How electricity works in Costa Rica.
Costa Rica electricity market 2026: ICE, ARESEP tariffs, eight distributors, NISE service numbers, Law 10086 distributed generation, AMI meters and the regional market.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Costa Rican colón (CRC) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Costa Rica energy at a glance.
Key figures for households in Costa Rica. Each one links to its source on the full overview below.
Electricity price.
58.16 CRC per kWh for households, including taxes. Figures for 2026.
Renewable share.
98.7% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Costa Rica.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Costa Rica below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Costa Rica requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Costa Rica.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Costa Rica, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Costa Rica, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Costa Rica.
The energy market in Costa Rica, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Costa Rica’s electricity sector is built around the state-owned Instituto Costarricense de Electricidad (ICE). ICE generates most of the country’s power, owns the national transmission network and, through its Centro Nacional de Control de Energía (CENCE), operates the national system and coordinates trade with the Central American regional market (MER). Final supply is a regulated public service provided by eight distribution companies, each with an exclusive service area: ICE itself, its subsidiary CNFL (the San José metropolitan area), two municipal utilities (JASEC in Cartago and ESPH in Heredia) and four rural electrification cooperatives. Households cannot choose their supplier.
Tariffs for every distributor are fixed by the regulator, ARESEP. For 2026 a CNFL household pays ¢58.16 per kWh for the first 200 kWh a month, before VAT, the street-lighting charge and the fire-service levy; most residential schedules have consumption bands, and a three-period time-of-use tariff is available to households with a smart (AMI) meter.
Renewable sources produced 98.66% of the electricity generated in the national system in 2025, according to Grupo ICE, after a dry 2024 in which the figure fell to 89.40% and thermal plants and imports filled the gap. Hydropower dominates, followed by wind and geothermal. Since Law 10086 of 2022 and its 2023 regulation, households and businesses can install renewable generation, storage and electric-vehicle charging as distributed energy resources of up to 5 MW, but the distributor is not obliged to buy their surplus energy.
Energy snapshot.
Headline figures for electricity in Costa Rica. Each shows its data year and links to its source.
- Population5,152,950 peopleSource 12025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (CRC)58.2 CRC/kWhSource 52026
- Household price (EUR)0.114 EUR/kWhSource 62026
- Renewable electricity share98.7%Source 82025
- Solar capacity0.083 GWSource 112025
- Wind capacity0.437 GWSource 122025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Limited
- Home equipment in grid services
- Developing
- Regulator
- ARESEP (Autoridad Reguladora de los Servicios Públicos); MINAE sets energy policy
- System operator
- ICE, through CENCE (Centro Nacional de Control de Energía), which also coordinates regional (MER) trade
- Distribution networks
- Eight distributors with exclusive areas: ICE, CNFL, JASEC, ESPH, Coopelesca, Coopeguanacaste, Coopesantos and Coopealfaroruiz
- Currency
- Costa Rican colón (CRC)
- Voltage and frequency
- 120 V and 120/240 V / 60 Hz
Electricity prices in Costa Rica.
- Household price (CRC)
- 58.2 CRC/kWh (2026)Source 5CNFL residential tariff (T-RE), 1 January to 31 December 2026, including the 2026 generation-cost adjustment (CVG): the first 30 kWh are billed as a fixed charge of ¢1,744.80 and kWh 31–200 at ¢58.16, so a home using up to 200 kWh pays ¢58.16 per kWh. Each kWh from 201 to 300 costs ¢89.24 and above 300 ¢92.27. Excludes VAT, the street-lighting charge and the fire-service levy. ICE’s own tariff for homes using 0–140 kWh is ¢56.14/kWh plus a fixed charge of ¢1,147.43.
- Household price (EUR)
- 0.114 EUR/kWh (2026)Source 6Converted from ¢58.16/kWh at EUR 1 = ¢510.99, derived from the Central Bank of Costa Rica reference selling rate for 9 October 2026 of ¢456.61 per US dollar and the BCCR euro rate for the same day of USD 1.1191 per euro (source bccr-eur).
- Typical annual electricity bill
- 139,584 CRC/yr (2026 tariffs (annualised))Source 5Illustrative, derived: a CNFL household on tariff T-RE using 200 kWh every month (¢1,744.80 fixed charge for the first 30 kWh plus 170 kWh × ¢58.16 = ¢11,632 a month) × 12. Excludes VAT, the street-lighting charge and the fire-service levy. 200 kWh is an illustrative level, not an official average.
How the tariff is built
ARESEP’s Energy Directorate (Intendencia de Energía) sets tariffs separately for ICE generation, ICE transmission and each of the eight distribution systems. The residential price a household sees is the distribution tariff of its local company, which already includes the cost of buying energy from ICE generation, transmission and the company’s own network costs.
On top of the base tariffs, ARESEP applies a generation-cost adjustment (Costo Variable de Generación, CVG) to recover the cost of fuel for thermal generation and net imports from the regional market. For 2026, resolution RE-0072-IE-2025 of 12 December 2025 lowered tariffs slightly (about 4% for both ICE and CNFL residential customers), because ARESEP expected thermal generation to fall from about 11% of production in 2024 to about 2% in 2025 and hydrological conditions to improve.
Taxes and other charges
ARESEP’s schedules state that the energy prices do not include the street-lighting charge, VAT or the fire-service levy (importe de bomberos); these are added on the bill.
Differences between distributors
Each distributor has its own tariff because costs differ between areas. CNFL’s schedule is cheaper than ICE’s for small homes but its time-of-use tariff has a bigger gap between peak and night prices. The cooperatives have their own schedules; for example, Coopesantos charged ¢75.50 for the first 200 kWh in the first quarter of 2026.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Residential tariff T-RE for homes with demand below 10 kW. ARESEP sets a separate schedule for each distributor. In 2026 ICE uses five consumption bands (0–140, 141–195, 196–250, 251–370 and 371 kWh and above), each with its own fixed charge (¢1,147.43 to ¢7,924.29) and energy price (¢56.14 to ¢99.70/kWh). CNFL charges ¢58.16 up to 200 kWh, ¢89.24 from 201 to 300 kWh and ¢92.27 above that. |
| Time-of-use | Limited | Residential time-of-use tariff T-RH, for homes below 10 kW with a multi-rate meter. Peak is 10:01–12:30 and 17:31–20:00 on weekdays, off-peak (valle) 6:01–10:00 and 12:31–17:30, and night 20:01–6:00. In 2026 ICE charges ¢129.80 peak, ¢89.19 off-peak and ¢65.07 at night; CNFL charges ¢134.62, ¢55.19 and ¢23.10 for homes using up to 500 kWh. ICE offers it only where the supply has an AMI meter in a remote-reading area, with exceptions considered for electric-vehicle owners or homes using more than 690 kWh a month. |
| Prepayment | Limited | Tariff T-RP (prepaid residential) uses the same prices as T-RE. Customers can join voluntarily, and customers repeatedly in arrears can be moved onto it. Coopeguanacaste, for example, requires a smart meter and excludes homes using more than 3,000 kWh a month and services with distributed generation. |
| Other | Yes | Homes whose demand exceeds 10 kW at least once are moved to a demand-based (binomial) residential tariff, billed for at least 10 kW, until demand stays below 10 kW for six consecutive bills. ARESEP also sets a preferential social tariff (T-CS), which is a separate non-residential category. |
| Dynamic | No | No residential tariffs linked to hourly or regional market prices were identified. Fuel and import costs are passed through by an annual generation-cost adjustment (CVG). |
| Fixed | No | There are no competing fixed-price contracts. Regulated prices are reset by ARESEP, normally with an annual CVG adjustment that applied from 1 January to 31 December 2026. |
Household prices compared with neighbouring countries (EUR per kWh).
- Honduras€0.215
- Guatemala€0.209
- El Salvador€0.168
- Nicaragua€0.158
- Panama€0.157
- Costa Rica€0.114
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,382 kWh/person/yr (2025)Source 3Electric power consumption per person, all sectors (World Bank indicator EG.USE.ELEC.KH.PC; 2,381.7 kWh).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Sales of electricity in the national system rose 4.16% in the first half of 2026 compared with the same period of 2025, to 6,152,927 MWh, and ICE says every consumer sector except street lighting increased its use. Demand in 2025 was 12.45 TWh according to Ember.
Homes are classified as residential only if they are permanent dwellings; holiday homes, cabins, hotels and mixed-use buildings are billed under other tariffs. A home whose demand exceeds 10 kW at least once moves to a demand-based residential tariff until its demand stays below 10 kW for six consecutive bills.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 79.7 % of population (2025)Source 2
Around four in five Costa Ricans live in urban areas. CNFL serves the Greater Metropolitan Area around San José and the municipal utilities JASEC and ESPH serve parts of Cartago and Heredia, while ICE and the four rural electrification cooperatives cover most of the rest of the country.
Tariff rules distinguish permanent dwellings from tourist and holiday accommodation: houses and apartments used only as permanent homes, and the common areas of residential condominiums, are residential; cabins, holiday homes and apartment buildings served by a single meter are not.
How the grid works in Costa Rica.
- TransmissionInstituto Costarricense de Electricidad (ICE), Centro Nacional de Control de Energía (CENCE), part of ICE
- DistributionEight distributors with exclusive areas: ICE, CNFL, JASEC, ESPH, Coopelesca, Coopeguanacaste, Coopesantos and Coopealfaroruiz
- MeteringNot identified from a reliable public source.
- Supply8 or more retail suppliers
Physical flow
Power from large hydro, geothermal and wind plants, owned mostly by ICE but also by private generators and the cooperatives, flows over ICE’s transmission network to the distributors’ networks. The national system is connected to its neighbours through the Central American regional transmission network (the SIEPAC line), which allows imports in the dry season and exports when water is plentiful: for 2026 ARESEP assumed 330.16 GWh of imports and 158.47 GWh of exports.
Commercial flow
ICE’s generation business sells energy to the other distributors at ARESEP-regulated generation tariffs (2.75 TWh in the first half of 2026), and private generators sell to ICE under contracts authorised by Law 7200 on independent and parallel generation. Distributors then sell to final customers at their own regulated tariffs. Purchases from and sales to the regional market are made by ICE and coordinated by CENCE with the regional operator, the EOR.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio de Ambiente y Energía (MINAE) | Sets national energy policy and, under Law 10086, defines the maximum size of small-scale distributed generation (5 MW under Decree 43879-MINAE, to be reviewed every three years). |
| Regulator | Autoridad Reguladora de los Servicios Públicos (ARESEP) | Sets all electricity tariffs, issues the technical standards for supply quality, metering, connection and distributed energy resources, and resolves disputes between customers and distributors. |
| TSO | Instituto Costarricense de Electricidad (ICE) | State-owned group that generates most of the country’s electricity, owns the transmission network and also distributes power to about 938,000 customers outside the main urban areas. |
| System operator | Centro Nacional de Control de Energía (CENCE), part of ICE | Operator of the national system (Operador del Sistema): plans operation, dispatches generation in real time, manages ancillary services and coordinates exchanges with the regional market. |
| DSO | Compañía Nacional de Fuerza y Luz (CNFL) | ICE subsidiary distributing electricity in the Greater Metropolitan Area around San José to more than half a million customers. |
| DSO | JASEC and ESPH (municipal utilities) | JASEC (Junta Administrativa del Servicio Eléctrico Municipal de Cartago) and ESPH (Empresa de Servicios Públicos de Heredia) distribute electricity in parts of Cartago and Heredia. |
| DSO | Rural electrification cooperatives | Coopelesca, Coopeguanacaste, Coopesantos and Coopealfaroruiz distribute in their rural areas and also own generation, some of it through the Conelectricas consortium. |
| Exchange | Ente Operador Regional (EOR) / Mercado Eléctrico Regional (MER) | Regional operator that plans the regional transmission network, coordinates the regional system and administers the Central American wholesale market in which ICE buys and sells energy. The regional regulator is CRIE. |
Compared with the UK system.
| UK concept | Costa Rica equivalent | How it works |
|---|---|---|
| DNO | Empresa distribuidora (ICE, CNFL, JASEC, ESPH or a cooperative) | Each distributor holds a concession for its area and both runs the network and sells electricity to the customers in it. It approves new connections, installs the meter and authorises distributed generation, and must publish how much distributed generation each circuit can take. |
| National Grid/NESO | ICE transmission and CENCE | ICE owns the transmission network and its CENCE unit is the system operator. Unlike Great Britain, operation, transmission and most generation sit in the same state-owned group. |
| MPAN | NISE (electricity service number) | Each electricity service is identified by a service number that ICE calls the NISE. It is assigned by the local distributor, appears on the bill and is used in online accounts and for tariff changes. There is no national meter-point register in a common format. |
| MPRN | No equivalent identified | No piped-gas supply-point identifier was found in the sources reviewed. |
| Meter operator | The distributor | There is no separate metering market. The distributor owns and reads the meter under ARESEP’s metering standard (AR-NT-SUMEL); for distributed generation it installs a bidirectional meter and, for customers on energy-only tariffs, a generation meter. |
| Supplier | The same distributor (no retail choice) | Households buy from the distributor in whose area they live, at ARESEP’s tariff for that distributor. There is no supplier switching. |
| Smart-meter infrastructure | Distributor-run AMI systems | Each distributor deploys its own advanced metering infrastructure (AMI). ICE and CNFL installed over 700,000 AMI meters between 2022 and 2025. There is no central data hub like the DCC. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Número Identificador de Servicio Eléctrico (NISE) |
| Who issues it? | The local distributor (ICE, CNFL, JASEC, ESPH or a cooperative) |
| Format | A numeric service number assigned by the distributor to each electricity service. No public specification of its structure was found, and each distributor uses its own numbering. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the electricity bill and in the distributor’s online account; in ICE’s virtual agency it is selected under “Mis Servicios” to see service details and meter readings. |
| Electronic access | ICE customers can see their NISE, meter readings and whether the meter is read remotely (AMI) in the ICE virtual agency (agenciaelectricidad.cn.ice.go.cr) or by calling 1194. |
| Third-party access | No regulated third-party data-access scheme was identified. Changes to the service, such as transferring it to a new owner or tenant, need documents from both parties. |
| Who keeps the register | Each distributor keeps its own customer and service register; there is no national register. |
| Register scope | Per DSO |
In Costa Rica the electricity “account” is the service (servicio eléctrico) itself. When a property is connected, the distributor opens a service with a number (NISE at ICE) linked to the meter and to the customer who signed the supply contract. A provisional service of six months, renewable, can be granted while a building is under construction, and a definitive service when it is finished.
To open a service at ICE, the applicant must provide identity documents, proof of ownership or the owner’s authorisation, the stamped certificate of the electrical plans from the Federated College of Engineers and Architects (CFIA, the boleta de sellado), the declared load and the full address, and must have no debts with ICE.
When a property is sold or let, or the account holder dies, the service is transferred by a “traspaso de derechos”, which both parties complete in person with a property certificate or rental contract. Whether the number itself stays with the property after a transfer is not stated in the sources reviewed.
The number is also used for tariff changes. For example, to move to ICE’s time-of-use tariff, the service must be in an area with remote meter reading and have an AMI meter, the account must be up to date and the customer must sign a change request. Customers with distributed generation on that tariff need a different meter programme.
Because each distributor runs its own system, a customer moving between areas (for example from CNFL’s area in San José to Coopeguanacaste’s) gets a new service with that company.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | No |
| Net billing | Limited |
| How exported electricity is paid | Net billing (facturación neta completa): surplus can be sold to the distributor at a time-of-use price capped by ARESEP, but buying it is not compulsory for the distributor |
| How big can a system be? | Small-scale distributed generation for self-consumption covers systems of up to 5,000 kW (5 MW) connected to the national system. MINAE reviews this limit every three years. |
| Is the surplus paid for? | Only if the distributor chooses to buy it. Law 10086 allows distributors to buy surplus when it benefits them and their other customers, valued by time of use. For ICE in 2026 ARESEP’s maximum purchase prices (tariff T-TCVE) are ¢55.19/kWh at peak, ¢41.69 off-peak and ¢27.13 at night. |
| Are there charges for self-generators? | Yes. For ICE in 2026, customers on energy-only tariffs pay an access tariff (T-A) of ¢25 per kWh of self-supplied energy, and there is a capacity charge (T-TDER) of ¢255 per kW installed and staged interconnection charges (T-TCI) from ¢18,682 to ¢136,216. |
| What modes of operation are allowed? | Three: grid-connected with export, grid-connected without export (the system must prevent export) and island (off-grid). Systems without export need a sworn technical declaration by a CFIA engineer. |
| Are there exemptions for small or vulnerable users? | Yes. Households identified as vulnerable by IMAS with systems of up to 2 kW, and SMEs registered with MEIC with systems below 15 kW, are exempt from the ARESEP procedures; they notify the distributor and submit a CFIA engineer’s declaration, but still pay interconnection, metering and the regulated tariffs. |
| Can my circuit refuse me? | Each circuit has a penetration limit calculated with an ARESEP method, and distributors must publish the current limit for each circuit. Disputes go first to the distributor, which has ten working days to reply, then to ARESEP. |
Connecting a home system.
- Check the circuit’s published capacity for distributed energy resources on the distributor’s website.
- Have a CFIA-registered professional design the system and register the plans with the CFIA.
- Submit the distributed generation application form to the distributor before installing a system that will export.
- The distributor carries out a basic technical study of feasibility and notifies the result within the time set by ARESEP.
- Sign an interconnection contract with the distributor and pay the regulated interconnection charge (T-TCI).
- The distributor installs a bidirectional meter (and a generation meter where needed) and connects the system.
Law 10086 of 7 January 2022 on the promotion and regulation of distributed energy resources from renewable sources is the current framework. Its regulation, Executive Decree 43879-MINAE, was published on 1 February 2023. Distributed energy resources include renewable generation for self-consumption, energy storage, electric vehicles and demand response.
The law requires ARESEP to set tariffs so that customers with distributed resources are not subsidised by other customers, which is why self-generators pay access and capacity charges. Compensation for surplus energy is net billing at a regulated maximum price, not a one-for-one credit, and the distributor decides whether to buy. Some ICE customers still have contracts under the older “neta sencilla” scheme.
Systems below 500 kVA, or on a structure that already has environmental approval, need no municipal permit and no environmental assessment from SETENA.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use | No licence for distributed generation up to 5 MW; grid-connected systems need the distributor’s authorisation and an interconnection contract | Distributor, under ARESEP rules | Design by a CFIA-registered professional. Off-grid (island) systems still must meet the Electrical Code. |
| Generate electricity for sale to the grid | Not open to self-generators; private generators sell to ICE under Law 7200 (independent and parallel generation) | ICE, MINAE and ARESEP | Law 10086 excludes Law 7200 generators from using their concessions for distributed generation. Size limits under Law 7200 were not verified. |
| Store energy | No licence; storage is a distributed energy resource and grid-connected storage pays the tariffs ARESEP sets | Distributor, under ARESEP rules | Design and installation by a CFIA-registered professional. |
| Export surplus | Distributor authorisation before installation and an interconnection contract; sale only if the distributor agrees | Distributor; ARESEP sets the maximum price | Under facturación neta completa, the distributor is not obliged to buy. |
| Supply electricity to final customers | Public-service concession for a defined area; only the eight existing distributors hold one | Concessions under Decree 30065; tariffs by ARESEP | No competitive retail supply. |
| Aggregate DER | Aggregator must be legally established before ARESEP as an independent economic agent | ARESEP | Defined in Decree 43879-MINAE; no operating aggregator market was identified. |
| Wholesale and regional trading | Regional trading is carried out by ICE and coordinated by CENCE with the EOR | CENCE, EOR and CRIE | No national wholesale market open to independent traders was identified. |
| Provide ancillary services | Allowed for distributed resources under Law 10086, remunerated at tariffs set by ARESEP | ARESEP; operated through CENCE | Buying is at the distributor’s discretion and on technical and economic grounds. |
| Remote control of assets / VPP | No specific licence identified; distributors must have an advanced distribution management system (ADMS) to manage groups of distributed resources under interconnection contracts | Distributor, with technical requirements from CENCE and ARESEP | Framework set in Decree 43879-MINAE. |
Costa Rica’s electricity supply is a regulated public service, so most commercial activities are reserved to ICE and the concession-holding distributors. Law 10086 created a separate regime for distributed energy resources declared to be services of general interest: self-consumption generation, storage for self-consumption, demand management and the supply of energy information.
Installers and designers do not need an energy-sector licence, but plans must be signed by a professional registered with the CFIA and installations must meet the Electrical Code for the Safety of Life and Property (RTCR 458:2011). ARESEP can fine breaches of Law 10086 by between five and twenty base salaries.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services from distributed resources | Developing | — | Limited | CENCE / distributors. Law 10086 allows distributed resources to provide ancillary services, remunerated at ARESEP tariffs, and distributors may buy them on technical and economic grounds. No active procurement for household assets was identified. |
| Regional electricity market (MER) | No | — | No | EOR. Imports and exports are handled by ICE and coordinated by CENCE; small resources do not take part directly. |
| Time-of-use demand response | Yes | — | No | Distributors. The residential time-of-use tariff (T-RH) rewards shifting use to night hours; it is a tariff, not a market. |
Decree 43879-MINAE defines an aggregator as a person legally established before ARESEP as an independent economic agent that structures demand and can provide services to the distributor’s system operator. It also lists storage uses including arbitrage against time-of-use tariffs, demand-charge reduction, voltage and frequency support and back-up, and requires distributors to have an advanced distribution management system able to manage groups of distributed resources.
These rules are a framework rather than a working market: there is no national wholesale or balancing market open to third parties, and no aggregator was identified as operating.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Distributor-led AMI roll-out; Grupo ICE installed 716,744 AMI meters in 2022–2025 |
| Reading interval | Not published for household meters; demand-billed customers are measured over 15-minute intervals |
| AMI meters installed by Grupo ICE in 2025 | 100,012 |
| AMI meters installed by Grupo ICE in 2023 | 452,322 |
| Billing period | 27 to 33 days (ICE) |
| Needed for | ICE time-of-use tariff; prepaid supply at Coopeguanacaste |
There is no national smart-meter mandate or central data hub. Each distributor buys, installs and reads its own meters under ARESEP’s metering standard. ICE and CNFL (Grupo ICE) installed 61,774 AMI meters in 2022, 452,322 in 2023, 102,636 in 2024 and 100,012 in 2025.
At ICE, only services in areas with remote reading and an AMI meter can choose the time-of-use tariff, and customers can check whether their meter is read remotely in the virtual agency. Coopeguanacaste’s prepaid service gives daily readings and reconnects automatically after a top-up.
Renewable electricity.
Electricity generation mix (2025).
- Hydro: 74.8%
- Wind: 12.1%
- Geothermal and other renewables: 11.9%
- Solar: 0.7%
- Bioenergy: 0.5%
- Renewable electricity share
- 98.7% (2025)Source 8Share of electricity production in the national system (SEN) from renewable sources, reported by Grupo ICE. It was 89.40% in 2024, a dry year. On a demand basis, including imports, Grupo ICE reports 97.50% for 2025 and 86.80% for 2024.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Total installed capacity
- 3.7 GW (2024)Source 14IRENA statistical profile; renewables were 86% of capacity.
- Wind
- 0.437 GW (2025)Source 12
- Solar PV
- 0.083 GW (2025)Source 11
Targets.
- Grupo ICE strategic objective: aspire to produce 100% renewable electricity and diversify the electricity mix.
- ICE Generation Expansion Plan 2024–2040: about 2,495 MW of new net installed capacity, including 850 MW of new ICE plants and seven private solar and wind projects under Law 7200.
Costa Rica’s electricity is mostly renewable because of large hydro reservoirs, geothermal plants and wind farms. The share depends on rainfall: in 2024, a dry year, Grupo ICE reports that renewables produced 89.40% of national generation and the system had only 77 days of 100% renewable generation, against 98.66% and 276 days in 2025. The mix above comes from Ember, which reports no fossil generation in 2025; Grupo ICE’s own figure of 98.66% implies a small thermal share.
Solar is still a small part of utility-scale generation. ARESEP expects new private generation projects to start in the second half of 2026, and ICE notes lower hydro output from distributors’ own plants in the first half of 2026 because of a rainfall deficit.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Law 10086 treats storage as a distributed energy resource, and its regulation covers storage used for back-up, time-of-use arbitrage, demand-charge reduction and, subject to the system operator’s requirements, voltage and frequency support. Storage for self-consumption is a service of general interest, and storage that supplies the national system is recognised when it provides an ancillary service.
Large-scale flexibility in Costa Rica comes mainly from hydro reservoirs and from trade with neighbouring countries through the regional market.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| ICE (Instituto Costarricense de Electricidad) | ~43% of distributors’ projected 2026 sales revenue (derived from ARESEP); 938,257 customers on average to June 2026 | No | Limited | No | Limited |
| CNFL (Compañía Nacional de Fuerza y Luz) | ~32% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Yes | No | Limited |
| JASEC | ~6% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
| Coopeguanacaste | ~6% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
| Coopelesca | ~6% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
| ESPH (Empresa de Servicios Públicos de Heredia) | ~5% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
| Coopesantos | ~1% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
| Coopealfaroruiz | <1% of distributors’ projected 2026 sales revenue (derived from ARESEP) | No | Unknown | No | Limited |
These eight companies are both network operators and suppliers, each in its own area, so a household’s “supplier” is determined by its address. Market shares above are derived from ARESEP’s projected 2026 revenue from sales to final customers (before the CVG adjustment): ICE ¢391,093 million, CNFL ¢288,648 million, JASEC ¢57,337 million, Coopeguanacaste ¢57,278 million, Coopelesca ¢50,583 million, ESPH ¢48,874 million, Coopesantos ¢12,793 million and Coopealfaroruiz ¢2,206 million.
None offers a separate green tariff, as supply is already mostly renewable. “Export tariff: Limited” reflects that distributors may, but need not, buy surplus energy at the ARESEP maximum price.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministerio de Ambiente y Energía (MINAE) | Government | Energy policy | Sets national energy policy and issued the regulation of Law 10086 (Decree 43879-MINAE). |
| ARESEP | Regulator | Public services regulator | Sets every distributor’s tariffs and the technical standards for connection, metering and distributed resources. |
| Grupo ICE | Transmission | Generation, transmission, system operation (CENCE) and distribution | The backbone of the national electricity system and publisher of key operational statistics. |
| CNFL | Distribution | Distributor for the San José metropolitan area | Serves the largest urban customer base. |
| Conelectricas R.L. | Distribution | Consortium of rural electrification cooperatives | Develops generation for its member cooperatives. |
| Ente Operador Regional (EOR) | Market | Regional system and market operator | Runs the Central American regional market through which Costa Rica imports and exports power. |
| CRIE (Comisión Regional de Interconexión Eléctrica) | Regulator | Regional electricity regulator | Regulates the regional market and transmission network. |
| Colegio Federado de Ingenieros y de Arquitectos (CFIA) | Consumer | Professional college for engineers and architects | Registers the professionals who must design and sign electrical and distributed generation installations. |
| ACOPE | Renewable Energy | Association of private electricity producers | Represents private renewable generators that sell to ICE. |
| ACESOLAR | Solar | Solar energy association | Industry association for the solar sector. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Electrical installations | Electrical Code of Costa Rica for the Safety of Life and Property (RTCR 458:2011) | Decree 36979-MEIC | Distributed generation and storage installations must comply, as Decree 43879-MINAE requires. |
| Grid connection and system access | AR-NT-POASEN (planning, operation and access to the national system) | ARESEP | Sets protection and interconnection requirements for parallel operation. |
| Commercial supply rules | AR-NT-SUCOM (supervision of low and medium voltage supply) | ARESEP | Defines service classes, condominium rules and conditions used in tariffs. |
| Service connections | AR-NT-SUINAC (supervision of service connection installation and equipment) | ARESEP | Applied by distributors to new supplies and distributed generation. |
| Metering | AR-NT-SUMEL (use, operation and control of electricity meters) | ARESEP | Meter requirements, including for distributed generation. |
| Installer accreditation | CFIA registration and plan registration | CFIA | Design, inspection and construction of distributed generation and storage must be done by a CFIA-registered professional. |
| EV charging | INTE/IEC 61851-1 and INTE/IEC 61851-23 | INTECO (national adoption of IEC standards) | Referenced in Decree 43879-MINAE for charging connectors. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Municipal building permit for DER | Limited | Local | Not required for distributed resources below 500 kVA, or where the supporting structure already has environmental approval (Law 10086, article 10). |
| Environmental assessment (SETENA) | Limited | National | Not required for the same cases as the municipal permit exemption. |
| Distributor authorisation | Yes | Mixed | Needed before installing a system that will export, plus an interconnection contract. Systems that do not export need a sworn CFIA engineer’s declaration. |
| CFIA plans | Yes | National | Electrical plans registered with the CFIA, also needed for new supplies. |
Law 10086 removed municipal and environmental permits for most rooftop-scale systems, so the main approval is the distributor’s. Households classified as vulnerable by IMAS (up to 2 kW) and registered SMEs (below 15 kW) are exempt from ARESEP’s procedures but must notify the distributor before installing and present an engineer’s declaration afterwards.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net billing for distributed generation (facturación neta completa) | Active | Export payment | Distributors may buy surplus at time-of-use prices up to the ARESEP maximum (for ICE in 2026: ¢55.19 peak, ¢41.69 off-peak, ¢27.13 night per kWh); buying is not compulsory. | Since Decree 43879-MINAE (February 2023) |
| Residential time-of-use tariff (T-RH) | Active | Tariff | Lower night prices for homes with suitable meters, including those with electric vehicles; CNFL’s night price in 2026 is ¢23.10/kWh for homes using up to 500 kWh. | 2026 tariffs: 1 January – 31 December 2026 |
| Procedural exemption for vulnerable households and SMEs | Active | Simplified procedure | IMAS-identified households (≤2 kW) and MEIC-registered SMEs (<15 kW) are exempt from ARESEP procedures under Law 10086, article 13. | — |
Data and connectivity.
- Fixed broadband
- 23.3 fixed subscriptions per 100 people (2024)Source 4
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart-meter communications are chosen by each distributor. Decree 43879-MINAE requires distributors to report the communication protocols of registered distributed generation to the system operator every six months and to provide real-time information when required.
Grupo ICE also runs telecommunications services (kölbi and RACSA), and reported 38,377 km of installed fibre-optic network at the end of 2025.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 12.5 TWh (2025)Source 13Ember data via Our World in Data. Generation was 12.81 TWh.
- Generation capacity
- 3.7 GW (2024)Source 14
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Weather is the main risk to the system. In dry years such as 2024, lower hydro output means more oil-fired generation and more imports from the regional market, which raises costs through the CVG adjustment. ARESEP estimated an import price of US$129.55/MWh for 2026, against US$71.68/MWh for exports.
Distributors must calculate and publish how much distributed generation each circuit can take, using an ARESEP method, and the system operator updates the safe national penetration limit at least once a year.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Law 10086 on distributed energy resources | Current | January 2022 | Created the regime for distributed generation, storage, electric vehicles and demand management, with ARESEP setting cost-reflective tariffs. |
| Decree 43879-MINAE (regulation of Law 10086) | Current | February 2023 | Set the 5 MW limit for small-scale distributed generation, net billing, storage modes and the aggregator role. |
| 2026 tariff adjustment (RE-0072-IE-2025) | Current | 1 January 2026 | Applied a negative generation-cost adjustment for 2026, reflecting lower expected thermal generation, for all eight distributors. |
| New private generation projects | Upcoming | Second half of 2026 | ARESEP expects new private generation projects to start operating, adding capacity to meet demand growth. |
| Generation Expansion Plan 2024–2040 | Upcoming | 2024–2040 | About 2,495 MW of new net capacity, including 850 MW of new ICE plants and seven private solar and wind projects under Law 7200. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Total solar capacity was only about 0.08 GW in 2025 (IRENA), and Grupo ICE added 10.3 MW of distributed generation in 2025; surplus purchase is optional for distributors. |
| Distributed energy market | Medium | Law 10086 and Decree 43879-MINAE provide a full legal framework for generation, storage and EVs up to 5 MW, with simplified permits below 500 kVA, but with access and capacity charges. |
| Grid flexibility market | Low | Aggregators and DER ancillary services are defined in law but no operating market or aggregator was identified; only time-of-use tariffs are in use. |
| Energy storage adoption | Low | No official data on residential or grid batteries; storage is recognised in law since 2022. |
| Renewable growth environment | Low | IRENA reports renewable capacity grew only about 1% between 2019 and 2024, while the share is already near 100%; the 2024–2040 expansion plan foresees about 2,495 MW of new capacity. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 21 sources
- Population, total: Costa Rica. World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total population): Costa Rica. World Bank, 2025. accessed 9 October 2026.
- Electric power consumption (kWh per capita): Costa Rica. World Bank, 2025. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people): Costa Rica. World Bank, 2024. accessed 9 October 2026.
- RE-0072-IE-2025: application of the CVG methodology and electricity tariffs for 2026 (Alcance 161, La Gaceta 236, 16 December 2025). ARESEP (Intendencia de Energía), via Coopeguanacaste, 2025. accessed 9 October 2026.
- Tipo de cambio de referencia de venta (indicator 318), 9 October 2026. Banco Central de Costa Rica, 2026. accessed 9 October 2026.
- Euro (EUR) rate in US dollars (indicator 333), 9 October 2026. Banco Central de Costa Rica, 2026. accessed 9 October 2026.
- Reporte de Sostenibilidad Grupo ICE 2025. Grupo ICE, 2026. accessed 9 October 2026.
- Resumen ejecutivo: junio 2026. Grupo ICE, 2026. accessed 9 October 2026.
- Share of electricity production by source: Costa Rica (Ember). Our World in Data, 2025. accessed 9 October 2026.
- Installed solar capacity: Costa Rica (IRENA). Our World in Data, 2025. accessed 9 October 2026.
- Installed wind capacity: Costa Rica (IRENA). Our World in Data, 2025. accessed 9 October 2026.
- Electricity demand: Costa Rica (Ember). Our World in Data, 2025. accessed 9 October 2026.
- Energy Profile: Costa Rica. IRENA, 2025. accessed 9 October 2026.
- Ley 10086: Promoción y regulación de recursos energéticos distribuidos a partir de fuentes renovables (Alcance 3, La Gaceta 3, 7 January 2022). Asamblea Legislativa, via Coopeguanacaste, 2022. accessed 9 October 2026.
- Decreto Ejecutivo 43879-MINAE: Reglamento a la Ley 10086 (Alcance 17, La Gaceta 18, 1 February 2023). MINAE, via Coopeguanacaste, 2023. accessed 9 October 2026.
- Tarifa residencial horaria. ICE Electricidad, 2026. accessed 9 October 2026.
- Trámites (servicio eléctrico nuevo, traspaso de derechos, cambios de medidor). ICE Electricidad, 2026. accessed 9 October 2026.
- Generación distribuida. Coopeguanacaste, 2026. accessed 9 October 2026.
- Electricidad prepago: preguntas frecuentes. Coopeguanacaste, 2026. accessed 9 October 2026.
- Tarifas (T-RE, January–March 2026). Coopesantos, 2026. accessed 9 October 2026.
Questions about energy in Costa Rica.
It depends on the distributor and how much you use. In 2026 a CNFL household in the San José area pays ¢58.16 per kWh for the first 200 kWh a month, ¢89.24 for 201–300 kWh and ¢92.27 above that, before VAT, street lighting and the fire-service levy. ICE’s prices range from ¢56.14 to ¢99.70 per kWh depending on the consumption band, plus a fixed charge.
Your local distributor, which you cannot choose: ICE, CNFL, JASEC, ESPH, Coopelesca, Coopeguanacaste, Coopesantos or Coopealfaroruiz. ARESEP sets each company’s tariffs.
Only if your distributor agrees to buy it. Under Law 10086 and Decree 43879-MINAE you can connect a system of up to 5 MW and sell surplus at time-of-use prices capped by ARESEP (for ICE in 2026, ¢27.13–55.19 per kWh), but the distributor is not obliged to buy. You also pay access and capacity charges set by ARESEP.
The electricity service number, called the NISE at ICE. Each distributor assigns its own number to each service; it is on your bill and in your online account. There is no national meter-point register.
Very: renewables produced 98.66% of national generation in 2025 according to Grupo ICE, mainly hydro, wind and geothermal. In the dry year 2024 the figure fell to 89.40%.
Systems below 500 kVA need no municipal permit or SETENA environmental assessment, but the design must be done by a CFIA-registered professional and, if you want to export, the distributor must authorise the system before installation.
Yes. The residential time-of-use tariff (T-RH) has peak, off-peak and night prices; at ICE you need an AMI meter in a remote-reading area. CNFL’s 2026 night price is ¢23.10/kWh for homes using up to 500 kWh.