of solar. IRENA counts 875 MW of installed capacity in 2024, of which 193 MW hydro and 58 MW solar; in 2023 renewables produced 53% of the 2,087 GWh generated. The 2017 Electricity Code lets households and businesses generate their own power under a simple declaration regime, offset production through a bidirectional meter and sell a capped share of renewable surplus to the network.
Energy snapshot.
Headline figures for electricity in Madagascar. Each shows its data year and links to its source.
- Population32,740,678 peopleSource 12025
- Households6,079,876 householdsSource 62018
- Average household size4.2 people/householdSource 62018
- Electricity use per householdNot identified from a reliable public source.
- Household price (MGA)370 MGA/kWhSource 102018–2026
- Household price (EUR)0.074 EUR/kWhSource 92026
- Renewable electricity share53%Source 82023
- Solar capacity0.058 GWSource 82024
- Wind capacity0 GWSource 82024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Autorité de Régulation de l’Électricité (ARELEC)
- System operator
- JIRAMA (separate interconnected and isolated networks)
- Distribution networks
- JIRAMA in towns; private mini-grid operators under authorisations or concessions in rural areas
- Currency
- Malagasy ariary (MGA)
- Voltage and frequency
- Nominal low-voltage level and frequency not confirmed from an official source
Electricity prices in Madagascar.
- Household price (MGA)
- 370 MGA/kWh (2018–2026)Source 10Energy price of the general low-voltage residential tariff (BT Général Résidentiel) in tariff zone 1, first band (up to 130 kWh), from the grid published by the regulator (ORE/NP02/2017) and applied from January 2018. JIRAMA’s electricity page still presents this grid as the tariff table in force; no later published tariff grid was identified, and ARELEC’s website could not be reached. Excludes the fixed charge per kW reserved (3,371 Ar in zone 1) and the monthly meter charge (7,641 Ar). The grid does not state how VAT applies.
- Household price (EUR)
- 0.074 EUR/kWh (2026)Source 9Converted from 370 Ar/kWh at the Banky Foiben’i Madagasikara MID rate of 4,977.63 Ar per euro on 9 October 2026.
- Typical annual electricity bill
- Not identified from a reliable public source.
Regulated electricity prices are set by the regulator. Under the 2017 Electricity Code ARELEC fixes and publishes regulated prices and network transit charges and monitors how they are applied. The grid published by JIRAMA dates from a regulator notice of 29 December 2017, applied from January 2018 as part of a recovery plan for the utility.
Zones and structure
Low-voltage tariffs vary by tariff zone (1, 1 bis, 2 and 3), with the highest prices in zone 3. Each residential bill combines an energy price per kWh by consumption band, a fixed charge per kW of reserved capacity and a monthly meter charge. Low-consumption households under 3 kW can use the Eco tariff, which charges very little for the first 25 kWh but much more above that.
Changing tariff
JIRAMA’s FAQ says that switching tariff is free, while increasing the amperage of a connection costs 6,600 Ar. For tariff 18, the customer applies in writing at a JIRAMA office and signs a new supply request card (Carte de Demande de Fourniture).
Reliability
JIRAMA publishes weekly notices of planned power cuts for the Antananarivo interconnected network (RIA) and regional networks. These notices continued throughout 2025 and 2026.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | BT Général Résidentiel (low-voltage general residential): energy price for consumption up to 130 kWh of 370 Ar/kWh in zone 1, 391 Ar in zone 1 bis, 413 Ar in zone 2 and 550 Ar in zone 3; above 130 kWh 370, 460, 548 and 737 Ar/kWh. A fixed charge per kW reserved (3,371 Ar in zone 1 down to 1,586 Ar in zone 3) and a monthly meter charge of 7,641 Ar are added. |
| Other | Yes | BT Eco Résidentiel, for residential connections below 3 kW: 141 Ar/kWh for the first 25 kWh in every zone, then 764 Ar/kWh (zone 1) to 909 Ar/kWh (zone 3), with a monthly meter charge of 922 Ar and no fixed charge per kW. JIRAMA’s customer portal refers to its tariff 14 as one that pays no fixed charge. |
| Other | Limited | Tariff 18, an intermediate domestic tariff created in April 2018 for zone 1 customers with less than 5 kW subscribed: 236 Ar/kWh for the first 70 kWh and 500 Ar/kWh above, plus a fixed charge of 3,371 Ar per kW reserved and a meter charge of 7,641 Ar. It applies only in the listed zone 1 centres (Antananarivo agencies, Toamasina, Antsirabe, Fianarantsoa and others) and is applied for on request. |
| Prepayment | Limited | JIRAMA has prepaid and postpaid customers. Prepaid credit can be bought through its mobile app and online customer area, which issue token codes for the meter. No national share of prepaid customers was published. |
| Time-of-use | Limited | Time-of-day tariffs (peak, day and night prices) exist for high- and medium-voltage customers only. In 2022 JIRAMA introduced an OPTIMA BUSINESS tariff for business customers, whose day rate it quotes at 431 Ar/kWh excluding tax. No time-of-use tariff for households was identified. |
Household prices compared with neighbouring countries (EUR per kWh).
- Réunion€0.192
- Seychelles€0.165
- Mozambique€0.118
- Mauritius€0.113
- Tanzania€0.099
- Madagascar€0.074
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 67 kWh/person/yr (2023)Source 8Derived: 2,087 GWh total generation (IRENA, 2023) divided by the World Bank 2023 population of 31,195,932. This covers all sectors and gross generation, not residential use.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity use in Madagascar is very low because most people are not connected. The 2018 census found that only 38.1% of dwellings had electricity (71.5% in towns and 29.2% in the countryside), and that kerosene lamps were the main lighting source for half of the population. The census counted solar systems and generators as well as JIRAMA supply.
The World Bank access figures show progress since then, from 35.1% of the population in 2021 to 42.5% in 2024. Rural access rose from 14.6% in 2023 to 26.5% in 2024.
JIRAMA reported close to 570,000 electricity customers in 114 localities (2019 data). This compares with over six million households, so most homes are supplied by mini-grids, solar kits or not at all.
Housing and households.
- Dwellings
- 6,108,370 dwellings (2018)Source 7
- Owner-occupied
- 79.3% (2018)Source 6Share of households owning their dwelling: 50.4% in urban areas and 86.9% in rural areas.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 82.9% (2018)Source 7Individual houses or villas. A further 5.5% are concessions (groups of buildings in one compound).
- Apartments and flats
- 11.6% (2018)Source 7Apartments, collective houses and buildings; 26.8% of urban dwellings.
- Urban population
- 32.4% (2024)Source 3World Bank (UN) estimate. Under the national definition used in the 2018 census, 4.94 million of 25.67 million people (19.3%) lived in urban areas.
Most Malagasy homes are individual houses, and most households own them, particularly in the countryside. The census found that most dwellings are built with non-durable materials: over 70% for floors and walls and 56% for roofs.
Only 1.28 million of the 6.1 million dwellings counted in 2018 were in urban areas. The spread of rural settlements explains why grid extension is costly and why the state relies on mini-grids and stand-alone solar for rural electrification.
How the grid works in Madagascar.
- TransmissionJIRAMA
- DistributionJIRAMA in towns; private mini-grid operators under authorisations or concessions in rural areas
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Madagascar’s grid is fragmented. JIRAMA runs several regional interconnected networks, the largest being the RIA around Antananarivo, and isolated grids in smaller towns. JIRAMA’s generating plants include the Andekaleka hydropower station as well as other hydro, solar and thermal power stations. There is no link with other countries.
Commercially, the sector is close to a single-buyer model. Independent producers sell output to JIRAMA under contracts, and JIRAMA resells it to end customers at regulated prices. The 2017 Code gives a national transmission manager the role of central buyer, and allows supply licences and green supply licences in principle, but there is no competitive retail market for households.
Rural electrification
Outside JIRAMA’s networks, ADER runs rural electrification through private operators, who build and operate mini-grids (often hydro or solar-hybrid) under authorisations or concessions. The World Bank’s Digital and Energy Connectivity for Inclusion project (USD 400 million, approved in March 2023 and due to close in March 2028) funds hybridisation and digitisation of isolated grids, private renewable mini-grids and off-grid solar.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministère de l’Énergie et des Hydrocarbures (MEH) | Sets energy policy, awards concessions and authorisations (or delegates this to ADER) and receives self-production declarations. Fixes technical standards for installations with the national standards committee. |
| Regulator | Autorité de Régulation de l’Électricité (ARELEC) | Independent administrative authority created by the 2017 Electricity Code, replacing ORE. Sets regulated prices and transit charges, oversees concessions, authorisations, declarations and supply licences, coordinates the grid code and provides mediation. |
| TSO | JIRAMA | State-owned company that operates the main generation, transmission and distribution networks, including the interconnected network around Antananarivo (RIA), and buys power from independent producers. |
| DSO | JIRAMA | Distributes and sells electricity in towns, with close to 570,000 electricity customers in 114 localities (2019 data). |
| DSO | Private mini-grid operators | Private companies running rural networks under authorisations (peak up to 5 MW) or concessions (above 5 MW), awarded through ADER. |
| Ministry | Agence de Développement de l’Électrification Rurale (ADER) | State agency for rural electrification. Plans rural projects, runs calls for projects and can award authorisations and concessions on the ministry’s behalf. |
Compared with the UK system.
| UK concept | Madagascar equivalent | How it works |
|---|---|---|
| DNO | JIRAMA (towns) and mini-grid operators (rural) | There is no separate regional network company. JIRAMA owns and runs the urban networks; in rural areas private operators hold authorisations or concessions to run their own local networks. |
| National Grid/NESO | JIRAMA | There is no single national grid. JIRAMA runs several separate interconnected networks, the largest around Antananarivo, plus isolated town grids. The Code provides for a national transmission manager (GNT) acting as central buyer. |
| MPAN | Référence client and meter number | JIRAMA identifies each installation by a customer reference shown on bills and in its online customer area, alongside the meter number. There is no national supply-point register independent of JIRAMA. |
| MPRN | Not applicable | There is no piped gas network for households. |
| Meter operator | JIRAMA | JIRAMA installs, reads, calibrates and replaces meters. Calibration of a meter is charged to the customer, and customers can submit their own meter readings. |
| Supplier | JIRAMA or the local mini-grid operator | Households cannot choose their supplier. The Code created supply licences, but holders of distribution authorisations and concessions supply their own customers. |
| Smart-meter infrastructure | JIRAMA communicating meters | JIRAMA deploys communicating meters for MV, three-phase and single-phase LV connections, which send readings to concentrators over a mobile operator’s network and support prepayment. There is no national data hub. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Référence client |
| Who issues it? | JIRAMA (or the local mini-grid operator) |
| Format | Customer/installation reference assigned by JIRAMA, used with the separate meter number (N° compteur). The structure of the reference is not published. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On JIRAMA bills (reference client) and the subscriber booklet (livret d’abonné), and under “My installations” in the JIRAMA online customer area and app. |
| Electronic access | Customers can create an account in JIRAMA’s online agency (espaceclient.jirama.mg) or the Jiramobile app to view their installations, bills and consumption, submit meter readings, buy prepaid credit and pay bills by mobile money. |
| Third-party access | No third-party or data-sharing access to customer consumption data was identified. |
| Who keeps the register | JIRAMA’s commercial customer system. Mini-grid operators keep their own customer records. |
| Register scope | Per DSO |
Madagascar has no standardised national supply-point identifier. A JIRAMA connection is identified by the customer reference (référence client) of the installation and by the meter number. The online customer area shows each installation with its reference, site, address, meter number, tariff, meter type and whether the meter is prepaid, postpaid or smart.
A new connection starts with a written request to the local JIRAMA branch, endorsed by the fokontany (neighbourhood authority), with ID cards and residence certificates for the applicant and spouse, a location map, the reference number on the nearest neighbour’s bill, the building permit and the municipal connection authorisation. Any change to a subscription, such as a new tariff, is recorded on a supply request card (Carte de Demande de Fourniture) signed by both the customer and JIRAMA.
Prepaid customers buy credit as token codes, through JIRAMA offices, the online customer area or the Jiramobile app. Postpaid customers receive bills based on meter readings or, when the meter cannot be read, estimated consumption, and can submit their own readings by phone or app.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Limited |
| Net billing | Limited |
| How exported electricity is paid | Net offsetting allowed in law for renewable self-producers with a bidirectional meter; surplus sales capped at 40% of annual output at regulated or negotiated prices. JIRAMA offered 431 Ar/kWh excluding tax to businesses in 2022. |
| Can a household offset its production against consumption? | Article 13 of the Code gives a renewable self-producer the right to offset electricity produced, provided a bidirectional meter separately measures import and export, under terms set by ARELEC. The self-producer pays for the meter. No ARELEC implementing rules were identified. |
| How much surplus can be sold? | Surplus renewable output may be sold to the network the self-producer is connected to, but no more than 40% of annual production, and at least 60% must be consumed by the producer (articles 14 and 46). |
| What price is paid for exports? | Buy-back terms and tariffs are to be set by regulation after ARELEC’s opinion; otherwise prices are negotiated with the network operator (article 47). In September 2022 JIRAMA invited companies and industries with renewable surplus to sell it at 431 Ar/kWh excluding tax, the day rate of its OPTIMA BUSINESS tariff. |
| Do grid-connected renewables get priority? | Yes. Network operators must give priority to connection requests and least-cost injection from renewable installations, within technical and supply-security limits (article 13). |
Connecting a home system.
- For solar PV under 10 kW, fill in the simplified declaration form (Annex 1 of Order 26766/2022-MEH); the equipment seller must have the customer complete it, including whether the system is grid-connected.
- For solar PV of 10–150 kW, file a production declaration with the energy ministry; self-production up to 500 kW (solar, hydro, thermal) is under declaration, larger plants need an authorisation.
- Attach a site plan, a technical note and a wiring diagram to the declaration or authorisation request.
- Obtain a certificate of conformity from the energy ministry before commissioning.
- For offsetting or surplus sales, agree connection and metering with JIRAMA or the mini-grid operator; the self-producer pays for the bidirectional meter.
The legal framework for small-scale generation is set by the 2017 Electricity Code and Order 26766/2022-MEH on self-production declarations and authorisations. It is permissive on paper: small solar systems need only a declaration, and the Code recognises both offsetting and surplus sales.
In practice, no published household feed-in or net-metering tariff was identified. The only published buy-back offer is JIRAMA’s 2022 offer to companies and industries. Households installing solar mostly use it for self-consumption or off-grid supply.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (solar PV) | Declaration to the energy ministry up to 150 kW (simplified form under 10 kW); authorisation from 150 kW to 5 MW; concession above 5 MW | Ministry of Energy and Hydrocarbons (or ADER by delegation) | Thresholds in articles 19, 23 and 28 of Law 2017-020. Declarations must include an environmental impact study. |
| Generate electricity (hydro, wind, thermal) | Hydro: declaration up to 500 kW, authorisation to 5 MW, concession above. Wind: declaration up to 250 kW, authorisation to 5 MW. Thermal: authorisation up to 500 kW, concession above | Ministry of Energy and Hydrocarbons (or ADER) | Biomass, waste and solar thermal: authorisation up to 5 MW; geothermal and marine up to 10 MW. |
| Self-production (own use) | Declaration up to 500 kW (thermal, hydro, solar) or 1 MW (biomass, geothermal, wind, waste); authorisation by ministerial decision above | Ministry of Energy and Hydrocarbons | A certificate of conformity from the ministry is required before commissioning (Order 26766/2022-MEH). |
| Store electricity | No specific storage licence; battery owners must ensure recycling or proper treatment of waste | Ministry of Energy and Hydrocarbons | Article 56 of the Code. Batteries in small solar systems are listed in the simplified declaration form. |
| Export / sell surplus to the grid | Allowed for renewable self-producers up to 40% of annual output; contract with the network operator | ARELEC (terms); JIRAMA or mini-grid operator (contract) | Prices regulated or negotiated (articles 14, 46 and 47). |
| Supply electricity to end customers | Supply licence from ARELEC, unless the supplier holds a distribution or transmission concession or authorisation | ARELEC | Applicants must prove technical and financial capacity. Green supply licences are possible for 100% renewable suppliers. |
| Distribute electricity | Authorisation for networks with peak demand up to 5 MW; concession above 5 MW | Ministry of Energy and Hydrocarbons (or ADER) | Private lines entirely on private property are free to build. |
| Transmit electricity | Concession in all cases | Ministry of Energy and Hydrocarbons | The national transmission manager acts as central buyer. |
| Aggregate, trade, balancing, VPP, remote control of assets | No licence category exists; there is no wholesale market, balancing market or aggregator role | Not applicable | Ancillary services are to be defined in the grid code, which is administered by ARELEC. |
Madagascar uses three legal regimes for generation and networks: concession, authorisation and declaration, depending on technology and capacity. Concessions and authorisations are signed by the energy minister, or by ADER where powers are delegated, after a tender or a spontaneous application. Decree 2023-245 sets out the procedures for concessions and authorisations.
Small renewable systems need only a declaration. For solar PV below 10 kW, buyers and users fill in a simplified form, and sellers of equipment are legally required to have their customers complete it.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services (voltage/frequency, reserves, black start) | No | — | No | JIRAMA. The Code requires the grid code to define ancillary services such as voltage and frequency control, fast and cold reserve and black start. These are provided by JIRAMA and contracted producers; no open market exists. |
| Wholesale energy | No | — | No | Power is bought by JIRAMA under bilateral contracts with independent producers. There is no exchange. |
There is no flexibility, balancing or capacity market, and distributed assets cannot be aggregated. Supply shortages are handled by planned load shedding, which JIRAMA announces weekly.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | JIRAMA is deploying communicating meters with prepayment; coverage not published |
| Reading interval | Not published |
| Meter types | Communicating meters for MV, LV three-phase and LV single-phase connections |
| Communication | Data sent to JIRAMA through a mobile operator SIM, via concentrators or individual collectors |
| Functions | Remote reading, tamper detection, prepayment, multi-rate |
| Customer types | Prepaid and postpaid |
JIRAMA says it is installing communicating meters, including a ZTE smart meter model, which support centralised reading, detection of meter bypass, prepayment and multiple tariffs. Readings (index, kW) are sent by a mobile operator SIM to concentrators.
Separately, JIRAMA lets customers submit their own meter readings and buy prepaid credit through its app. The 2017 Code requires the grid code to include a metering code covering data from distribution operators and meter calibration.
Renewable electricity.
Electricity generation mix (2023).
- Hydro: 49%
- Fossil fuels: 47%
- Solar: 5%
- Renewable electricity share
- 53% (2023)Source 8Share of electricity generation: 1,116 GWh renewable (hydro 1,018 GWh, solar 96 GWh, bioenergy 1 GWh) out of 2,087 GWh. Madagascar does not import electricity.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0 MW (2024)Source 8IRENA records no net change in solar capacity in 2024.
- Hydropower
- 193 MW (2024)Source 8
- Solar PV
- 58 MW (2024)Source 8
- Wind
- 0 MW (2024)Source 8
- Non-renewable (thermal)
- 624 MW (2024)Source 8
Targets.
- Access to modern energy (electricity and lighting) for 70% of households by 2030, under the New Energy Policy (NPE) adopted in 2015.
Hydropower is the backbone of renewable generation, producing about half of all electricity in 2023. Solar PV contributes a small but growing share. Renewables made up 29% of installed capacity in 2024, but 53% of generation, because hydro plants run much more than the thermal fleet.
The rest of the system relies on fossil-fuelled thermal plants, which made up 624 MW of capacity in 2024. The 2017 Code gives renewables priority for connection and dispatch, and requires the energy ministry to publish an annual energy-mix report.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No official statistics on battery storage were identified. The simplified declaration form for small solar systems asks for battery details. The Code makes owners of battery systems responsible for recycling or proper disposal.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| JIRAMA | Near-monopoly on public grids; ~570,000 electricity customers (2019) | No | Limited | No | Limited |
JIRAMA supplies electricity on its networks, while rural mini-grid operators supply customers in their own areas. Households cannot switch supplier.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministère de l’Énergie et des Hydrocarbures | Government | Energy ministry | Sets policy, awards concessions and authorisations and receives self-production declarations. |
| Autorité de Régulation de l’Électricité (ARELEC) | Regulator | Electricity regulator | Sets regulated tariffs, supply licences and grid code; terms for net offsetting. |
| JIRAMA | Transmission | State utility | Operates the main grids, buys from producers and supplies most grid customers. |
| ADER | Distribution | Rural electrification agency | Runs rural electrification and mini-grid calls for projects; publishes the sector legislation. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Transmission and distribution network codes (Order 20027-2022) | Ministry of Energy and Hydrocarbons / ARELEC | The order brought the network codes into force. Under the 2017 Code the grid code includes connection, operation, metering and network-conduct codes. |
| Self-production | Order 26766/2022-MEH | Ministry of Energy and Hydrocarbons | Declaration and authorisation forms; certificate of conformity before commissioning. |
| Equipment standards | Standards set by the energy ministry with the National Standards Committee | Comité National de Normalisation | No specific national inverter or anti-islanding standard was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Self-production declaration | Yes | National | Simplified form for PV under 10 kW; declaration for larger self-production up to 500 kW (solar). |
| Certificate of conformity | Yes | National | Issued by the energy ministry before commissioning. |
| Environmental impact study | Limited | National | Required for every production declaration under article 28 of the Code; how this applies to small rooftop systems was not confirmed. |
| Network operator agreement | Limited | Local | Needed only for grid-connected systems that offset or export; connection terms are negotiated with JIRAMA or the mini-grid operator. |
Permissions are national and handled by the energy ministry. The simplified declaration was designed so that equipment sellers handle paperwork for small solar systems.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Digital and Energy Connectivity for Inclusion (DECIM) | Active | Donor-funded programme | World Bank project (USD 400 million) funding hybridisation and digitisation of isolated grids, private renewable mini-grids, affordable off-grid solar for underserved communities and energy sector reform. | Mar 2023 – Mar 2028 |
| JIRAMA surplus purchase offer | Active | Export payment | Offer to buy renewable surplus from companies and industries at 431 Ar/kWh excluding tax, subject to technical criteria and a connection contract. Published in September 2022; no withdrawal was identified. | — |
Data and connectivity.
- Fixed broadband
- 18.7 % of population using the internet (2024)Source 4
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
JIRAMA’s communicating meters send data over a mobile operator’s network. Mobile money is widely used to pay JIRAMA bills and buy prepaid credit. The 2018 census found that only 3.7% of people lived in dwellings with internet access.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 2.087 TWh (2023)Source 8Total generation; with no imports this is equivalent to supply.
- Generation capacity
- 0.875 GW (2024)Source 8
- Interconnection
- 0 GWIsland system with no cross-border links.
- Curtailment
- Not identified from a reliable public source.
JIRAMA publishes weekly forecasts of planned cuts for the Antananarivo network and regional centres.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Electricity Code (Law 2017-020) | Current | 10 April 2018 | Replaced the 1999 law; created ARELEC, the declaration regime, supply licences and rules on renewable offsetting and surplus sales. |
| Self-production order (26766/2022-MEH) | Current | 10 October 2022 | Forms and procedure for self-production declarations and authorisations, including the simplified form for PV under 10 kW. |
| Decree 2026-1157 on the National Electricity Fund | Current | 2026 | Implements Law 2017-021 reforming the National Electricity Fund, which finances rural electrification. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential solar statistics; 58 MW of solar in total (IRENA 2024); no published household export tariff. |
| Distributed energy market | Medium | Law allows declaration-based self-production and mini-grids, and rural access rose from 14.6% to 26.5% in 2023–24 (World Bank). |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; no aggregator role. |
| Energy storage adoption | Low | No official storage statistics identified. |
| Renewable growth environment | Low | IRENA records no net capacity additions in 2024; renewable share of generation 53% in 2023. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 18 sources
- Population, total — Madagascar (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
- Access to electricity (% of population) — Madagascar (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 10 October 2026.
- Urban population (% of total) — Madagascar (SP.URB.TOTL.IN.ZS). World Bank, 2024. accessed 10 October 2026.
- Individuals using the Internet (% of population) — Madagascar (IT.NET.USER.ZS). World Bank, 2024. accessed 10 October 2026.
- Digital and Energy Connectivity for Inclusion in Madagascar Project (P178701). World Bank, 2023. accessed 10 October 2026.
- RGPH-3 thematic report: Caractéristiques des ménages et structure familiale à Madagascar. INSTAT Madagascar, 2021. accessed 10 October 2026.
- RGPH-3 thematic report: Habitation et cadre de vie de la population. INSTAT Madagascar, 2021. accessed 10 October 2026.
- Energy Profile: Madagascar. IRENA, 2025. accessed 10 October 2026.
- Cours des devises (MID rates, 9 October 2026). Banky Foiben’i Madagasikara, 2026. accessed 10 October 2026.
- Tarifs électricité (ORE/NP02/2017 grid from January 2018; JIRAMA note on tariff 18, May 2018). JIRAMA / Office de Régulation de l’Électricité, 2018. accessed 10 October 2026.
- Électricité (smart meters and tariffs page). JIRAMA. accessed 10 October 2026.
- La JIRAMA. JIRAMA. accessed 10 October 2026.
- Questions réponses. JIRAMA. accessed 10 October 2026.
- Proposition d’achat d’excédent de production d’électricité (OPTIMA BUSINESS). JIRAMA, 2022. accessed 10 October 2026.
- La JIRAMOBILE. JIRAMA, 2022. accessed 10 October 2026.
- Loi n° 2017-020 portant Code de l’Électricité à Madagascar. Republic of Madagascar (via ADER), 2018. accessed 10 October 2026.
- Arrêté n° 26766/2022-MEH relatif aux demandes des déclarations et autorisations d’autoproduction. Ministère de l’Énergie et des Hydrocarbures (via ADER), 2022. accessed 10 October 2026.
- Législation. ADER. accessed 10 October 2026.
Questions about energy in Madagascar.
On JIRAMA’s general residential tariff in zone 1 the energy price is 370 Ar/kWh, rising to 550–737 Ar/kWh in zone 3, plus a fixed charge per kW reserved and a monthly meter charge of 7,641 Ar. Small households under 3 kW can use the Eco tariff at 141 Ar/kWh for the first 25 kWh. These prices come from the grid applied since January 2018, which JIRAMA still presents as in force.
The state-owned utility JIRAMA supplies almost all grid customers. In rural areas private operators run mini-grids under authorisations awarded through the rural electrification agency ADER. Households cannot choose their supplier.
The Electricity Code allows renewable self-producers to offset their output using a bidirectional meter and to sell surplus to the network, up to 40% of annual production. Detailed terms are set by the regulator ARELEC or negotiated with the network operator. JIRAMA’s only published offer, from 2022, is aimed at companies and industries at 431 Ar/kWh excluding tax.
Yes, but it is simple for small systems. Solar PV under 10 kW needs a simplified declaration form, which the seller must have you complete. Larger self-production up to 500 kW is declared to the energy ministry, and a certificate of conformity is needed before commissioning.
There is no national supply-point number. JIRAMA identifies each installation by a customer reference (référence client) shown on bills and in its online customer area, together with the meter number.
The World Bank estimates 42.5% of the population had access in 2024: 75.9% in urban areas and 26.5% in rural areas.