How electricity works in Mozambique.

Mozambique electricity market 2026: EDM tariffs and Credelec prepayment, ARENE regulation, Cahora Bassa hydro, surplus-sale rules under Decree 31/2026 and licensing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Mozambican metical (MZN) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Mozambique energy at a glance.

Key figures for households in Mozambique. Each one links to its source on the full overview below.

  • Electricity price.

    8.44 MZN per kWh for households, including taxes. Figures for 2025.

  • Renewable share.

    84% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Mozambique.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Mozambique below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Mozambique requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Mozambique.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Mozambique, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Mozambique, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Mozambique.

Full overview

The energy market in Mozambique, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Mozambique’s grid electricity is supplied by Electricidade de Moçambique, E.P. (EDM), the state-owned utility that generates, transmits, distributes and sells power across the national grid (Rede Eléctrica Nacional, REN). According to the regulator ARENE, the market has formally been opened to other companies, but in practice private participation has materialised only in generation: Hidroeléctrica de Cahora Bassa (HCB) and a group of independent power producers (gas, solar, biomass and others) sell power alongside EDM’s own plants, while MOTRACO, owned in equal thirds by EDM, Eswatini Electricity Company and Eskom, carries power to the Mozal aluminium smelter near Maputo.

Generation is dominated by hydropower. IRENA reports that hydro produced 16,361 GWh of the 19,706 GWh generated in 2023 (83%), almost all of it from the 2,075 MW Cahora Bassa scheme on the Zambezi, much of whose output is exported to South Africa under a long-term contract. Gas-fired plants in the south make up most of the remainder, and grid-connected solar is still small.

The sector is governed by the Electricity Law (Law 12/2022 of 11 July 2022) and, since July 2026, by its implementing regulation, Decree 31/2026. The decree covers concessions for generation, storage, transmission, distribution, sales, imports and exports. It also sets out, for the first time, detailed rules under which a grid-connected installation built for its owner’s own use may sell surplus electricity. Off-grid mini-grids up to 10 MW and solar home-system providers fall under a separate regime (Decree 93/2021), overseen by ARENE and the energy fund FUNAE.

Access is expanding quickly from a low base. The Government reports that the national access rate (grid and off-grid) rose from 31% in 2018 to 60.1% in 2024, and it targets universal access by 2030. The World Bank’s household-survey-based indicator puts access to electricity at 36.9% of the population in 2024.

Energy snapshot.

Headline figures for electricity in Mozambique. Each shows its data year and links to its source.

  • Population35,631,653 peopleSource 122025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (MZN)8.44 MZN/kWhSource 12025
  • Household price (EUR)0.118 EUR/kWhSource 162025
  • Renewable electricity share84 % of generationSource 112023
  • Solar capacity0.107 GWSource 112024
  • Wind capacity0 GWSource 112024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Autoridade Reguladora de Energia (ARENE)
System operator
Electricidade de Moçambique (EDM), acting as interim Gestor do Sistema Eléctrico Nacional
Distribution networks
EDM is the single national grid distributor and retailer; off-grid mini-grids (mostly FUNAE) and registered solar-home-system providers serve areas beyond the grid.
Currency
Mozambican metical (MZN)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Mozambique.

Household price (MZN)
8.44 MZN/kWh (2025)Source 1EDM domestic prepaid (Credelec) energy price, January–June 2025, as published by ARENE. Postpaid domestic tariffs are block-based (6.63, 9.39 and 9.85 MZN/kWh) and the social tariff is 1.07 MZN/kWh. ARENE’s bulletin does not state whether taxes are included, and no later tariff change was identified up to October 2026.
Household price (EUR)
0.118 EUR/kWh (2025)Source 16Derived: 8.44 MZN/kWh ÷ 71.70 MZN per EUR (Banco de Moçambique average reference rate, 9 October 2026).
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (MZN per kWh).Source 1

8.448.948.442024-Q22025-Q1
Mozambique household electricity price, MZN per kWh
2024-Q28.44 MZN/kWh
2025-Q18.44 MZN/kWh

Grid electricity prices are regulated. Under the tariff-system regulation (Decree 80/2022 of 30 December 2022), EDM proposes a revenue requirement and tariff structure, and ARENE reviews it. Transmission and distribution revenues are meant to be reviewed annually and generation costs quarterly. Customers are grouped by purpose (social, domestic, agricultural, general/commercial) and by supply voltage: large low-voltage consumers above 19.8 kVA, medium voltage from 1 kV to 66 kV, and high voltage above 66 kV.

The tariffs ARENE published for 2024 and 2025 were unchanged. Mozambique’s National Energy Compact (September 2025) states that tariffs were last revised in 2018–2019. It also states that the cost-reflective methodology approved in 2022, which passes inflation and exchange-rate changes through to tariffs, had not yet been applied. The compact commits to applying it with periodic adjustments, so tariff increases are a realistic prospect.

How Mozambique compares

Converted at the October 2026 reference rate, the prepaid domestic price of 8.44 MZN/kWh is about €0.12/kWh. That is low by international standards, but high relative to incomes in a country where most of the population is rural. Commercial (“general”) customers pay considerably more: 10.30 to 16.10 MZN/kWh, or 14.75 MZN/kWh prepaid. Agricultural customers pay less.

Tariff types.

Tariff types.
TariffAvailableDetail
PrepaymentYesCredelec prepaid domestic tariff: 8.44 MZN/kWh (ARENE, January–June 2025). Customers buy tokens through EDM outlets and mobile money, for example M-Pesa (*150#, option 5 “Comprar CREDELEC”). The National Energy Compact reports 3,613,779 prepayment meters.
RegulatedYesPostpaid domestic tariff in monthly consumption blocks: 6.63 MZN/kWh for 0–300 kWh, 9.39 MZN/kWh for 301–500 kWh and 9.85 MZN/kWh above 500 kWh.
OtherLimitedSocial tariff: 1.07 MZN/kWh. Under Decree 80/2022 it is limited to homes with a contracted power of 1.1 kVA that use no more than 125 kWh a month.
Time-of-useLimitedDecree 80/2022 allows energy prices to vary by time of day, week or season (time-of-use), and medium- and high-voltage customers pay demand charges. No time-of-use offer for households was identified.
DynamicNoNo dynamic or wholesale-indexed retail tariffs exist.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Electricity demand in Mozambique is dominated by heavy industry. ARENE reports that in Q1 2025 the aluminium smelting industry (Mozal) accounted for about 55% of final electricity consumption and the residential sector for about 7%. Final consumption in that quarter was 3,330,265.5 MWh, 10% more than a year earlier.

Household use is low and growing through new connections rather than higher use per home. In 2024 there were 412,363 new on-grid connections, 395,622 of them households, according to the National Energy Compact. Most homes still cook with firewood and charcoal; the Government aims to raise access to clean cooking from 17% to 54% by 2030.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
37.2 % of population (2025)Source 14

Mozambique is predominantly rural: the World Bank estimates the urban share of the population at 37.2% in 2025. Grid access is concentrated in towns and along the transmission corridors, while rural homes rely increasingly on solar home systems and mini-grids. The compact counts 175,235 solar home systems and 3,936 mini-grid connections added in 2024.

Reliable national figures on dwelling types and tenure could not be verified for this profile, because the national statistics office (INE) website was not accessible. For a household, the practical question is usually whether the grid reaches the plot and whether the homeowner can afford the connection.

How the grid works in Mozambique.

  1. TransmissionElectricidade de Moçambique, E.P. (EDM), EDM, HCB and MOTRACO
  2. DistributionEDM is the single national grid distributor and retailer; off-grid mini-grids (mostly FUNAE) and registered solar-home-system providers serve areas beyond the grid.
  3. MeteringElectricidade de Moçambique (EDM), Cadastro Energético (MIREME)
  4. Supply1 or more retail suppliers

Physically, Mozambique’s grid is three loosely linked regional systems. Generation is concentrated in the north-west (Cahora Bassa and other Zambezi hydro) and demand in the south around Maputo. According to the National Energy Compact, the country has only 5,679 km of high-voltage lines, of which just 367 km are at 400 kV. Power often has to pass through South Africa to move between Mozambican regions. A 2,000 km, 400 kV domestic backbone is planned for completion by 2030.

Commercially, EDM is the single buyer and seller on the national grid. It buys power from HCB and from IPPs such as Central Térmica de Ressano Garcia, Kuvaninga, Gigawatt and the Mocuba and Mecúfi solar plants, under contracts approved through the concession process. It also runs its own plants and imports and exports through the Southern African Power Pool (SAPP). In Q1 2025, 76% of exports went to South Africa, 8% to Zambia and 8% to Zimbabwe. About 5% was sold on the SAPP competitive day-ahead market.

The 2022 Electricity Law requires public tenders for concessions, and Decree 31/2026 sets the procedure. The Minister grants concessions below 100 MW, and the Council of Ministers approves projects of 100 MW and above.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistério dos Recursos Minerais e Energia (MIREME)Sets energy policy, grants concessions below 100 MW (the Council of Ministers approves projects of 100 MW and above), issues licences for electrical installations and keeps the Cadastro Energético (energy register).
RegulatorAutoridade Reguladora de Energia (ARENE)Created by Law 11/2017. Supervises, regulates and sanctions electricity, natural-gas and liquid-fuel activities; reviews tariffs; approves surplus-sale terms; registers off-grid energy-service providers; and publishes quarterly market statistics.
System operatorElectricidade de Moçambique, E.P. (EDM)Under Article 3 of Decree 31/2026, EDM carries out the functions of the Gestor do Sistema Eléctrico Nacional (system and market operator, working through the national dispatch centre) until that body’s statute is approved.
TSOEDM, HCB and MOTRACOEDM owns most of the national transmission network (6,476 km of transmission lines and 92 substations at the end of 2023). HCB operates the Cahora Bassa HVDC link to South Africa, and MOTRACO wheels power through Eswatini and Mozambique to the Mozal smelter.
DSOElectricidade de Moçambique (EDM)Sole distributor on the national grid: 55,935 km of distribution lines and 17,175 transformers at 31 December 2023.
SupplierElectricidade de Moçambique (EDM)Retails to all grid customers at ARENE-regulated tariffs, mostly through Credelec prepayment.
MeteringElectricidade de Moçambique (EDM)Under Decree 31/2026, meters remain the property of the distribution concessionaire and must be of types approved by the competent authority.
Data hub / registryCadastro Energético (MIREME)Register of concessions, operators, installations and equipment certifications, managed by the ministry and accessible to ARENE and the system manager. It is not a customer meter-point register.

Compared with the UK system.

Compared with the UK system.
UK conceptMozambique equivalentHow it works
DNOEDM (distribution concessionaire)There are no regional network companies. EDM owns and operates the whole national distribution network and is also the retailer. Off-grid mini-grid concessionaires operate isolated local networks.
National Grid/NESOGestor do Sistema Eléctrico Nacional (currently EDM)The 2022 Electricity Law provides for an autonomous system and market manager. Until its statute is approved, EDM carries out its functions through the national dispatch centre. The Government has committed to completing a new national control centre and regional dispatch centres by 2028.
MPANEDM meter number / customer contractThere is no national meter-point numbering scheme. A connection is identified within EDM’s own commercial systems by the supply contract and the meter installed at the delivery point. For prepaid customers, the Credelec meter number is used to buy tokens.
MPRNNo national gas-supply identifier for householdsMost households cook with biomass or bottled LPG. No household gas-meter identifier comparable to an MPRN was identified.
Meter operatorEDMEDM supplies, installs, owns and reads (or sells tokens for) meters. Customers may add their own check meter of an approved type, with EDM’s permission.
SupplierEDM (no retail choice)Households cannot switch supplier. The law allows separate sales (commercialisation) concessions, but none operates in the household market.
Smart-meter infrastructureCredelec prepayment plus targeted smart meteringThere is no DCC-style national data network. The compact reports smart-metering programmes aimed mainly at large customers to reduce commercial losses, with a 2028 milestone.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Número do contador / contrato de fornecimento EDM
Who issues it?Electricidade de Moçambique (EDM)
FormatA meter number assigned by EDM to the meter at the delivery point, linked to the customer’s supply contract (contrato de fornecimento). The exact numbering format is not published in an official source.
LengthNot confirmed from an official source
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the meter or keypad unit, on Credelec purchase receipts and tokens, and on postpaid bills and the supply contract.
Electronic accessPrepaid customers enter the meter number when buying tokens through EDM outlets or mobile money (for example M-Pesa via *150#, option 5 “Comprar CREDELEC”, which also lets the customer retrieve the last token).
Third-party accessNo regime for consumer-authorised third-party data access exists. Decree 31/2026 requires EDM to give the system manager access to metering data.
Who keeps the registerEDM’s commercial and customer systems
Register scopeNational

Mozambique has no national meter-point numbering scheme like the UK MPAN or the European EAN codes. Because EDM is the only grid distributor and retailer, a connection is identified inside EDM’s own systems by the supply contract and the meter installed at the delivery point. Under Decree 31/2026 (Article 77), the connection contract must identify the consumer and the installation, the supply voltage, the contracted capacity and the tariff category. It must also say whether billing is prepaid or postpaid and give details of the metering equipment.

The meter belongs to EDM, not to the occupier. Article 89 of Decree 31/2026 states that meters and their accessories are the concessionaire’s property and that the consumer is their custodian when they are installed inside the premises. The meter, and therefore its number, stays at the property when occupants change. The supply contract is personal and must be taken over by the new occupant.

Most homes use Credelec prepaid meters. The National Energy Compact counts 3,613,779 prepayment meters. The customer buys credit against the meter number and receives a token code to type into the keypad. Postpaid customers receive bills under their contract. If a faulty meter is replaced, ARENE’s commercial rules require any remaining prepaid credit to be transferred in full to the new meter.

There is no independent register and no consumer data-access right equivalent to those in European markets. Higher-level registration happens in the ministry’s Cadastro Energético. It records concessions, licensed installations, operators and certified equipment, but not individual household meters.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringNo
Net billingLimited
How exported electricity is paidNegotiated surplus-sale contract with EDM (as grid manager or distribution concessionaire), on terms approved by ARENE or at tariffs ARENE sets. EDM has no obligation to buy.
Is there a legal right to export?Law 12/2022 (Article 14) allows a grid-connected own-use installation to sign a surplus-sale contract. Decree 31/2026 (Articles 85–88) sets the conditions but states that EDM is not obliged to buy.
Is there a cap on exports?Yes. Surplus sold may not exceed one-third of the energy the installation could produce in a year running continuously at its maximum installed capacity (assuming a 0.9 power factor). Above that, a generation and sales concession is required. Only energy (kWh/MWh) is paid for, not capacity.
Is net metering available?Not yet in practice. Once ARENE sets surplus tariffs, Decree 31/2026 allows a single bill based on two-way flows, netting imports against exports within each billing period. No such tariffs had been identified by October 2026.
Who pays for connection equipment?The producer pays for the protection and isolation equipment. EDM may share costs if it wants to buy the surplus.
Can large own-use plants be required to connect?Yes. Where security of supply requires it, the system manager may require own-use installations of 10 MW or more to interconnect and run synchronised with the national grid.

Connecting a home system.

  1. Obtain an establishment licence and, after inspection, an operating licence for the generating installation from MIREME. Under Decree 60/2021, installations supplied by their own energy within a private property are third-category installations needing prior licensing.
  2. Design the installation to meet the Grid Code (Ministerial Diploma 184/2014), including a load-break protection unit and an isolating switch at the grid connection point.
  3. Submit the electrical project to EDM and pass the interconnection and synchronised-operation tests that EDM (and, where relevant, the system manager) requires.
  4. Install bidirectional metering at the boundary with the grid.
  5. Agree a surplus-sale contract with EDM, with commercial terms approved by ARENE (or apply ARENE tariffs once published), or sell through a licensed aggregator.

Until 2026 Mozambique had no working framework for households or businesses to export rooftop solar power. The 2022 Electricity Law created the principle of surplus sales “under terms to be regulated”. Decree 31/2026, approved on 31 March 2026 and published on 7 July 2026, now supplies those terms. It is a negotiated, capped surplus-sale model rather than a guaranteed feed-in or net-metering scheme. The decree provides for netting on a single bill, but only once ARENE has set surplus tariffs.

Most residential solar in Mozambique is off-grid, in solar home systems and mini-grids, so export is a practical question mainly for larger commercial and industrial self-generators near the grid. For them, licensing and the technical tests needed for parallel operation with EDM’s network matter as much as the price paid for the surplus.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for sale to the gridConcession, normally awarded by public tender. The Minister grants concessions below 100 MW; the Council of Ministers approves 100 MW and above.MIREME / Council of MinistersLaw 12/2022; Decree 31/2026. The ministry must authorise capacity increases that take a plant to 10 MW or more.
Generate for own use (self-generation)No concession, but an establishment licence and an operating licence are needed for the installation. A concession is needed if a third party generates on the user’s behalf.MIREME (installation licences)Law 12/2022, Articles 14–15. Decree 60/2021 classes own-energy installations within a private property as third category, needing a prior licence and inspection.
Export / sell surplus from own-use generationLicensed installation plus a surplus-sale contract. Exports are capped at one-third of potential annual output; above that a concession is required.EDM (contract), ARENE (approves terms/tariffs)Decree 31/2026, Articles 85–88.
Store electricityStorage, standalone or integrated, is a concession activity under the law. Storage concessions for ancillary services or supply have their own tender requirements.MIREMELaw 12/2022, Article 21 (specific storage rules still to be issued); Decree 31/2026.
Supply / retail electricityCommercialisation concession. A retailer must agree a distribution-use-of-system tariff with the distributor.MIREME; tariffs regulated by ARENEDecree 31/2026, Article 74. EDM is the only retailer on the grid in practice.
AggregateAn aggregator selling surplus on behalf of self-generators must be licensed or authorised to buy and sell electricity.Competent authority (MIREME)Decree 31/2026, Article 88(2). No aggregator was identified as operating.
Trade / wholesale, import and exportConcession covering import/export.MIREME / Council of MinistersCross-border trade runs through EDM, HCB and SAPP bilateral contracts and markets.
Balancing and grid servicesProvided by generators and storage under concession and dispatched by the system manager (EDM in the interim).Gestor do Sistema Eléctrico Nacional (EDM)No separate balancing licence or ancillary-services market.
VPP / remote control of assetsNo specific regime. Plants selling surplus may have to make their protection and switching equipment remotely visible and operable from the dispatch centre.EDM / system managerDecree 31/2026, Article 87.
Off-grid mini-grids and solar home systemsMini-grids up to 10 MW need a concession under the off-grid regulation. Category 3 mini-grids (up to 150 kW) are exempt from installation licences. Solar-home-system and other energy-service providers need a five-year ARENE registration.MIREME / ARENEDecree 93/2021. Registration needs a licensed responsible technician, equipment certifications, a price list and a waste-management plan.

Licensing in Mozambique has two layers. The first is the right to carry out a supply activity: generation, storage, transmission, distribution, sale, import or export. These activities need a concession under Law 12/2022 and Decree 31/2026. The second is permission for the physical electrical installation under Decree 60/2021, which sorts installations into five categories. Ordinary homes and shops connected at low voltage (fifth category) need no licence: EDM inspects them within five days of the connection request and connects them within ten days of payment. Installations powered by their own generation (third category) need a prior establishment licence and an inspection before use.

Generating only for your own use is exempt from a concession. As soon as a third party generates for you, or you sell more than the permitted surplus, a concession is required. Electrical installation projects must be signed by a qualified responsible technician (Decree 51/2013).

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
SAPP day-ahead and competitive marketsNo—NoSouthern African Power Pool. Mozambique trades through SAPP; about 5% of Q1 2025 exports went to the competitive regional market (day-ahead). Participation is limited to utilities and large generators, not distributed resources.
Ancillary / system servicesNo—NoEDM (interim system manager). The law allows storage to provide ancillary services under concession, but no market or procurement for distributed flexibility exists.
Surplus sale via aggregatorDeveloping—LimitedEDM / licensed aggregators. Decree 31/2026 allows own-use producers to sell surplus through a licensed aggregator. No operating aggregator has been identified.

Mozambique has no domestic wholesale market and no flexibility or demand-response markets for small consumers or distributed assets. EDM balances the system through its dispatch centre, with Cahora Bassa hydro and imports providing most of the flexibility.

The 2026 regulation introduces aggregators, but only as intermediaries for surplus sales. The Government has committed to setting up an autonomous system and market operator, which would be the first step towards organised markets in which distributed resources could take part.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepayment (Credelec) is the norm; smart metering is targeted at large customers
Reading intervalNot applicable to household prepayment meters
Prepayment meters3,613,779 (National Energy Compact, 2025)
Smart meteringProgrammes under way; smart meters for large customers by 2028 (compact milestone)
Meter ownershipEDM (Decree 31/2026, Article 89)
Meter type approvalMIREME (Decree 60/2021, Article 8)
Self-generators exportingBidirectional meter required

Mozambican households are metered mainly with Credelec prepayment meters. Customers buy credit against their meter number, at EDM agents or with mobile money, and type the token into a keypad. This has helped EDM reduce collection losses. Total system losses fell from 29% to 24%, according to the National Energy Compact.

Smart metering is aimed at reducing commercial losses, starting with large customers, and the compact sets 2028 for this together with GIS mapping of customers. There is no national programme for interval-metered household smart meters or consumer access to consumption data. Decree 31/2026 requires EDM to record energy flows at delivery points hourly, or as agreed with the system manager, and to share metering data with the system manager.

Renewable electricity.

Electricity generation mix (2023).

  • Hydro: 83%
  • Fossil fuels (mainly gas): 16.3%
  • Solar: 0.4%
  • Bioenergy: 0.3%
Source 11
Renewable electricity share
84 % of generation (2023)Source 11Share of domestic generation (16,496 of 19,706 GWh). Mozambique both exports (mainly Cahora Bassa power to South Africa) and imports large volumes (about 90% of imports are for industry, chiefly the Mozal aluminium smelter). In Q1 2025 imports of 2,334,781 MWh exceeded exports of 1,683,431.5 MWh (ARENE), so the renewable share of electricity consumed is likely lower than the generation share. No official consumption-based share was identified.
Home solar
Not identified from a reliable public source.
Solar added each year
4 MW (2024)Source 11IRENA net solar capacity change in 2024 (+4 MW).
Hydro
2.194 GW (2024)Source 11
Solar PV
0.107 GW (2024)Source 11
Bioenergy
0.075 GW (2024)Source 11
Wind
0 GW (2024)Source 11
Fossil fuels
0.684 GW (2024)Source 11

Targets.

  • Renewable share of the energy mix from 78.4% (2024) to 80.6% by 2032 (National Energy Compact).
  • Installed capacity from 2,922 MW (2024) to 6,073 MW by 2032: hydro 4,344 MW, solar 303 MW, wind 245 MW, gas 1,004 MW.
  • 1,500 MW Mphanda Nkuwa hydropower project by 2032; financial close expected by end-2027.
  • Universal electricity access by 2030 (4.9 million new connections, on- and off-grid).

Hydropower dominates Mozambique’s generation, and the Zambezi basin holds most of the country’s estimated 18.6 GW of hydro potential. ARENE’s Q1 2025 bulletin put hydro at 85.9% of electricity produced for the national market, thermal at 13.65% (about 96% of it gas) and solar at 0.45%. On installed capacity, ARENE lists 2,192.3 MW of grid-connected hydro, 662 MW of mostly emergency diesel, 453.6 MW of gas, 120 MW of heavy fuel oil, 74.85 MW of biomass, 36 MW of coal and 80 MW of grid-connected solar (3,623.35 MW in total).

New solar and wind are procured through competitive programmes such as PROLER and GET FiT Mozambique. Grid-connected solar plants include Mocuba (Zambézia), Metoro (Cabo Delgado) and Mecúfi. Rooftop and distributed solar remain mostly off-grid, delivered by solar-home-system companies registered with ARENE and by FUNAE’s 98 mini-grids (11.6 MW, about 11,000 connections).

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

The 2022 Electricity Law recognises energy storage as a distinct activity that can be standalone or combined with generation, providing ancillary services and supporting system balance. Detailed storage rules are to follow in specific regulations. Decree 31/2026 already sets tender requirements for storage concessions. No official register or statistics of grid-connected battery storage were identified. In practice, most batteries are in off-grid solar home systems and mini-grids.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Electricidade de Moçambique (EDM)Sole grid retailerNoLimitedNoLimited

EDM is the only electricity retailer on the national grid. Beyond the grid, FUNAE runs most mini-grids. ARENE has registered a long list of energy-service providers, many of them solar-home-system and pay-as-you-go companies, which sell or lease off-grid systems at ARENE-approved prices.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministério dos Recursos Minerais e Energia (MIREME)GovernmentEnergy ministryGrants concessions, issues installation licences and keeps the energy register.
Autoridade Reguladora de Energia (ARENE)RegulatorEnergy regulatorTariffs, quality-of-service rules, surplus-sale approval and off-grid registration.
Electricidade de Moçambique (EDM)DistributionNational utility and interim system managerOwns the grid, sells to all grid customers and handles connections and metering.
Hidroeléctrica de Cahora Bassa (HCB)Renewable EnergyHydropower generatorOperates the 2,075 MW Cahora Bassa scheme, the backbone of national generation and exports.
MOTRACOTransmissionIndependent transmission companyJointly owned by EDM, Eswatini Electricity Company and Eskom; supplies the Mozal smelter.
Fundo de Energia (FUNAE)Renewable EnergyEnergy fund for off-grid accessBuilds and runs most mini-grids and supports rural electrification.
Southern African Power Pool (SAPP)MarketRegional power poolPlatform for Mozambique’s regional electricity trade.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionCódigo da Rede Eléctrica Nacional (Ministerial Diploma 184/2014)MIREMETechnical conditions for connecting to and operating on the national grid; under revision according to the compact.
Surplus-sale interconnectionDecree 31/2026, Articles 86–87Council of MinistersRequires a load-break protection unit, an isolating switch, interconnection tests and bidirectional metering.
Electrical installationsRegulamento de Licenças para Instalações Eléctricas (Decree 60/2021)Council of Ministers / MIREMEFive installation categories; licensing, inspection and meter-type approval.
Installer accreditationDecree 51/2013 (técnicos responsáveis)Council of Ministers / MIREMEResponsible technicians must sign electrical installation projects; the licence is also required for off-grid service-provider registration.
Off-grid systemsResolução Normativa 3/ARENE/2022 (technical and safety norms)ARENETechnical and safety standards for mini-grids and stand-alone systems; defines nominal LV as 230 V single-phase / 400 V three-phase at 50 Hz.
Quality of serviceResolução Normativa 4/ARENE/2022ARENEQuality of service and commercial relations, including meter replacement and complaints.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Licence for own-use generating installationYesNationalThird-category installation under Decree 60/2021: establishment licence before building and operating licence after inspection, issued by MIREME (provincial authorities handle some installations up to 315 kVA).
Utility approval to operate in parallelYesNationalEDM (and, where relevant, the system manager) must test and approve interconnection before any surplus is exported.
Surplus-sale contractLimitedNationalOnly needed if exporting; terms approved by ARENE.
Building permitLimitedLocalMunicipal construction licensing applies to new buildings. The utility’s power-availability opinion is optional for single-family homes. No specific rooftop-solar planning rule was identified.
Off-grid service-provider registrationYesNationalCompanies supplying solar home systems or other energy services register with ARENE for five years.

For a home on the grid, the main hurdle is the licensing of a self-generating installation and EDM’s approval to run it in parallel with the network. For off-grid households, the provider rather than the household carries the regulatory burden through its ARENE registration.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Social electricity tariffActiveSocial tariff1.07 MZN/kWh for homes with 1.1 kVA contracted power using no more than 125 kWh a month.—
Energia para Todos (Energy for All) programmeActiveAccess programmeGovernment programme launched in 2018 for universal access by 2030, combining grid extension with off-grid solutions. More than 400,000 on-grid and 140,000 off-grid connections were made in 2024.2018 – 2030
Results-based finance for off-grid solar (EnDev, BRILHO)ActiveGrant / results-based financeDonor-backed programmes that supported more than half of the solar home systems sold between 2020 and 2024 (National Energy Compact).—

Data and connectivity.

Fixed broadband
0.14 fixed subscriptions per 100 people (2024)Source 15
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is very limited (0.14 subscriptions per 100 people in 2024). Mobile networks and mobile money carry most electricity transactions: prepaid tokens are bought by USSD and apps such as M-Pesa. This is the main digital channel between EDM and households, rather than smart-meter communications.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
3.623 GW (2025-Q1)Source 13,623.35 MW including off-grid plants and emergency diesel.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Mozambique is interconnected with South Africa, Eswatini and Zimbabwe, and a 218 km, 400 kV line to Malawi is being completed. Links to Zambia and Tanzania are at feasibility stage. Imports, mostly from South Africa for the Mozal smelter, and exports, mostly Cahora Bassa power, are both large. In Q1 2025 imports were 2,334,781 MWh and exports 1,683,431.5 MWh.

The weak internal transmission network is the main constraint. Of the 3,623 MW installed, the compact reports only about 1,292 MW as available to the system in 2024. Most Cahora Bassa output is committed to export under a contract that expires in 2029, and the south relies on gas plants and imports. The 450 MW Temane gas plant and its transmission line, and the planned 400 kV backbone, are meant to ease these constraints.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Decree 31/2026: Electricity Law implementing regulationCurrent2026-07-07Approved 31 March 2026 and in force on publication on 7 July 2026. Replaces Decrees 8/2000 and 42/2005; sets concession procedures, connection rules, surplus sales (capped at one-third of potential annual output), aggregators and metering; confirms EDM as interim system manager.
Surplus-sale tariffs and net billingUpcomingNot scheduledOnce ARENE sets surplus tariffs, single bills netting imports and exports become possible under Decree 31/2026.
Application of the 2022 cost-reflective tariff methodologyUpcomingNot scheduledThe National Energy Compact commits to applying the 2022 methodology with periodic adjustments; tariffs have not been revised since 2018–2019.
Autonomous system and market operatorUpcoming2028 (control centres)Statute of the Gestor do Sistema Eléctrico Nacional pending; national and regional dispatch centres planned for 2028.
Storage regulationUpcomingNot scheduledLaw 12/2022 (Article 21) requires specific rules on energy storage systems.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo grid-connected residential solar statistics; export rules only took effect in July 2026 and no surplus tariffs have been set. Off-grid solar home systems are numerous (175,235 added in 2024).
Distributed energy marketLowDistributed generation is mainly off-grid (98 FUNAE mini-grids of 11.6 MW and solar home systems); grid-connected self-generation lacks a working export regime.
Grid flexibility marketLowNo domestic wholesale, balancing or flexibility markets; EDM is the single buyer and interim system manager.
Energy storage adoptionLowNo official grid storage statistics; storage rules still to be issued under Law 12/2022.
Renewable growth environmentLowRenewables already dominate through hydro (84% of 2023 generation), but solar capacity grew by only 4 MW in 2024 and wind remains at zero; the 2032 target lifts the share only to 80.6%.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 17 sources
  1. Boletim Estatístico do Mercado Energético – Subsector de Electricidade, I Trimestre de 2025. ARENE, 2025. accessed 10 October 2026.
  2. Boletim Estatístico Trimestral do Subsector de Electricidade, II Trimestre de 2024. ARENE, 2024. accessed 10 October 2026.
  3. Electricidade – Legislação. ARENE, 2026. accessed 10 October 2026.
  4. Lei n.º 12/2022, de 11 de Julho – Lei da Electricidade. Boletim da República (via ARENE), 2022. accessed 10 October 2026.
  5. Decreto n.º 31/2026 – Regulamento da Lei da Electricidade (concessões). Boletim da República (via ARENE), 2026. accessed 10 October 2026.
  6. Decreto n.º 60/2021 – Regulamento de Licenças para Instalações Eléctricas. Boletim da República (via ARENE), 2021. accessed 10 October 2026.
  7. Decreto n.º 93/2021 – Regulamento de Acesso à Energia nas Zonas Fora da Rede. Boletim da República (via ARENE), 2021. accessed 10 October 2026.
  8. Decreto n.º 80/2022 – Regulamento do Sistema Tarifário da Rede Eléctrica Nacional. Boletim da República (via ARENE), 2022. accessed 10 October 2026.
  9. Resoluções Normativas n.º 3/ARENE/2022 e n.º 4/ARENE/2022. ARENE, 2023. accessed 10 October 2026.
  10. Mozambique – National Energy Compact (Mission 300). Government of Mozambique / Mission 300, 2025. accessed 10 October 2026.
  11. Energy Profile: Mozambique. IRENA, 2025. accessed 10 October 2026.
  12. Population, total – Mozambique (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  13. Access to electricity (% of population) – Mozambique (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 10 October 2026.
  14. Urban population (% of total) – Mozambique (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 10 October 2026.
  15. Fixed broadband subscriptions (per 100 people) – Mozambique (IT.NET.BBND.P2). World Bank, 2024. accessed 10 October 2026.
  16. Boletim de Câmbios – taxas de câmbio de referência, 9 de Outubro de 2026. Banco de Moçambique, 2026. accessed 10 October 2026.
  17. M-Pesa – pagamentos e CREDELEC. Vodacom Moçambique, 2026. accessed 10 October 2026.

Questions about energy in Mozambique.

Talk to us about Olmack in Mozambique.Tell us about your home, housing portfolio or school estate in Mozambique. We'll explain what is possible there now.