Energy in Malawi, explained.

How electricity works in Malawi: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Malawi: Not yet available.Olmack is not offered in Malawi yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Malawi.

Malawi electricity 2026: ESCOM single-buyer market, MERA-regulated prepaid tariffs, new net-metering rules, hydro dependence, MOMA interconnector and battery storage.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Malawian kwacha (MWK) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Malawi energy at a glance.

Key figures for households in Malawi. Each one links to its source on the full overview below.

  • Electricity price.

    122.25 MWK per kWh for households, including taxes. Figures for From 19 January 2026.

  • Renewable share.

    79.1% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Malawi.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Malawi below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Malawi requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Malawi.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Malawi, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Malawi, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Malawi.

Full overview

The energy market in Malawi, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Malawi’s power sector is built around two state-owned companies created when the old ESCOM was split under the Electricity (Amendment) Act 2016. The Electricity Generation Company (Malawi) Limited (EGENCO) runs the Shire River hydro stations and standby diesel plant. The Electricity Supply Corporation of Malawi (ESCOM) holds four separate licences: transmission, distribution, system and market operation, and single buyer. As single buyer, ESCOM buys all power from EGENCO, independent power producers (IPPs) and imports, and sells it to consumers. The Malawi Energy Regulatory Authority (MERA) licenses the sector and sets tariffs, and policy sits with the Ministry of Energy.

Fewer than one in eight Malawians gets electricity from the grid. The 2025 National Energy Compact put access at 25.9% of the population: 11.3% through the national grid and 14.6% through off-grid solar lights, solar home systems and similar products. Almost all grid-connected households use 11-digit STS prepaid keypad meters and buy tokens from ESCOM, banks and mobile-money services. Since 19 January 2026 domestic prepaid customers have paid MK79.90/kWh for the first 50 kWh a month and MK122.25/kWh above that. This followed the third of four approved base-tariff increases.

Hydropower from the Shire River supplies most electricity, but generation is constrained by ageing units, silt and debris, and the effects of Cyclone Ana. ESCOM reported an evening peak of 396 MW against 370 MW available in October 2024, so load shedding is common. The system is changing quickly. Utility solar has grown from almost nothing in 2019 to about 109 MW. A 20 MW / 40 MWh battery at Kanengo was commissioned in July 2026. The 400 kV Mozambique–Malawi (MOMA) interconnector was energised in August 2026, linking Malawi to the Southern African Power Pool for the first time. MERA’s net-metering rules, published in January 2025, let ESCOM customers export surplus renewable power in return for bill credits.

Energy snapshot.

Headline figures for electricity in Malawi. Each shows its data year and links to its source.

  • Population17,563,749 peopleSource 12018
  • Households3,984,986 householdsSource 12018
  • Average household size4.4 people/householdSource 12018
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (MWK)122.3 MWK/kWhSource 3From 19 January 2026
  • Household price (EUR)0.061 EUR/kWhSource 8From 19 January 2026
  • Renewable electricity share79.1%Source 102023
  • Solar capacity0.109 GWSource 102024
  • Wind capacity0 GWSource 102024
  • Energy storage capacity0.025 GWSource 272026
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Malawi Energy Regulatory Authority (MERA)
System operator
ESCOM System and Market Operator (SMO) licensee, which runs the Interconnected Power System
Distribution networks
One national distribution licensee, ESCOM, serving the whole grid through its Southern, Central and Northern regional operations
Currency
Malawian kwacha (MWK)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Malawi.

Household price (MWK)
122.3 MWK/kWh (From 19 January 2026)Source 3ESCOM tariff ET1 (domestic, prepaid, single-phase), unit charge above 50 kWh a month. The first 50 kWh a month cost MK79.90/kWh, and there is no fixed charge. The published schedule does not say whether VAT is included.
Household price (EUR)
0.061 EUR/kWh (From 19 January 2026)Source 8Converted from MK122.25/kWh (ET1, above 50 kWh) at the Reserve Bank of Malawi middle rate for 2 October 2026 of MK2,010.5364 per euro: 122.25 ÷ 2,010.5364 = 0.061. The first-50-kWh rate (MK79.90) converts to about EUR 0.040/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (MWK per kWh).

104.46132.3160.14Aug 2023Sep 2023Feb 2025Jan 2026
Malawi household electricity price, MWK per kWh
Aug 2023104.46 MWK/kWh
Sep 2023123.26 MWK/kWh
Feb 2025142.98 MWK/kWh
Jan 2026160.14 MWK/kWh

Tariffs are set by MERA through multi-year base-tariff determinations covering each ESCOM licensee (generation purchases, single buyer, transmission, system and market operation and distribution), with EGENCO’s generation tariff set separately. In September 2023 MERA approved a 50.8% rise in the average tariff, much less than the 69.7% ESCOM had requested. It was split into four tranches of 18%, 16%, 12% and 9% between 2023 and 2027, and each tranche after the first depends on the licensees meeting key performance indicators.

The first tranche raised the average tariff from MK104.46/kWh to MK123.26/kWh on 1 September 2023. The 16% second tranche followed in February 2025. The 12% third tranche took effect on 19 January 2026, when ET1 rose from MK71.35 to MK79.90 (first 50 kWh) and from MK109.05 to MK122.25/kWh. Press reports in May 2026 put the average consumer tariff at about MK160/kWh, which matches the approved path. The 9% fourth tranche has not yet been applied.

The domestic tariff rises in steps. The first 50 kWh a month are priced lower to protect small users, and general (commercial) customers pay much more: ET5 prepaid single-phase costs MK253.35/kWh. Prices are the same across the country because ESCOM is the only grid distributor. On 2 October 2026 the Reserve Bank of Malawi’s middle rate was MK1,734 to the US dollar.

The standard VAT rate is 17.5%. ESCOM began charging VAT on electricity in 2017, but the current tariff schedule does not say whether VAT is included in the unit charges, so the prices above are shown as published. Connection charges are separate. They are quoted after a site survey and can include a capital contribution, a refundable deposit, a connection fee and an inspection fee. The National Energy Compact found that 48.3% of unconnected households cite connection fees as the reason.

Tariff types.

Tariff types.
TariffAvailableDetail
PrepaymentYesET1 domestic prepaid single-phase: MK79.90/kWh for the first 50 kWh a month and MK122.25/kWh above 50 kWh, with no fixed charge (from 19 January 2026). ET3 domestic prepaid three-phase: a flat MK173.45/kWh. Tokens are bought by meter number at ESCOM service centres, banks, Airtel Money, TNM Mpamba and Puma filling-station agents.
RegulatedLimitedPostpaid domestic tariffs still exist for the shrinking number of credit-metered customers. ET2 (single-phase) costs MK70.70 and MK115.65/kWh plus MK8,960 a month, and ET4 (three-phase) costs MK168.10/kWh plus MK21,616 a month. ESCOM is moving the last 13,236 postpaid customers to prepaid meters.
Time-of-useLimitedOnly maximum-demand customers (ET9 low voltage, ET10 medium voltage, ET12 special agriculture) pay time-of-use rates. For ET9 these are MK315.30/kWh peak, MK131.80 standard and MK96.15 off-peak. Peak hours are 05:00–12:00 and 17:00–21:00 on weekdays, standard hours 12:00–17:00, and nights, weekends and public holidays are off-peak. Households have no time-of-use option.
DynamicNoThere is no retail competition and no tariff linked to wholesale prices. ESCOM, as single buyer, buys under bilateral power purchase agreements approved by MERA.
OtherLimitedNet-metered prosumers stay on their normal tariff. Under MERA’s Net Metering Rules, exports are credited at the energy component of the tariff, not paid in cash.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
112 kWh/person/yr (2023)Source 10Derived from IRENA’s 2023 national generation (2,224 GWh, all sectors) divided by the NSO’s projected 2023 mid-year population (19.81 million). This is generation per person, not household use.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
1.9 % of homes (2018)Source 175,267 of 3,984,981 households named electricity as their main cooking energy in the 2018 census (77.4% firewood, 18% charcoal). The National Energy Compact gives 1.7% of households for 2023.

Household electricity use is small and concentrated in towns. In the 2018 census only 11.4% of households (453,592) used grid electricity as their main source of lighting. Batteries were the main source for 52.9% and solar for 6.6%. Six years later, the National Energy Compact found that 56.5% of urban households but only 3.8% of rural households had a grid connection.

Cooking still relies on biomass: 77.4% of households cooked mainly with firewood and 18% with charcoal in 2018, and fewer than 2% cooked with electricity. Of connected households, 45.3% cannot afford regular payment for a basic 365 kWh a year, according to the National Energy Compact.

Total demand is limited by supply as well as by income. ESCOM reported an evening peak of 396 MW at 18:30 in October 2024, when solar output has stopped, against 370 MW available. During the day about 460 MW was available from hydro and solar. The National Energy Compact projects a base-case peak of 774 MW and energy demand of at least 5,166 GWh by 2030, driven by new connections, mining and agricultural mechanisation.

Housing and households.

Dwellings
4,805,431 housing units (2018)Source 1Housing units enumerated in the 2018 census: 41.1% permanent, 23.0% semi-permanent and 35.9% traditional (built from materials such as mud, grass thatch and poles).
Owner-occupied
85.1% (2018)Source 1Owner or family occupied (4,089,937 housing units).
Private rented
11.5% (2018)Source 1Rented housing units (554,738). The census does not split private and public landlords.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
16 % of population (2018)Source 12,783,364 of 17,563,749 people. Urban areas are the four cities (Blantyre, Lilongwe, Mzuzu, Zomba) plus district centres and town councils, and 12% of the population lived in the four main cities.

84% of Malawians lived in rural areas at the 2018 census. 85% of housing units were owner- or family-occupied, and more than a third were traditional structures. These features affect electrification. The National Energy Compact found that 40.2% of households are outside the range of a grid connection, and some cannot afford internal wiring.

Renting is mainly urban, and tenants need the owner’s permission to apply for a connection or a net-metering installation. ESCOM’s connection application asks for the owner’s details, and the Net Metering Rules require the applicant to be the legal owner or to hold the owner’s permission.

How the grid works in Malawi.

  1. TransmissionESCOM – System and Market Operator (SMO), ESCOM – Transmission licensee
  2. DistributionOne national distribution licensee, ESCOM, serving the whole grid through its Southern, Central and Northern regional operations
  3. MeteringESCOM (Distribution licensee)
  4. Supply1 or more retail suppliers

Physically, Malawi’s grid runs north–south along the length of the country. Most generation is in the south, on the Shire River below Lake Malawi, where EGENCO’s Nkula, Tedzani and Kapichira stations sit in a cascade. Power reaches Lilongwe, Mzuzu and the rest of the country mainly over 132 kV and 66 kV lines. Only 173 km of the network runs at 400 kV, around Phombeya, where the MOMA interconnector arrives. Distribution feeders run at 33 kV and 11 kV. In 2025 the network had about 2,650 km of transmission lines and 17,139 km of medium-voltage lines.

Commercially, Malawi is a single-buyer market. EGENCO and IPPs sell to the single buyer under MERA-approved power purchase agreements. The single buyer sells on to the distribution licensee, which supplies all grid customers at regulated tariffs. Large consumers cannot buy directly from generators, and there is no retail competition. The single buyer function was licensed to Power Market Limited (PML) in December 2020. It returned to ESCOM in 2023 when PML was wound up. After the High Court reversed PML’s voluntary liquidation in 2026, ESCOM and PML applied in May 2026 to move it back to PML.

Supply has been chronically short of demand. Several hydro units were out of service or derated in August 2026 because spare parts could not be bought with scarce foreign currency, and EGENCO expected the last repairs only in December 2027. Imports through the MOMA interconnector, the 20 MW / 40 MWh Kanengo battery and new solar plants are the main short-term responses. Larger hydro projects such as Mpatamanga (358 MW) are longer-term.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of EnergySets energy policy, owns the National Energy Compact (Mission 300) and the Integrated Resource Plan, and approves IPP and transmission projects recommended by the single buyer. In 2026 the Minister of Energy is Hon. Dr Jean Mathanga.
RegulatorMalawi Energy Regulatory Authority (MERA)Licenses generation, transmission, distribution, single buyer, system and market operation, import and export under the Energy Regulation Act and Electricity Act. It approves tariffs and power purchase agreements, maintains the Grid Code, issues the Net Metering Rules, registers private generators of 20 kVA and above, and issues permits to electrical installers and renewable-energy technology dealers.
SupplierElectricity Generation Company (Malawi) Limited (EGENCO)State-owned generator operating the Nkula, Tedzani, Kapichira and Wovwe hydro stations and standby diesel plant, and developing Salima solar phase II, Mpatamanga (358 MW, with partners) and the 300 MW Kam’mwamba coal project. It sells only to the single buyer.
SupplierESCOM – Single Buyer licenseeUnder the Electricity (Amendment) Act No. 12 of 2016 it forecasts demand, plans least-cost expansion, ranks and tenders generation projects, evaluates unsolicited IPP proposals, negotiates power purchase agreements for MERA approval, and contracts imports and exports. In May 2026 ESCOM and Power Market Limited applied to MERA to transfer this licence to PML.
System operatorESCOM – System and Market Operator (SMO)Operates the Interconnected Power System in real time, administers the market rules including balancing and settlement, sizes operating reserves under the Grid Code, and runs load shedding when supply falls short.
TSOESCOM – Transmission licenseeOwns the 400, 132 and 66 kV network: about 2,650 km of lines, 43 substations and 1,828 MVA of transformer capacity. The 400 kV Phombeya substation is the Malawi end of the MOMA interconnector.
DSOESCOM – Distribution licenseePlans, builds and operates the 33 kV and 11 kV networks (17,139 km) and the 400 V / 230 V networks. It connects customers, supplies and meters them, sells prepaid tokens, and processes net-metering applications.
MeteringESCOM (Distribution licensee)Owns and installs all revenue meters, runs the STS prepaid vending system, and keeps meter, token and customer records. The Net Metering Rules make it responsible for specifying, installing and reading bidirectional meters.
ExchangeSouthern African Power Pool (SAPP)Regional power pool. With the MOMA 400 kV line energised in August 2026, Malawi can join SAPP trading for the first time. Commercial imports from EDM (Mozambique) were awaiting tariff agreement in September 2026.

Compared with the UK system.

Compared with the UK system.
UK conceptMalawi equivalentHow it works
DNOESCOM Distribution licenseeThere is one distribution licensee for the whole national grid, a separately licensed business unit inside ESCOM. Unlike a UK DNO it also sells electricity to, bills and meters every grid customer.
National Grid/NESOESCOM Transmission licensee and System and Market OperatorTransmission ownership and system operation are separate licences held by the same state company. The SMO dispatches EGENCO, IPP and import capacity and runs load shedding. Ancillary services are defined in the Grid Code but are “not currently on the market”.
MPANESCOM meter number (11-digit STS prepaid meter number)There is no national supply-point register. A household connection is identified in practice by the number of the ESCOM prepaid meter installed there. It is used to buy tokens, check meter status and view token history. Postpaid customers also have an ESCOM account number.
MPRNNot applicableMalawi has no piped natural-gas network. Households cook with firewood and charcoal, and liquefied petroleum gas is sold in cylinders.
Meter operatorESCOMESCOM supplies, installs and programmes meters, and for net metering it specifies the meter, at the customer’s expense. Customers cannot choose a meter operator.
SupplierESCOM (single buyer and sole retailer)Households cannot switch supplier. ESCOM buys all wholesale power as single buyer and sells it to every grid customer at MERA-approved tariffs. Off-grid solar companies sell systems, not grid electricity.
Smart-meter infrastructureSTS prepaid keypad meters; no smart-meter networkThere is no smart-meter communications network or central data system like the UK’s DCC. Prepaid meters accept 20-digit tokens typed in by the customer. ESCOM reprogrammed them in 2023–24 for the global STS token-identifier rollover. Advanced metering is planned under the National Energy Compact.

How a supply point is identified.

04217653098 (fictional, illustrative only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?ESCOM meter number
Who issues it?Electricity Supply Corporation of Malawi (ESCOM) Limited
FormatNumeric number of the STS prepaid meter installed at the premises, used for token purchases and online look-ups. ESCOM moved users of older seven-digit meters to 11-digit meters. Postpaid customers also have an account number in ESCOM’s billing system, but these accounts are being phased out.
Length11 digits
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the front of the prepaid meter or its customer interface unit, and shown on every token receipt from ESCOM service centres, banks, Airtel Money, TNM Mpamba and other vendors.
Electronic accessESCOM’s website lets anyone enter a meter number to check whether the meter has been upgraded and to view token history for the last 90 days. The ESCOM mobile app, WhatsApp chatbot and USSD code *2020# give similar self-service access.
Third-party accessNo regulated data-access scheme exists. Banks, mobile-money operators and agents use the meter number only to sell tokens, and ESCOM’s token-history page needs only the meter number, not a customer login.
Who keeps the registerESCOM’s customer, metering and prepaid vending systems. Under the Net Metering Rules the distribution licensee must also keep a register of net-metered customer-generators and submit it to MERA every year.
Register scopeNational

Malawi has no separate supply-point identifier like the UK’s MPAN. ESCOM is the only grid distributor and retailer, so its own meter and account records identify each connection. For the great majority of households, which are on prepaid meters, the identifier that matters is the meter number. Each STS meter has a unique number, and a token bought for that number will work only in that meter. ESCOM moved older seven-digit meters to 11-digit meters from 2020. Through the Meter Migration Project it is moving the last 13,236 postpaid customers to prepaid meters.

To buy electricity the customer, or an agent, enters the meter number and pays. The customer receives a 20-digit token and types it into the meter’s keypad. In 2023–24 ESCOM reprogrammed about 537,000 prepaid meters for the international STS token-identifier rollover, before the old token identifiers expired on 24 November 2024. That target is the best published indication of how many prepaid customers ESCOM had at the time. The next rollover is due in 2045.

A new connection starts with an application at an ESCOM service centre or through the web portal, with a sketch map of the premises, a list of appliances and the owner’s details. ESCOM surveys the site and issues a quotation valid for 30 days. Once it is paid, the customer’s electrical contractor completes ESCOM wiring forms certifying the installation, and ESCOM inspects before connecting and fitting the meter. The meter is supplied and installed by ESCOM. No published rule was found on whether the meter number or account is reissued when an occupier changes, so whether the identifier stays with the property is recorded as unknown.

Net metering changes the metering arrangement. The rules require a meter that records import and export in separate registers, accurate to ±0.5% for exports, and say it may not be a prepaid type. They also describe how credits are converted into kWh for prepaid prosumers. The distribution licensee approves the meter specification and reads it every billing period, and estimated readings are not allowed.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringYes
Net billingNo
How exported electricity is paidBill credits only. Exports in a month are valued at the energy component of the customer’s approved tariff (at time-of-use rates for customers on a time-of-use tariff). Postpaid prosumers offset the energy part of their bill and carry any surplus forward. Prepaid prosumers have the credit converted into kWh each month. No cash is paid, and credit is forfeited when the contract ends.
What size of system is allowed?Up to the kVA equivalent of the customer’s main supply circuit-breaker rating, and never more than 500 kVA. ESCOM sets an overall limit for each network on a first-come, first-served basis.
Which feeder limits apply?Total generation on a radial line section may not exceed 15% of its annual peak load, or add more than 10% to fault current. Generation on a shared single-phase secondary is limited to 20 kVA in total, and a single-phase unit may not cause more than 3% imbalance on a three-phase transformer.
Who can export?Domestic, commercial, industrial, agricultural and mining customers of the distribution licensee. Only renewable sources qualify.
Can the system run during a power cut?Only in island mode for the customer’s own use. It must not back-feed a de-energised line and must reconnect safely when the grid returns.
Is there a feed-in tariff for small systems?No. The rules forbid ESCOM from paying money for exports. Selling power for cash requires a MERA generation licence and a power purchase agreement with the single buyer.
Who owns the carbon credits?The rules treat carbon credits as belonging to the customer-generator, subject to consultation with the Malawi Environmental Protection Authority.

Connecting a home system.

  1. Check eligibility: be an ESCOM customer with no unpaid bills, use only renewable generation, and be the owner of the premises or hold the owner’s written permission.
  2. Have a certified electrical installer design the system within the size limit, using certified grid-interactive equipment and a visible, lockable manual disconnect switch that ESCOM can reach.
  3. Submit the net-metering application form (Annexure B of the Net Metering Rules) to ESCOM, which acknowledges it within five business days. You then have ten business days to supply anything missing.
  4. ESCOM screens the application against feeder limits. If needed, it offers a further paid review of minor network changes.
  5. Register the system with MERA as private generation, as the rules require for net-metering customers.
  6. Install the system, carry out the commissioning test under the Distribution Code (which ESCOM may witness), and sign and return the interconnection agreement.
  7. ESCOM fits or approves a bidirectional meter at the customer’s expense, and net-metering billing begins.

MERA issued the Net Metering Rules under section 52 of the Electricity (Amendment) Act 2016. They are dated 18 October 2024 and were published in January 2025, alongside new inspector guidelines and the Malawi wiring and installation standard. MERA held public awareness meetings in Blantyre, Lilongwe and Mzuzu in March 2025.

ESCOM launched its net-metering project on 11 May 2026 and said it was finalising operational arrangements with MERA before full roll-out. Exports are valued only at the energy component of the tariff, so postpaid prosumers cannot use credit against fixed or network charges. Because credit carries forward, it is most valuable to customers whose generation and use are roughly balanced over the year.

Larger exporters follow a different route. A solar farm selling to the grid needs a MERA generation licence, published for public objections under by-law 6 of the Electricity By-laws 2012, a power purchase agreement with the single buyer approved by MERA, and environmental approval. EGENCO’s application for a 10 MW solar licence at Nanjoka, Salima, was advertised in August 2026.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for saleMERA generation (for sale) licence for any plant selling to the grid or third parties, advertised for 30 days of public objections before grantMERAA power purchase agreement with the single buyer (approved by MERA) and environmental and social impact approval are also needed. Tax incentives are available for priority-industry generation projects.
Generate for own use (private generation)Annual MERA Private Electricity Generation Registration Certificate for plant of 20 kVA and above; no registration below 20 kVAMERAGenerating 20 kVA or more without registration is an offence punishable by a fine and six months’ imprisonment. Certificates expire on 31 December each year.
Export (net metering)Registration as a private generator (by-law 66, Energy Regulation By-laws) plus an ESCOM interconnection agreement; capacity capped at the supply breaker rating and 500 kVAMERA / ESCOMRenewable sources only. Compensation is by bill credit, not payment.
Store electricityNo separate storage licence identified; grid-connected battery facilities must meet the Grid Code section for unconventional facilities (amended January 2025 to cover BESS)MERA (Grid Code)No separate rules for behind-the-meter batteries were identified. Installation work requires a MERA electrical installation permit.
Sell or supply to end customersMERA distribution licence (which covers supply); ESCOM is the national grid distribution licenseeMERAMini-grid operators can hold generation and distribution licences, but no dedicated mini-grid licensing law exists.
Wholesale purchase and resale (single buyer)Single buyer licence; only one licence exists (held by ESCOM, transfer to PML applied for in May 2026)MERAThe single buyer is the sole counterparty for IPP power purchase agreements and contracts for imports and exports.
Import or export across bordersMERA import/export licence; contracts are concluded by the single buyerMERA / Ministry of EnergyThe MOMA interconnector’s commercial terms with EDM were being finalised by the Ministry, ESCOM and PML in September 2026.
Aggregate or operate a VPPNo licence category or market exists; aggregation of customer assets is not provided for—Net-metering rules treat each customer-generator individually, with no pooling of credits.
Balancing and grid servicesGrid Code defines reserves, black start, reactive power and resonance control as ancillary services, but they are not currently procured through a marketESCOM SMO / MERAGenerators must provide some services as a connection condition, and others are contracted by the single buyer.
Remote control of customer assetsNot specifically regulated; net-metered systems must have a lockable manual disconnect that ESCOM can reachMERA / ESCOMNo rules on utility dispatch of behind-the-meter inverters or batteries were identified.
Install electrical or solar systemsAnnual MERA Electrical Installation Permit (classes A–D by scope of work) for anyone doing electrical installation work, including renewable installationsMERAWorking without a permit is an offence. MERA publishes a list of valid permit holders (renewed list as at 31 July 2026).
Import or sell renewable-energy technologiesMERA Renewable Energy Technologies licence (categories E and F, with separate “importation and selling” licences)MERAThe application (Form ERET I under the Energy Regulation By-laws 2008) asks for the equipment to be supplied, supplier arrangements, finances and staff qualifications.

Licensing rests on the Energy Regulation Act 2004 and the Electricity Act 2004 (amended in 2016 and 2024), with MERA’s Electricity By-laws 2012 (amended 2018) and Energy Regulation By-laws. The 2016 amendment separated EGENCO from ESCOM, created the single-buyer model and opened generation to IPPs. Private transmission investment is possible with the Minister’s approval on the single buyer’s recommendation. The 2024 amendment mainly toughened penalties for vandalism and theft of electricity infrastructure.

For households, two thresholds matter. Systems below 20 kVA used only on site need no MERA registration. Any system that exports under net metering must be registered as private generation, whatever its size. All installation work must be done by MERA-permitted electrical installers. MERA also licenses businesses that import or sell solar products, so the supply chain for solar home systems and rooftop kits is regulated as well as the installations.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Operating reserves (spinning, regulating, quick)No—NoESCOM System and Market Operator. Defined in the Grid Code: primary reserve from governor response, secondary reserve under automatic generation control (activated within 10 seconds, full within 10 minutes) and tertiary reserve (within 10 minutes, sustained for two hours). The SMO sizes them each year against a MERA-approved reference incident. Ancillary services are marked “not currently on the market”.
Black start and islandingNo—NoESCOM System and Market Operator. Units capable of islanding must provide the service and be certified by the SMO. Contracts sit with large generators.
Demand response / load sheddingNo—NoESCOM. Shortfalls are managed by rotational load shedding published by ESCOM, not by paid demand response.
Regional trading (SAPP)Developing—NoSingle buyer / SAPP. The MOMA interconnector was energised on 8 August 2026 with a 5 MW test import. Commercial trading, starting with contracted firm imports from EDM, awaited tariff agreement. Only the single buyer can trade.

Malawi has no flexibility market. ESCOM’s System and Market Operator balances the grid using EGENCO’s hydro, diesel standby plant, the Kanengo battery and, when supply runs short, load shedding. The Grid Code (Amendment 004, January 2025) sets out the ancillary services the system needs. It added a section for battery storage and renewable plant, but says these services are not yet traded. Because the single buyer is the only buyer, a third party cannot sell flexibility to anyone else.

For distributed resources, net metering is the only route to the grid, and it pays for energy only. There is no aggregator role, no payment for capacity or reserves, and no programme for controlling home batteries or inverters. The MOMA connection to SAPP brings regional trading, but only at the single-buyer level.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Kanengo BESS (ESCOM)A 20 MW / 40 MWh utility battery commissioned in July 2026 for peak shifting and fast frequency regulation. It is operated by ESCOM, not offered to third parties.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo smart-meter rollout; almost all households use STS prepaid keypad meters, and advanced metering is a planned flagship project
Reading intervalNot applicable (prepaid keypad meters record no interval data)
Household meteringSTS prepaid keypad meters with 11-digit meter numbers and 20-digit tokens
TID rollover358,947 of 537,000 targeted prepaid meters upgraded by 30 April 2024; next rollover due 2045
Postpaid migration13,236 remaining postpaid customers targeted from October 2025; 3,939 moved by December 2025; completion target 30 April 2026
Net-metering meterBidirectional with separate import and export registers, ±0.5% export accuracy, not prepaid, paid for by the customer
PlannedAdvanced metering infrastructure and full digitalisation of customer metering under the National Energy Compact

Prepayment is how Malawi controls its revenue. ESCOM began moving customers from postpaid to prepaid meters in 2016, and the final group of about 13,000 postpaid accounts was being converted in 2025–26 to cut billing disputes and arrears. The meters are one-way STS devices: they hold credit, count it down, and cut supply when it runs out, but do not send data back to ESCOM.

The worldwide STS token-identifier rollover forced ESCOM to reprogramme every prepaid meter in 2023–24. The old token identifiers expired on 24 November 2024. The National Energy Compact sets the next step as advanced metering and full digitalisation of customer metering, alongside GIS mapping of every new meter. No timetable or technology had been published by October 2026.

Renewable electricity.

Electricity generation mix (2023).

  • Hydro: 76.2%
  • Bioenergy: 2.3%
  • Solar: 0.6%
  • Fossil (diesel and other non-renewable): 20.9%
Source 10
Renewable electricity share
79.1% (2023)Source 10IRENA: 1,759 GWh of 2,224 GWh generated in 2023 came from renewables (hydro 1,694 GWh, bioenergy 51 GWh, solar 13 GWh). The government’s National Energy Compact gives a higher renewable share of 90.06% for 2023 and 90.22% for 2024, so the two sources differ on non-renewable output.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
0.393 GW (2024)Source 10
Solar PV
0.109 GW (2024)Source 10
Bioenergy
0.019 GW (2024)Source 10
Fossil fuels (diesel)
0.132 GW (2024)Source 10IRENA’s non-renewable total. The National Energy Compact lists 52 MW of thermal diesel.
Wind
0 GW (2024)Source 10

Targets.

  • Electricity access of 70% of the population by 2030, of which 30.1% through the grid (National Energy Compact).
  • Renewable share of the energy mix rising to 96.1% by 2030 (National Energy Compact).
  • An additional 848 MW of generation capacity by 2030, with 714 MW expected from the private sector.
  • About 1.49 GW of capacity under the 2022 Integrated Resource Plan, mostly renewable, plus 170 MW from interconnectors.

Hydropower is the foundation of Malawi’s grid. IRENA counts 393 MW, almost all on the Shire River, which drains Lake Malawi. This makes supply depend on lake levels and on the condition of plant affected by silt, debris and the 2022 Cyclone Ana. IRENA’s statistics put renewables at 79% of generation in 2023. The government’s figure is about 90%, so the sources differ on how much diesel and other non-renewable generation is counted.

Utility solar has been the fastest-growing source, and plants such as Golomoti (JCM Power and InfraCo Africa, 28.5 MWp with storage) and Salima have brought it to about a sixth of installed capacity. EGENCO is developing a 40 MW second phase at Salima and has applied for a 10 MW licence at Nanjoka. Without storage, solar output stops before the 18:30 evening peak, which is why grid batteries and imports are now priorities.

Off-grid solar reaches more people than the grid. The National Energy Compact counts 14.6% of the population with off-grid access, mainly solar lighting, lanterns and home systems sold by licensed dealers, compared with 11.3% connected to the grid. The World Bank-supported ASCENT programme (US$245.8 million from IDA) funds both new grid connections and off-grid solar.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
50 MWh (2026)Source 27Derived: Kanengo 40 MWh (commissioned 24 July 2026) plus Golomoti 10 MWh (since March 2022). ESCOM described Kanengo as 30 MWh in January 2026, but the Ministry of Energy gave 40 MWh at commissioning.

Batteries are being used to tackle Malawi’s supply gap at the evening peak. Kanengo stores daytime solar and off-peak hydro energy for release in the evening, and provides fast frequency response for a small system with low inertia. The Ministry described it as the largest battery in Southern Africa when it was commissioned. ESS News, citing the Africa Solar Industry Association, reported a further 92.5 MWh of battery projects in development. A battery centre of excellence is planned at Mzuzu University.

There is no specific licence or market for storage. Grid-scale facilities are owned or contracted by ESCOM and must meet the Grid Code requirements for unconventional facilities, which were amended in January 2025 to include battery storage. Home batteries fall under ordinary installation permits.

Storage projects.

  • Kanengo BESS, Lilongwe: 20 MW / 40 MWh standalone utility battery, commissioned 24 July 2026. Implemented by ESCOM with about US$20 million of GEAPP grant funding, for peak shifting, frequency regulation and integrating solar.
  • Golomoti Solar and BESS, Dedza: 28.5 MWp / 20 MWac solar plant with a 5 MW / 10 MWh lithium-ion battery, in commercial operation since March 2022, developed by JCM Power and InfraCo Africa.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
ESCOM (Electricity Supply Corporation of Malawi)Sole grid retailer (100% of grid customers)NoLimitedNoLimited

There is no supplier choice. ESCOM supplies every grid-connected home and business at MERA-approved tariffs. Time-of-use rates are available only to maximum-demand customers, and net metering is the only export arrangement. Off-grid solar companies sell systems under MERA renewable-energy technology licences, but they do not sell grid electricity.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of EnergyGovernmentEnergy policy, National Energy Compact, IRP and IPP frameworkSets the direction for access targets, generation procurement and power-sector reform.
Malawi Energy Regulatory Authority (MERA)RegulatorLicensing, tariffs, Grid Code, net metering, installer permitsEvery licence, tariff, installer permit and net-metering rule comes from MERA.
ESCOM LimitedDistributionTransmission, distribution, single buyer and system and market operatorConnects, meters and bills all grid customers and processes net-metering applications.
ESCOM System and Market OperatorTransmissionReal-time operation of the Interconnected Power SystemRuns dispatch, reserves and load shedding.
Power Market Limited (PML)MarketState company being re-established as single buyerApplied with ESCOM in May 2026 to take over the single-buyer licence, and involved in the MOMA import arrangements.
Electricity Generation Company (Malawi) Limited (EGENCO)Renewable EnergyState generator (hydro, diesel, solar)Owns most of the country’s generating capacity and publishes generation status updates.
Southern African Power Pool (SAPP)MarketRegional power poolMalawi can trade through SAPP for the first time after the MOMA interconnector.
Malawi Bureau of Standards (MBS)GovernmentNational standards bodyPublishes the Malawi Standards (MS) referenced in the net-metering and Grid Code requirements.
Renewable Energy Industries Association of Malawi (REIAMA)SolarTrade association for renewable-energy businessesRepresents solar importers and installers on tax and regulatory issues.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (transmission and large plant)Malawi Grid Code, Amendment 004 (January 2025)MERACovers connection, operation, ancillary services and metering. Amendment 004 renamed section 8 “Unconventional” and extended it to battery storage alongside renewable power plants.
Distributed generation / net meteringMalawi Net Metering Rules (2024, published January 2025)MERASize limits, feeder screening (15% of line-section peak, 10% fault-current contribution, 20 kVA on shared single-phase secondaries), metering and billing rules.
Distribution connectionMalawi Distribution CodeMERASets quality of supply at the point of connection and the commissioning tests for net-metered systems (referenced in the Net Metering Rules, section 7.14).
Power quality / EMCMS 1260-4-30 and MS 1260-30Malawi Bureau of StandardsCited in the Net Metering Rules for electromagnetic compatibility and power-quality measurement, and for the 3% voltage-imbalance limit.
WiringMalawi wiring and installation standardMERANew national standard for new and modified electrical installations, introduced to stakeholders in March 2025.
InspectionInspectors Guidelines (January 2025)MERAGuidance for inspectors of electrical installations, published with the net-metering rules.
Anti-islandingNet Metering Rules, rule 10MERASystems may island only to supply the customer’s own load, and need a visible, lockable manual disconnect that the distribution licensee can reach.
Installer accreditationElectrical Installation Permit (Electricity By-laws 2012, amended 2018)MERAAnnual permits in classes A–D. Net-metered systems may be installed and maintained only by certified installers.
Prepaid meteringSTS (Standard Transfer Specification) prepayment tokensSTS Association / ESCOMAll ESCOM prepaid meters were reprogrammed for the token-identifier rollover in 2023–24.

Permissions.

Permissions.
PermissionRequiredLevelDetail
ESCOM net-metering approval and interconnection agreementYesNationalNeeded for any system that exports. Covers screening, commissioning and a bidirectional meter.
MERA private-generation registrationLimitedNationalRequired for net-metered systems and for any own-use plant of 20 kVA or more. Renewed annually.
Work by a MERA-permitted electrical installerYesNationalAll electrical and renewable installation work must be done by a permit holder.
MERA generation licenceLimitedNationalNeeded only to sell electricity, for example a solar farm or a mini-grid selling to customers.
Environmental and social impact assessmentLimitedNationalRequired for utility-scale generation projects (Malawi Environmental Protection Authority), not for household rooftops.
Building approvalLimitedLocalLocal council building approvals apply to new structures and larger projects. No specific planning rules for household rooftop solar were identified.

For a household, the practical steps are an installer with a MERA permit, MERA registration if the system exports or is 20 kVA or larger, and ESCOM approval for anything connected in parallel with the grid. Off-grid systems below 20 kVA, which are the large majority of solar installations in Malawi, need only a competent permitted installer. Utility-scale projects need a MERA licence, environmental approval, land agreements and an investment certificate from the Malawi Investment and Trade Centre.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
VAT and import-duty relief on solar productsActiveTax reliefThe 2019/20 budget removed VAT on solar panels, batteries, inverters, chargers, lamps and bulbs, and import duty and excise were also removed. The Malawi Revenue Authority confirmed in 2021 that solar products carry no import duty or excise and are zero-rated for VAT. The industry association has repeatedly reported problems with how this is applied at the border. No repeal was identified.Since September 2019
Net meteringActiveNet meteringBill credits for renewable exports by ESCOM customers, up to the supply-breaker rating and 500 kVA, valued at the energy component of the tariff and rolled forward each month. ESCOM’s implementation project started on 11 May 2026.Rules published January 2025; ESCOM project from May 2026
ASCENT Malawi energy access programmeActiveSubsidised connections and off-grid solarWorld Bank-supported programme (US$245.8 million IDA plus US$5 million ESMAP) financing last-mile grid connections, off-grid solar systems, electricity for schools and health facilities, and clean cooking. ESCOM targets 235,000 new connections.Five years from 2026
Malawi Electricity Access Project (MEAP)ClosedSubsidised connectionsWorld Bank-funded connection programme that delivered 191,250 household connections against a target of 180,000.Ended 31 December 2025
Priority-industry incentives for power generationActiveDuty waiver / tax holidayElectricity generation can qualify for priority-industry status, which gives import-duty waivers on equipment and corporate tax holidays. A 2024 legal guide notes that eligibility depends on majority Malawian ownership.—

Data and connectivity.

Fixed broadband
18 % of population using the internet (End 2025)Source 414.02 million internet users at the end of 2025; this is internet use, not fixed-broadband subscriptions.
4G coverage
87 % population coverage (2025)Source 42GSMA reports that about 80% of Malawians remain offline despite this coverage. Unique mobile-internet penetration was 12.5%.
5G coverage
Not identified from a reliable public source.

Mobile networks cover most of the population: 14.1 million cellular connections were active in late 2025, equal to 63% of the population. Actual internet use is low: GSMA puts unique mobile-internet penetration at 12.5% and smartphone adoption at 33%. About 75% of adults use mobile money, which is the main way households pay for prepaid electricity tokens and pay-as-you-go solar.

ESCOM’s prepaid meters do not communicate. The utility’s subsidiary Optic Fibre Communications (OFC) runs fibre along the power network and sells capacity to mobile operators and internet providers, giving the utility a telecoms backbone for future grid and metering digitalisation.

Grid conditions.

National peak demand
0.396 GW (2024)Source 34Evening peak reported by ESCOM at 18:30 in October 2024, against 370 MW available. This is served demand; suppressed demand is higher because of load shedding and low access.
Annual electricity demand
2.224 TWh (2023)Source 10IRENA national electricity generation in 2023, used as a proxy for annual demand (imports were negligible before MOMA). ESCOM sold 1,671.5 GWh in 2022, according to the NSO.
Generation capacity
0.653 GW (2024)Source 10IRENA total installed capacity, 520 MW of it renewable. The National Energy Compact gives 550 MW (398 MW hydro, 101 MW solar, 52 MW diesel). Available capacity is much lower because of derated hydro units.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The grid has too little firm capacity at the evening peak. In August 2026 EGENCO reported Nkula B unit 6 (20 MW) out of service, Nkula A running at 24 MW instead of 35.1 MW, Tedzani units 5 and 6 limited to 5 MW by debris, and Kapichira unit 3 derated by 6 MW. Repairs were scheduled from late 2026 to the end of 2027. Diesel standby units were also awaiting spare parts.

The MOMA interconnector, the Kanengo battery and new solar plants are expected to ease shortages. MOMA is a 218 km, 400 kV line from Matambo in Mozambique to Phombeya in Balaka. Later projects include a 400 kV Tanzania–Malawi interconnector and the 132 kV Eastern and 400 kV Western backbone lines named in the National Energy Compact. ESCOM publishes a load-shedding programme and outage notices by region.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Single-buyer licence transfer from ESCOM to Power Market LimitedUpcomingApplied for 22 May 2026Following a government decision to re-establish PML, ESCOM and PML applied to MERA to transfer the licence for buying and selling electricity to all licensees in and outside Malawi. Objections were invited for 30 days, and the outcome had not been confirmed by October 2026.
Commercial power trading over the MOMA interconnectorUpcomingEnergised 8 August 2026; commercial start pendingThe 400 kV line was energised with a 5 MW test import to commission metering at Matambo. The Ministry, ESCOM, PML and EDM were finalising tariffs before commercial imports begin, with 50 MW of firm power contracted.
Fourth tranche of the 2023–2027 base tariffUpcomingWithin the 2023–2027 tariff periodMERA approved a final 9% increase in the average tariff, which applies only if ESCOM and EGENCO meet their key performance indicators.
Update of the 2017 IPP frameworkUpcoming2026 (National Energy Compact)The government committed to review the IPP pipeline and update the framework, including competitive tenders for solar and wind and protection of IPPs against currency risk.
Net metering roll-outCurrentRules January 2025; ESCOM project from 11 May 2026First legal route for ESCOM customers to export renewable power, using bill credits valued at the energy component of the tariff.
Kanengo battery commissionedCurrent24 July 2026A 20 MW / 40 MWh standalone utility battery in Lilongwe, the country’s first, adds peak capacity and frequency control.
Grid Code Amendment 004CurrentJanuary 2025Extended the Grid Code’s unconventional-plant section to battery storage facilities as well as renewable power plants.
Third base-tariff trancheCurrent19 January 2026A 12% rise took ET1 domestic prepaid to MK79.90/kWh (first 50 kWh) and MK122.25/kWh (above 50 kWh).

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowGrid-connected rooftop solar could legally export only from 2025–26, and no installed net-metering capacity is published. Off-grid solar products reach about 12% of the population (solar lighting, lanterns and home systems, National Energy Compact 2024).
Distributed energy marketLowThere is no aggregation framework, net metering is limited to bill credits, and grid access is 11.3% of the population. Distributed energy is mostly off-grid.
Grid flexibility marketLowThe Grid Code states that ancillary services are not currently on the market. The single buyer is the only counterparty, and shortfalls are handled by load shedding.
Energy storage adoptionMediumAbout 25 MW / 50 MWh of grid batteries (Kanengo and Golomoti) on a system of roughly 650 MW installed capacity, with a further 92.5 MWh reported in development. There are no data on home storage.
Renewable growth environmentMediumIRENA records solar capacity growth of more than 2,600% from 2019 to 2024, reaching 109 MW. Hydro additions are slow, and the large hydro pipeline (Mpatamanga) is years from operation.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 42 sources
  1. 2018 Malawi Population and Housing Census – Main Report. National Statistical Office of Malawi, 2019. accessed 1 October 2026.
  2. Malawi in Figures 2023. National Statistical Office of Malawi, 2023. accessed 1 October 2026.
  3. Electricity Tariff Schedule with effect from 19th January 2026. ESCOM Limited, 2026. accessed 1 October 2026.
  4. Tariffs and Charges. ESCOM Limited, 2026. accessed 1 October 2026.
  5. MERA Moderates Implementation of a New Electricity Base Tariff. Malawi Energy Regulatory Authority, 2023. accessed 1 October 2026.
  6. Escom moves to relinquish electricity buying licence. The Nation (Nation Online), 2026. accessed 1 October 2026.
  7. Advertising notice: application for a single buyer licence by ESCOM in conjunction with Power Market Limited. Malawi Energy Regulatory Authority, 2026. accessed 1 October 2026.
  8. Major exchange rates (2 October 2026). Reserve Bank of Malawi, 2026. accessed 1 October 2026.
  9. National Energy Compact for Malawi (Mission 300). Government of Malawi / World Bank, 2025. accessed 1 October 2026.
  10. Energy Profile: Malawi. IRENA, 2025. accessed 1 October 2026.
  11. Malawi Net Metering Rules (January 2025). Malawi Energy Regulatory Authority, 2025. accessed 1 October 2026.
  12. MERA Engages Stakeholders on Electrical Inspections, Standards and Net Metering. Malawi Energy Regulatory Authority, 2025. accessed 1 October 2026.
  13. Malawi Grid Code, Amendment 004 (version 4). Malawi Energy Regulatory Authority, 2025. accessed 1 October 2026.
  14. How to Apply – application forms, codes and guidelines. Malawi Energy Regulatory Authority, 2026. accessed 1 October 2026.
  15. Renewal of Electrical Installations Permits and Private Electricity Generation Certificates for the year 2024. Malawi Energy Regulatory Authority, 2023. accessed 1 October 2026.
  16. Renewed electrical installations permits as at 31 July 2026. Malawi Energy Regulatory Authority, 2026. accessed 1 October 2026.
  17. Advertising notice: application for electricity generation licence by EGENCO (10 MW solar, Salima). Malawi Energy Regulatory Authority, 2026. accessed 1 October 2026.
  18. Single Buyer Mandate. ESCOM Limited, 2026. accessed 1 October 2026.
  19. System and Market Operator (SMO) Licensee. ESCOM Limited, 2026. accessed 1 October 2026.
  20. Distribution Licensee. ESCOM Limited, 2026. accessed 1 October 2026.
  21. New Connection Application. ESCOM Limited, 2026. accessed 1 October 2026.
  22. Frequently Asked Questions. ESCOM Limited, 2026. accessed 1 October 2026.
  23. Tokens (token history by meter number). ESCOM Limited, 2026. accessed 1 October 2026.
  24. ESCOM Token Identifier (TID) Project Rolls out 358,947 Prepaid Meters. ESCOM Limited, 2024. accessed 1 October 2026.
  25. ESCOM Hits 30% in Prepaid Meter Migration. ESCOM Limited, 2026. accessed 1 October 2026.
  26. Escom unveils maximum demand prepaid meters. The Daily Times (via CONREMA), 2020. accessed 1 October 2026.
  27. Malawi Commissions Southern Africa’s Largest Battery Energy Storage System. Ministry of Energy, Malawi, 2026. accessed 1 October 2026.
  28. BESS Project Takes Shape, Batteries Arrive. ESCOM Limited, 2026. accessed 1 October 2026.
  29. Malawi inaugurates first battery storage system. ESS News, 2026. accessed 1 October 2026.
  30. Golomoti project, Malawi. JCM Power, 2026. accessed 1 October 2026.
  31. Status of Power Generation in Malawi. EGENCO, 2026. accessed 1 October 2026.
  32. MOMA Project to Ease Load Shedding – Minister. ESCOM Limited, 2025. accessed 1 October 2026.
  33. Govt moves closer to regional power. Malawi24, 2026. accessed 1 October 2026.
  34. Escom admits blackouts, says power demand high. The Nation (Nation Online), 2024. accessed 1 October 2026.
  35. ASCENT – Accelerating Sustainable and Clean Energy Access Transformation. ESCOM Limited, 2026. accessed 1 October 2026.
  36. Tax measures bring joy, pain. The Nation (Nation Online), 2019. accessed 1 October 2026.
  37. Renewable energy players warn of rising product prices. The Nation (Nation Online), 2021. accessed 1 October 2026.
  38. Malawi enacts 2026–27 budget, introduces VAT on digital services by foreign companies. RegFollower, 2026. accessed 1 October 2026.
  39. Consumers lament VAT on water, electricity. The Nation (Nation Online), 2017. accessed 1 October 2026.
  40. Renewable Energy Laws and Regulations: Malawi 2024. Lex Africa, 2024. accessed 1 October 2026.
  41. Digital 2026: Malawi. DataReportal, 2026. accessed 1 October 2026.
  42. 80% of Malawians remain offline despite coverage, new GSMA report highlights path to inclusive digital access. GSMA, 2026. accessed 1 October 2026.

Questions about energy in Malawi.