How electricity works in Libya.
Libya electricity 2026: state utility GECOL, gas (75%) and oil-fired supply, near-zero renewables (9.5 MW solar), heavily subsidised tariffs and high losses.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Libyan dinar (LYD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Libya energy at a glance.
Key figures for households in Libya. Each one links to its source on the full overview below.
Renewable share.
0% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Libya.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Libya below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Libya requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Libya.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Libya, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Libya, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Libya.
The energy market in Libya, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Libya’s public electricity supply is run by the General Electricity Company of Libya (GECOL), a state-owned, vertically integrated utility that generates, transmits, distributes and sells almost all of the country’s grid electricity. Policy sits with the Ministry of Electricity and Renewable Energy, while the Renewable Energy Authority of Libya (REAOL), established in 2007 by decision No. 426, is responsible for promoting and procuring renewable energy. An independent electricity regulator was proposed in World Bank-supported reform work in 2017, but no such body could be confirmed as operating.
Generation is almost entirely fossil-fuelled. Ember data show that in 2024 natural gas supplied 74.5% of Libya’s 34.6 TWh of electricity and oil 25.4%, with solar under 0.03%. IRENA records about 11 GW of installed capacity, virtually all thermal, and 9.5 MW of solar PV in 2025. Electricity demand per person — about 4,690 kWh in 2024 — is high for the region, and tariffs are heavily subsidised.
The sector’s main problems are financial and operational rather than a lack of plant. World Bank reviews in 2017 found residential tariffs set far below the cost of supply, commercial losses of around 60% and repeated load shedding. Libya has abundant solar resource — IRENA’s profile places most of its land area in the highest PV-yield classes — and REAOL is working with international partners on utility-scale solar, but as of October 2026 no national net-metering or feed-in scheme for households was identified.
Energy snapshot.
Headline figures for electricity in Libya. Each shows its data year and links to its source.
- Population7,458,555 peopleSource 72025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (LYD)Not identified from a reliable public source.
- Household price (EUR)Not identified from a reliable public source.
- Renewable electricity share0.03%Source 12024
- Solar capacity0.009 GWSource 52025
- Wind capacity0 GWSource 62024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- No independent regulator confirmed; the Ministry of Electricity and Renewable Energy oversees the sector
- System operator
- General Electricity Company of Libya (GECOL)
- Distribution networks
- GECOL owns and operates the national distribution network and sells to all grid customers
- Currency
- Libyan dinar (LYD)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Libya.
- Household price (LYD)
- Not identified from a reliable public source.
- Household price (EUR)
- Not identified from a reliable public source.
- Typical annual electricity bill
- Not identified from a reliable public source.
Libyan electricity is among the cheapest in the world for consumers, because tariffs are set by the state far below the cost of supply. The most recent detailed public analysis, the World Bank’s 2017 tariff framework review for GECOL, recorded a residential tariff of 20 dirhams (LYD 0.020) per kWh throughout 2011–17. Over 2010–15 GECOL’s own cost of supply ranged between 65 and 79 dirhams per kWh, and the review estimated the full cost to serve at roughly 167 dirhams per kWh once economic fuel costs were counted.
Fuel subsidies
Much of the gap is hidden in fuel prices. The World Bank’s 2017 rapid assessment noted that gas was invoiced to power plants at 8.4 dinars per 1,000 m³ against a market price of 377 dinars, so GECOL’s accounts understate the real cost of generation. The World Bank’s current country overview still describes Libya’s subsidy system as generous.
No published current tariff
GECOL’s website could not be reached for this profile and no tariff decision since 2017 was found in an official source, so no current price per kWh is shown. Converted at the Central Bank of Libya’s October 2026 rate, the 2011–17 residential tariff would be well under one euro cent per kWh. The dinar has weakened against the dollar — the World Bank’s official-rate average was LYD 4.83 per US dollar in 2024 and 5.30 in 2025, and the central bank quoted 6.43 on 8 October 2026 — which lowers the euro value of any unchanged dinar tariff.
Collection
What households are billed and what GECOL collects are different things. The 2017 World Bank reviews report that commercial losses — unbilled or unpaid electricity — had risen to around 60%, against a strategic-plan target of 9%.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Tariffs are set administratively for GECOL by the state. The 2017 World Bank review records customer-category tariffs for 2011–17 of 20 dirhams/kWh for residential, 68 dirhams/kWh for commercial and 30–42 dirhams/kWh for industrial customers depending on voltage (1 dinar = 1,000 dirhams). |
| Prepayment | Unknown | No current, verifiable information on a GECOL prepaid-meter programme was found. |
| Time-of-use | No | No time-of-use tariff for households was found. |
| Dynamic | No | There is no wholesale market or retail competition, so no price-indexed tariff exists. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 4,686 kWh/person/yr (2024)Source 4All sectors (electricity demand per person, Ember via Our World in Data).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Libya uses a lot of electricity for a country of 7.5 million people: demand was 34.6 TWh in 2024, or about 4,690 kWh per person (Ember). The World Bank’s 2017 assessment put residential use at 48% of total consumption — an unusually high share in a system where household tariffs are set far below the cost of supply.
Demand has been broadly flat in recent years because supply, not appetite, is the limit. Generation fell to 29.5 TWh in 2020 before recovering to about 35 TWh in 2022–23 (IRENA). The 2017 World Bank assessment projected peak demand of 13.1–18.2 GW by 2030 under different scenarios, far above the roughly 7 GW peak recorded in 2016.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 87.9% (2025)Source 9World Bank estimate of the urban share of population.
Nearly nine in ten Libyans live in urban areas, concentrated along the Mediterranean coast around Tripoli, Misrata and Benghazi; the interior is sparsely populated desert with isolated towns and oases. The last full census was taken in 2006, so current official housing statistics are limited.
World Bank data put access to electricity at 77.4% of the population in 2024, up from 70.2% in 2021. Remote settlements, pastoral wells and border posts beyond the grid are served by diesel or by stand-alone solar systems such as the 378 photovoltaic systems REAOL has installed in remote areas.
How the grid works in Libya.
- TransmissionGeneral Electricity Company of Libya (GECOL)
- DistributionGECOL owns and operates the national distribution network and sells to all grid customers
- MeteringGeneral Electricity Company of Libya (GECOL)
- Supply1 or more retail suppliers
Physically, Libya’s grid follows its coastline: most demand and most power plants sit along the Mediterranean between the Tunisian border, Tripoli, Misrata, Sirte, Benghazi and the Egyptian border, with long lines running south to towns such as Sabha. The World Bank’s 2017 assessment recorded 15 thermal power plants with 68 units (gas turbines 48% of capacity, combined cycle 38%, steam 14%), a nameplate capacity of 10.3 GW but only about 7.5 GW effectively available, against a peak of around 7 GW. IRENA now records about 11 GW of installed capacity, with net additions of 300 MW in 2021, 185 MW in 2022, 235 MW in 2023 and 185 MW in 2024.
Commercially, GECOL is a state-owned, vertically integrated monopoly: it generates or procures power, runs the grid, and bills customers. There is no wholesale market. Fuel is supplied by the national oil sector at administered prices, and GECOL’s deficits are covered by the state.
Reliability and losses
Load shedding has been a recurring feature of the system; the World Bank’s 2017 assessment found only about 54% of nameplate generating capacity available. The 2017 World Bank reform programme made “zero load shedding” a first-wave objective and reported that commercial losses grew from 6.4 TWh in 2010 to 24.1 TWh in 2015 — around 60% of supply.
Reform plans
In 2017 World Bank-supported studies set out a phased programme: clarify the ministry’s policy role, separate GECOL’s generation, transmission and distribution into business units with their own accounts, create an independent regulator (LEMRA), and open generation to independent power producers including renewables procured through REAOL. How far this has been implemented could not be verified from official sources.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Electricity and Renewable Energy | Responsible for electricity policy and oversight of GECOL. The 2017 World Bank reform roadmap assigned it policy-making responsibility in a restructured sector. |
| Regulator | None confirmed | The 2017 World Bank-supported reform programme proposed an independent Libyan Electricity Market Regulatory Authority (LEMRA) and published a roadmap for it. No operating independent regulator could be confirmed; tariffs are set by the state. |
| TSO | General Electricity Company of Libya (GECOL) | Owns and operates the national transmission network and dispatches the thermal power plants it also runs. |
| DSO | General Electricity Company of Libya (GECOL) | Owns and operates the distribution networks nationwide. Reform plans in 2017 proposed separating generation, transmission and distribution into distinct business units within GECOL. |
| Supplier | General Electricity Company of Libya (GECOL) | Bills and collects from all grid customers. |
| Metering | General Electricity Company of Libya (GECOL) | Owns and reads customer meters. |
Compared with the UK system.
| UK concept | Libya equivalent | How it works |
|---|---|---|
| DNO | GECOL (distribution) | There are no separate regional distribution companies. GECOL runs the low- and medium-voltage networks across the country as part of one state utility. |
| National Grid/NESO | GECOL (transmission and dispatch) | GECOL owns the high-voltage grid and also dispatches its own power stations. There is no independent system operator or balancing market. |
| MPAN | GECOL customer account / subscriber number and meter number | No standardised national supply-point number has been published. A connection is identified in GECOL’s billing records by the customer account and the meter installed. |
| MPRN | None identified | Natural gas is used mainly for power generation (74.5% of electricity in 2024); no domestic gas supply-point identifier was found. |
| Meter operator | GECOL | GECOL owns, installs and reads meters. There is no competitive metering market. |
| Supplier | GECOL | Customers cannot choose a supplier; GECOL sells all grid electricity. |
| Smart-meter infrastructure | None published | There is no central data hub like the DCC and no published national smart-meter programme. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | GECOL customer (subscriber) account number and meter number |
| Who issues it? | General Electricity Company of Libya (GECOL) |
| Format | Not publicly documented. Each connection is recorded against a customer account in GECOL’s billing system and the serial number of the meter installed. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the GECOL electricity bill or connection contract. |
| Electronic access | No public online consumption-data service for GECOL customers could be verified. |
| Third-party access | No regulated framework for third-party access to metering data exists. |
| Who keeps the register | GECOL customer and billing systems |
| Register scope | National |
Libya has no published, standardised supply-point identifier comparable to an MPAN or a European EAN code. Because GECOL is the only network operator and the only supplier, there has been no need for a separate identifier to support supplier switching or market settlement. A household’s connection exists as an account in GECOL’s billing system, linked to the meter installed at the property.
The format of GECOL account numbers is not published, so no example is given here. In practice a household refers to its supply by the account or subscriber number printed on its bill, and GECOL staff identify the installation by its meter serial number.
Who keeps the records
GECOL keeps the only customer database. Because it is a single national utility, the register is in effect national, but it is an internal commercial system rather than a public register maintained under regulation.
Unbilled consumption
The World Bank’s 2017 work found commercial losses of around 60%, meaning a large share of electricity was consumed without being billed or paid for. Improving metering, billing and collection was one of the main aims of the proposed GECOL reform programme.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Unknown |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | No published scheme for paying households for electricity exported to the grid was identified. |
| Can a household sell solar power back to the grid? | No net-metering, net-billing or feed-in rules for households have been published. REAOL has run a pilot of 10 grid-connected rooftop systems of 3.5 kW each, but no general scheme followed. |
| Does it make financial sense to export at current tariffs? | With grid electricity priced far below cost (LYD 0.020/kWh for households in 2011–17, per the World Bank), household solar is typically installed for back-up during load shedding rather than to reduce bills. |
| How do larger solar projects connect? | Through REAOL-led development with international partners and contracts with the state, connecting to GECOL’s transmission network. |
Connecting a home system.
- There is no published procedure for households to connect a solar system for export.
- Utility-scale renewable projects are developed with REAOL and contracted with the state; companies must be registered with REAOL and hold a valid licence to take part in its tenders.
- Grid connection of any generator is subject to GECOL’s technical approval as owner of the network.
Libya has no established framework for small-scale export. Very low tariffs mean that grid electricity is cheap whenever it is available, so the value of rooftop solar lies in keeping power on during outages. REAOL’s pilot of ten 3.5 kW grid-connected rooftop systems remains the only documented grid-tied household programme.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (utility scale) | No published licensing regime or thresholds; generation is carried out by GECOL or contracted by the state | Ministry of Electricity and Renewable Energy / GECOL; REAOL for renewables | The 2017 reform roadmap proposed opening generation to independent power producers under a future regulator. |
| Generate for own use (self-generation) | No published licence requirement or threshold | — | Diesel generators and off-grid solar for back-up are widely used; no specific rules were found. |
| Export / sell to the grid | No household export scheme; larger sales only by contract with the state | GECOL / Ministry | No net-metering rules have been published. |
| Renewable project tenders | Company registration with REAOL and a valid REAOL licence required to bid | REAOL | Separate registration categories for contractors and suppliers (including manufacturers). |
| Transmission and distribution | State monopoly of GECOL | Ministry of Electricity and Renewable Energy | No licensing of private network operators exists. |
| Supply / retail sale | State monopoly of GECOL | Ministry of Electricity and Renewable Energy | No retail competition. |
| Store electricity | No specific storage licence identified | — | No grid-scale storage has been reported. |
| Aggregation, VPP, balancing and grid services | No framework; no market exists | — | Balancing is done by GECOL. |
| Wholesale and cross-border trading | No wholesale market; trading only by the state utility | GECOL | Ember data show generation and demand in balance in 2024, i.e. negligible net imports. |
| Remote control of customer assets | No framework | — | No demand-response programme was found. |
Libya has no published electricity licensing regime of the kind found in liberalised markets. GECOL holds the generation, transmission, distribution and supply functions as a state monopoly, and no independent regulator issuing licences could be confirmed. The 2017 World Bank-supported reform work drafted an electricity act and a roadmap for a regulator (LEMRA) that would license activities and independent power producers.
The only documented licensing requirement relevant to installers and developers is REAOL’s: companies must be registered with REAOL and hold a valid licence from it before they can bid in any REAOL tender.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing and reserves | No | — | No | GECOL. GECOL balances the system with its own thermal plants. There is no market for third-party balancing services. |
| Demand response | No | — | No | No demand-response programme was found; shortfalls are managed by load shedding. |
There is no market in which household batteries, solar or flexible loads can be paid for flexibility. When available capacity falls short of demand, GECOL rotates load shedding between areas. Without a wholesale market, cost-reflective tariffs or a regulator, there is currently no route for aggregators or virtual power plants.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme published |
| Reading interval | Not published |
| Meter owner | GECOL |
| Smart-meter penetration | Not published |
| Data hub | None |
| Commercial losses | Around 60% (World Bank, 2017) |
GECOL owns and reads all customer meters, and no national smart-meter or prepaid-meter programme could be verified from an official source. The high level of commercial losses documented by the World Bank in 2017 is the main reason metering, billing and collection feature prominently in reform plans for the utility.
Renewable electricity.
Electricity generation mix (2024).
- Gas: 74.5%
- Oil: 25.4%
- Solar: 0%
- Renewable electricity share
- 0.03% (2024)Source 1Share of electricity generation (Ember via Our World in Data): solar 0.029%, gas 74.5%, oil 25.4%. Generation (34.59 TWh) and demand (34.59 TWh) were equal in 2024, so net imports were negligible.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 1.14 MW (2025)Source 5Derived from IRENA capacity: 9.473 MW (2025) minus 8.333 MW (2024).
- Solar PV
- 0.009 GW (2025)Source 5
- Wind
- 0 GW (2024)Source 6
- Fossil fuels (total installed)
- 11 GW (2024)Source 6IRENA chart label, rounded to the nearest GW.
Targets.
- Libya Renewable Energy Strategic Plan 2013–2025 (listed by IRENA as the current renewables policy document).
- National renewable energy and energy efficiency strategy, including the “GO GREEN” initiative, under implementation by REAOL with the Ministry of Planning (May 2024).
Renewables play almost no part in Libya’s electricity supply. Solar produced about 8 GWh in 2023 out of 35,105 GWh (IRENA), and the IRENA profile records no hydro, wind or bioenergy capacity. Installed solar has grown slowly from 5.1 MW in 2018 to 9.5 MW in 2025, much of it off-grid.
REAOL’s documented projects are small: 26 wind and solar measurement stations, 378 photovoltaic systems for remote homes, pastoral wells, security gates and border checkpoints, solar systems for more than 20 health centres and clinics, and a pilot of 10 grid-connected 3.5 kW rooftop systems. In 2024 REAOL held talks with TotalEnergies Libya, TBEA and other partners on utility-scale solar and wind development and on preliminary site studies at Jufra and Ghadames.
The resource is exceptional. IRENA’s profile shows most of Libya’s land area in the highest PV-yield classes (around 1.8–2.0 MWh per kWp per year), and some coastal and interior areas have usable wind.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No utility-scale battery storage has been reported in Libya. Behind the meter, households and businesses use inverter batteries and generators to ride through load shedding, but there is no published count.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| General Electricity Company of Libya (GECOL) | All grid customers | No | No | No | No |
GECOL is the only electricity supplier to grid customers in Libya. There is no retail competition and no independent supplier. GECOL’s website could not be reached when this profile was prepared.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Electricity and Renewable Energy | Government | Ministry responsible for electricity | Sets electricity policy and oversees GECOL. No working official website could be reached, so the World Bank sector reform report describing its role is linked. |
| General Electricity Company of Libya (GECOL) | Transmission | State-owned vertically integrated utility | Generates, transmits, distributes and sells almost all grid electricity. |
| Renewable Energy Authority of Libya (REAOL) | Renewable Energy | Renewable energy agency | Promotes and develops solar and wind projects, runs measurement stations and off-grid PV programmes, and registers and licenses companies bidding in its tenders. |
| Bureau of Statistics and Census | Government | National statistics office | Publishes population estimates, census results and the MICS7 household survey. |
| Central Bank of Libya | Government | Central bank | Publishes the official dinar exchange rates used to compare prices. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Renewable project technical specifications | REAOL technical specifications (GO GREEN initiative) | REAOL | In May 2024 the Ministry of Planning and the national technical centre were asked to adopt technical specifications prepared by REAOL with international companies; the specifications themselves are not published online. |
| Contractor and supplier registration | REAOL company registration and licence | REAOL | Required before bidding in any REAOL tender. |
| Grid connection | GECOL technical requirements | GECOL | No published grid code or small-generator connection standard could be found. |
| Supply voltage | 230 V, 50 Hz | — | European-style low-voltage supply. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| GECOL connection approval | Limited | National | Needed only where a system is to be connected to the grid; most home solar operates as back-up or off-grid. |
| REAOL registration and licence | Limited | National | Required for companies bidding in REAOL tenders, not for households. |
| Planning permission | Unknown | Local | No specific planning rule for rooftop solar was found. |
For a household installing solar for its own use there is no published, specific permitting route, and no grid-export scheme to apply to. Companies wishing to work on public renewable projects must register with REAOL and hold a valid REAOL licence.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Subsidised electricity tariffs | Active | Consumer price subsidy | Electricity is sold well below cost; the World Bank’s 2017 review found residential tariffs far below cost-recovery levels and fuel supplied to power plants at a fraction of market prices. This is a general consumption subsidy rather than a renewables incentive. | — |
| REAOL off-grid PV programme | Active | Public programme | 378 photovoltaic systems installed for remote homes, pastoral wells, security gates and border posts, with ongoing maintenance, plus solar systems for more than 20 health centres. | — |
Data and connectivity.
- Fixed broadband
- 82 % of population (2024)Source 10Individuals using the internet (ITU via World Bank), not fixed broadband.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
About 82% of Libyans used the internet in 2024, mostly over mobile networks. No smart-metering communications infrastructure has been published.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 34.6 TWh (2024)Source 3Ember.
- Generation capacity
- 11 GW (2024)Source 6Installed capacity, IRENA chart label rounded to the nearest GW; available capacity is lower (the World Bank found about 7.5 GW effectively available against 10.3 GW nameplate in 2016).
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The binding constraint in Libya is the availability of thermal plant, fuel and network capacity rather than demand. Installed capacity of around 11 GW exceeds historic peaks, but in 2016 the World Bank found only about 7.5 GW of 10.3 GW nameplate capacity effectively available, and load shedding has been used to balance the system. Commercial losses of around 60% (2017) also mean demand is high relative to what is paid for.
With virtually no variable renewable generation on the system, curtailment and renewable integration are not yet issues; any large solar programme would need GECOL grid reinforcement and dispatch arrangements that do not currently exist.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Electricity sector restructuring and independent regulator (LEMRA) | Upcoming | Proposed 2017; no implementation date confirmed | World Bank-supported roadmap to unbundle GECOL into business units, create an independent regulator and admit independent power producers. Progress could not be verified. |
| National renewable energy and energy efficiency strategy (GO GREEN) | Current | Implementation discussed May 2024 | REAOL and the Ministry of Planning working on the first phase, including adoption of technical specifications. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | — | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | IRENA records 9.47 MW of solar in total (2025); no net-metering or export scheme exists and the only grid-tied residential programme was a 10-system pilot. |
| Distributed energy market | Low | No net-metering or net-billing rules; distributed generation is limited to back-up and off-grid systems. |
| Grid flexibility market | Low | No wholesale, balancing or demand-response market; GECOL is a vertically integrated monopoly and shortfalls are managed by load shedding. |
| Energy storage adoption | Low | No grid-scale storage reported and no published behind-the-meter figures. |
| Renewable growth environment | Low | Renewables 0.03% of generation in 2024 (Ember); solar capacity grew by about 1.1 MW in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 24 sources
- Share of electricity production by source — Libya (CSV). Our World in Data (Ember; Energy Institute), 2024. accessed 10 October 2026.
- Electricity production by source — Libya (CSV). Our World in Data (Ember; Energy Institute), 2024. accessed 10 October 2026.
- Electricity demand — Libya (CSV). Our World in Data (Ember), 2024. accessed 10 October 2026.
- Per capita electricity demand — Libya (CSV). Our World in Data (Ember), 2024. accessed 10 October 2026.
- Installed solar PV capacity — Libya (CSV). Our World in Data (IRENA), 2025. accessed 10 October 2026.
- Energy Profile — Libya. IRENA, 2025. accessed 10 October 2026.
- Population, total — Libya (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
- Access to electricity (% of population) — Libya (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 10 October 2026.
- Urban population (% of total) — Libya (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 10 October 2026.
- Individuals using the Internet (% of population) — Libya (IT.NET.USER.ZS). World Bank / ITU, 2024. accessed 10 October 2026.
- Official exchange rate (LCU per US$) — Libya (PA.NUS.FCRF). World Bank, 2025. accessed 10 October 2026.
- Currency exchange rates. Central Bank of Libya, 2026. accessed 10 October 2026.
- Libya overview. World Bank, 2026. accessed 10 October 2026.
- Task C: GECOL institutional development and performance improvement — tariff framework review, tariff structure set-up and reform pathway. World Bank, 2017. accessed 10 October 2026.
- Libya — Supporting electricity sector reform: Task A rapid assessment of sector performance. World Bank, 2017. accessed 10 October 2026.
- Task A: sector performance and structural sector reform — final report. World Bank, 2017. accessed 10 October 2026.
- Task A: sector performance and structural sector reform — electricity act and sector restructuring. World Bank, 2017. accessed 10 October 2026.
- Task C: GECOL institutional development and performance improvement — final report. World Bank, 2017. accessed 10 October 2026.
- Renewable Energy Authority of Libya. REAOL. accessed 10 October 2026.
- Projects. REAOL. accessed 10 October 2026.
- Company registration. REAOL. accessed 10 October 2026.
- Meeting on implementing the national renewable energy and energy efficiency strategy. REAOL, 2024. accessed 10 October 2026.
- Cooperation between REAOL and TotalEnergies Libya. REAOL, 2024. accessed 10 October 2026.
- Bureau of Statistics and Census — population estimates and census history. Bureau of Statistics and Census, Libya, 2020. accessed 10 October 2026.
Questions about energy in Libya.
Electricity is heavily subsidised. The most recent published tariff, in a 2017 World Bank review, was 20 dirhams (LYD 0.020) per kWh for households in 2011–17 — far below the cost of supply. A current official tariff could not be verified.
The General Electricity Company of Libya (GECOL), a state-owned utility, generates, transmits, distributes and sells almost all grid electricity. Customers cannot choose another supplier.
Hardly at all. In 2024 gas supplied 74.5% of generation and oil 25.4%, with solar about 0.03% (Ember). IRENA records 9.5 MW of solar PV in 2025 and no wind capacity.
There is no published net-metering or feed-in scheme for households. The Renewable Energy Authority of Libya piloted ten 3.5 kW grid-connected rooftop systems, but home solar is used mainly for back-up during power cuts.
There is no standardised national supply-point number. A connection is identified by the GECOL customer account and meter number in GECOL’s billing system.
No independent regulator could be confirmed. The Ministry of Electricity and Renewable Energy sets policy and oversees GECOL; a regulator (LEMRA) was proposed in 2017 reform plans.
Load shedding reflects limited available generating capacity and very high unbilled consumption. World Bank studies in 2017 found only about 7.5 GW of 10.3 GW nameplate capacity effectively available and commercial losses of around 60%.