Energy-market overview

How electricity works in Saint Vincent and the Grenadines.

Saint Vincent and the Grenadines electricity 2026: state-owned VINLEC on separate island grids, diesel plus about 15% hydro, monthly fuel surcharge, solar micro-generator connections.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in East Caribbean dollar (XCD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Saint Vincent and the Grenadines energy at a glance.

Key figures for households in Saint Vincent and the Grenadines. Each one links to its source on the full overview below.

  • Renewable share.

    15% of electricity from renewable sources. Figures for 2021.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Saint Vincent and the Grenadines.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Saint Vincent and the Grenadines below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Saint Vincent and the Grenadines requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Saint Vincent and the Grenadines.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Saint Vincent and the Grenadines, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Saint Vincent and the Grenadines, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Saint Vincent and the Grenadines.

Full overview

The energy market in Saint Vincent and the Grenadines, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Electricity in Saint Vincent and the Grenadines is supplied by one company, St. Vincent Electricity Services Limited (VINLEC). The Government has owned all of it since 1 July 1985, when it bought the remaining 51% held by the Commonwealth Development Corporation. The Electricity Supply Act of 1973 gave VINLEC an exclusive licence to supply electricity. VINLEC generates, distributes, meters and bills, and reported just over 46,000 customers in March 2020, with service accessible to 98% of the population.

There is no single national grid. Mainland St. Vincent has its own network, fed by the Cane Hall and Lowmans Bay diesel stations and three run-of-river hydro stations at South Rivers, Richmond and Cumberland. Bequia, Canouan, Union Island and Mayreau each have their own power station. Hydro is the main renewable source: the World Bank put renewables at 15.0% of electricity output in 2021, and VINLEC describes its hydro stations as producing roughly 18–20% of annual generation. Small utility-owned solar plants and batteries operate at Cane Hall, Lowmans Bay, Union Island and Mayreau.

Because most electricity comes from imported diesel, bills include a fuel surcharge that VINLEC recalculates every month; in June 2026 VINLEC applied a subsidy to it. Customers can connect solar PV or small wind systems through VINLEC’s Renewable Energy Micro-Generator Grid Interconnection application. VINLEC is rolling out smart meters (AMR/AMI) in two phases, with prepaid metering planned, and has battery projects at Cane Hall (5 MW / 5 MWh) and on Bequia (1,500 kW) alongside a new Bequia power plant.

Energy snapshot.

Headline figures for electricity in Saint Vincent and the Grenadines. Each shows its data year and links to its source.

  • Population99,924 peopleSource 132025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (XCD)Not identified from a reliable public source.
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share15%Source 142021
  • Solar capacity0.001 GWSource 12026
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
No independent electricity regulator identified; energy sits with the Ministry of Health, Wellness, Environmental Health and Energy
System operator
St. Vincent Electricity Services Limited (VINLEC), which runs each island system
Distribution networks
Separate island networks on St. Vincent, Bequia, Canouan, Union Island and Mayreau, all owned and operated by VINLEC
Currency
East Caribbean dollar (XCD)
Voltage and frequency
Not verified from an official source read for this profile (VINLEC offers single-phase and three-phase connections)

Electricity prices in Saint Vincent and the Grenadines.

Household price (XCD)
Not identified from a reliable public source.
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

Every customer pays VINLEC, the only supplier, under one rate structure. The bill has two energy elements: a base rate covering VINLEC’s non-fuel costs, and a fuel surcharge that passes through the cost of the diesel burned in its power stations. The fuel surcharge is recalculated every month and published on VINLEC’s website, so bills move with world oil prices.

The Government has stepped in to dampen the surcharge in periods of high oil prices. VINLEC press releases record funds injected to lower the June 2022 surcharge, no VAT on July 2022 bills for residential customers using less than 250 units, and a subsidy applied to the surcharge on June 2026 bills. A PetroCaribe arrangement was also reported to affect the surcharge in 2023.

Other charges

VINLEC’s published service charges are EC$20.00 to reconnect a disconnected service (plus EC$3.00 VAT), EC$2.50 for a customer-requested meter test and EC$20.00 to move a service line. New customers pay a security deposit of up to two months’ estimated gross bill, which earns 2% interest a year and is reviewed at least every three years.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesVINLEC charges a single schedule of rates (its “Service and Utility Rate Structure”) for each customer class across all islands. The current base energy rates are not published in a form that could be read for this profile.
VariableYesA fuel surcharge is added to every unit and recalculated monthly; VINLEC posts a notice for each month (January–September 2026) and annual summaries for 2023–2025. Press releases record a higher surcharge on April 2026 bills, a government-funded subsidy applied to the rate on June 2026 bills, and an update for July 2026 bills.
PrepaymentNoNot yet offered. VINLEC says its smart-meter project will enable enhanced services such as prepaid metering.
Time-of-useNoNo time-of-use or dynamic tariff was identified.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Detailed household consumption statistics for Saint Vincent and the Grenadines are published in VINLEC’s annual reports and the 2023 census report, neither of which could be read for this profile, so no household figures are given. The World Bank records 100% of the population with access to electricity in 2024; VINLEC itself describes its service as accessible to 98% of the population.

Demand is spread across several separate systems. Mainland St. Vincent accounts for most of it; the Grenadine islands are much smaller loads: VINLEC lists about 2,500 customers on Bequia, just over 1,000 on Canouan, just over 1,200 on Union Island and 134 on Mayreau.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
48% (2025)Source 13World Bank: 47.98% of the population.

The World Bank classes just under half of the population (48.0%) as urban, with the rest in rural villages on St. Vincent and on the Grenadine islands. Housing tenure and dwelling-type figures from the 2023 Population and Housing Census are published by the Statistical Office in a report that could not be read for this profile, so they are left blank here.

How the grid works in Saint Vincent and the Grenadines.

  1. TransmissionSt. Vincent Electricity Services Limited (VINLEC)
  2. DistributionSeparate island networks on St. Vincent, Bequia, Canouan, Union Island and Mayreau, all owned and operated by VINLEC
  3. MeteringVINLEC
  4. Supply1 or more retail suppliers

Physically, the system is a set of island grids. On mainland St. Vincent, Lowmans Bay (17.4 MW, commissioned in 2007) supplies about 60% of the power generated and Cane Hall (19.66 MW, opened in 1976) most of the rest. They are supported by three run-of-river hydro stations: South Rivers (870 kW, first opened in 1952), Richmond (1,100 kW, 1962) and Cumberland (3,650 kW, 1987). Richmond and South Rivers reopened in 2018 after rehabilitation, and VINLEC has announced that it will decommission the Cumberland 3 hydro station. Small solar plants operate at Cane Hall (224 kWp) and Lowmans Bay (370 kWp).

The Grenadines have their own diesel stations: Bequia (4,145 kW, about 2,500 customers), Canouan (4,040 kW, just over 1,000 customers) and Union Island (just over 1,200 customers, with a 600.3 kWp PV plant and battery opened in 2019). Mayreau, with 134 customers, runs on a solar-diesel hybrid with batteries installed in 2019. After Hurricane Beryl in 2024, VINLEC issued estimated July 2024 bills, waived the June bill for customers on Canouan, Mayreau and Union Island, and restored the southern Grenadines networks with help from regional linesmen and Cuban teams, who assisted in rebuilding the Union Island network.

Commercially there is no market. VINLEC, owned by the Government, generates, distributes and sells to every customer under its exclusive licence, and passes fuel costs through a monthly surcharge. No independent power producers or separate electricity regulator were identified in the sources read for this profile.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Health, Wellness, Environmental Health and EnergyThe government ministry whose portfolio includes energy, as listed on the Government of Saint Vincent and the Grenadines portal. It is responsible for energy policy; VINLEC is a state-owned company.
TSOSt. Vincent Electricity Services Limited (VINLEC)Owns all generation and network assets and runs each island system. Its Transmission and Distribution Department manages the networks and its Generation Department the power stations.
DSOVINLECOwns and operates the distribution networks on St. Vincent, Bequia, Canouan, Union Island and Mayreau, and every service connection.
SupplierVINLECSole supplier under the exclusive licence given by the Electricity Supply Act 1973; just over 46,000 customers in March 2020.
MeteringVINLECOwns, installs and reads all meters and is replacing them with AMR/AMI smart meters.

Compared with the UK system.

Compared with the UK system.
UK conceptSaint Vincent and the Grenadines equivalentHow it works
DNOVINLECVINLEC owns and runs the network on every inhabited island it serves, as well as generating and supplying. There are no separate distribution companies.
National Grid/NESOVINLEC (per island system)There is no national transmission grid linking the islands and no independent system operator. VINLEC dispatches the mainland St. Vincent system and each Grenadine island system separately. There are no interconnectors with other countries.
MPANVINLEC Customer ID and Location ID numbersVINLEC records each connection under a Customer ID number (the account holder) and a Location ID number (the service location), together with the meter number and the nearest VINLEC pole number. These are utility-internal references, not a national standard.
MPRNNo equivalentThere is no piped gas network.
Meter operatorVINLECThe utility owns and maintains every meter. Customers can request a meter test for EC$2.50.
SupplierVINLEC (sole supplier)Customers cannot switch supplier; the Electricity Supply Act 1973 gave VINLEC an exclusive licence to supply electricity.
Smart-meter infrastructureVINLEC smart meter project (AMR/AMI)Unlike the UK’s DCC model, the meters, communications and data all belong to VINLEC. There is no national data hub or regulated third-party access.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?VINLEC Customer ID number and Location ID number (with meter number)
Who issues it?St. Vincent Electricity Services Limited (VINLEC)
FormatUtility-assigned numeric references; VINLEC does not publish their structure and no national standard format exists
LengthNot publicly documented
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the VINLEC electricity bill and in VINLEC’s online “Check Your Bill” (Click2Gov) portal; the meter number is on the meter, and the nearest pole carries a VINLEC pole number.
Electronic accessCustomers can view bills online through VINLEC’s Click2Gov customer portal and receive e-bills; VINLEC says phase 2 of its smart-meter project will give customers real-time access to their usage.
Third-party accessNo regulated scheme gives installers, aggregators or other parties access to customer or meter data. A solar installer supplies the customer’s VINLEC identifiers on the micro-generator interconnection application.
Who keeps the registerVINLEC’s own customer information and billing system; there is no independent national register.
Register scopeNational

Saint Vincent and the Grenadines has no supply-point number in the UK sense. VINLEC is the only supplier, so there is no switching and no need for a standard identifier that other companies can read. Instead, VINLEC’s own records identify each connection in two ways: a Customer ID number for the account holder and a Location ID number for the service location.

VINLEC’s Renewable Energy Micro-Generator Grid Interconnection application shows how these are used in practice. It asks for the VINLEC account name, Customer ID number, Location ID number, meter number and the number of the VINLEC pole closest to the site. Separating customer and location suggests that the location reference describes the premises while the customer reference follows the account holder. VINLEC does not publish how the numbers are structured, or whether a Location ID is kept when occupiers change, so no example is given here.

Meters belong to VINLEC. A customer can ask for a meter test for a fee of EC$2.50. Under the smart-meter project, phase 1 moves to automated reading with consistent billing periods. Phase 2 adds real-time usage information for customers and faster outage management.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidNot identified from a published source: VINLEC accepts grid interconnection of customer micro-generators, but the credit or purchase rate for exported energy is not stated on its web pages
Which technologies can connect?VINLEC’s micro-generator application covers wind turbines and solar PV, as new installations, extensions, replacements or component add-ons.
Is there a size limit?The application asks for capacity in kW, but no published size limit was identified in the sources read for this profile.
What technical evidence is required?A single-line diagram, earthing arrangements, generator and inverter specifications, and an inverter test certificate or test results.
How is exported energy paid for?Not identified. VINLEC’s web pages do not state a net-metering, net-billing or buy-back rate.

Connecting a home system.

  1. Choose an installer and design the system (solar PV or small wind turbine) with an inverter for single-phase or three-phase connection.
  2. Complete VINLEC’s Renewable Energy Micro-Generator Grid Interconnection Application, giving the VINLEC Customer ID, Location ID, meter number and nearest pole number, installer details and system data.
  3. Enclose the electrical single-line diagram, existing and proposed earthing (grounding) arrangements, generator and inverter specifications, and the inverter test certificate or results.
  4. VINLEC reviews the application before the system is connected; the same form is used for extensions, replacements and add-ons to existing systems.

Households and businesses can connect small renewable generators to VINLEC’s network by applying through its micro-generator interconnection process. The form asks for the inverter test certificate, earthing details and a single-line diagram, so VINLEC can check that the system will be safe on a small island grid before connecting it.

What VINLEC pays or credits for exported energy is not published on its website, so this profile cannot say whether customers are on net metering or net billing. Anyone planning a system should get the current terms from VINLEC before installing.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Supply electricity to customersExclusive licence held by VINLEC under the Electricity Supply Act 1973Electricity Supply ActNo retail competition.
Generate electricity for the grid (utility scale)No published third-party licensing route identified; all identified grid generation is owned by VINLECGovernment / VINLECThe scope of VINLEC’s exclusivity over generation could not be confirmed from the Act text for this profile.
Small-scale self-generation with grid connectionVINLEC approval through the Renewable Energy Micro-Generator Grid Interconnection application; no published size threshold identifiedVINLECCovers solar PV and wind micro-generators.
Store electricityNo specific licensing regime identified—Utility batteries are owned by VINLEC; no rules for customer batteries were found.
Transmit and distributeCarried out only by VINLECElectricity Supply Act / VINLECNo third-party network operators.
Aggregate, trade, wholesale, balancing, grid services or VPPNo market or licence category exists—VINLEC balances each island system internally.
Remote control of customer assetsNo framework identified—No demand-response or remote-dispatch arrangements for customer devices were found.

The legal basis of the sector is the Electricity Supply Act of 1973, which gave VINLEC an exclusive licence to supply electricity. Because the Government owns VINLEC outright, ownership, policy and operation are closely linked, and no separate electricity regulator or tariff-setting commission was identified in the sources read.

For a household or business, the practical requirement is VINLEC’s approval to interconnect a micro-generator. No published licensing regime for storage, aggregation, trading or flexibility services was found.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Ancillary services / frequency controlNo—NoVINLEC. Provided internally by VINLEC’s diesel, hydro and battery assets on each island; no market for third parties.
Demand responseNo—NoVINLEC. No demand-response programme was identified.

There is no wholesale, balancing or flexibility market in Saint Vincent and the Grenadines, and no route for customer-owned batteries or other distributed assets to be paid for grid services. The utility’s own batteries, at Union Island, Mayreau and in the Cane Hall and Bequia projects, are used to support its isolated systems.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutVINLEC smart meter project (AMR/AMI) under way in two phases; coverage not published; prepaid metering planned
Reading intervalNot published
Meter ownerVINLEC
TechnologyAutomatic Meter Reading (AMR) and Advanced Metering Infrastructure (AMI)
Phase 1Faster data collection and consistent billing periods
Phase 2Real-time usage information for customers; faster outage management
Planned servicePrepaid metering
Cost to customerNo change to rates and no additional fees

VINLEC runs the smart-meter programme itself, with no national data hub or separate meter operators. Its project page describes replacing meters with AMR and AMI technology in two phases: the first to speed up data collection and make billing periods consistent, the second to give customers real-time access to their usage and to speed up outage response. VINLEC says the new meters bring no change in rates and no additional fees, and will allow services such as prepaid metering. Meter numbers, reading intervals and coverage are not published.

Renewable electricity.

Electricity generation mix (2021).

  • Oil (diesel): 85%
  • Hydro and solar: 15%
Source 14
Renewable electricity share
15% (2021)Source 14World Bank indicator “Renewable electricity output (% of total electricity output)”, 15.02% in 2021, the latest year published. VINLEC states that its hydro stations produce approximately 18–20% of electricity generated annually. The grids are isolated, so generation and consumption shares are the same.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro (South Rivers, Richmond, Cumberland)
5.62 MW (2026)Source 1Derived: 870 kW + 1,100 kW + 3,650 kW nominal. VINLEC has announced the decommissioning of the Cumberland 3 station.
Solar PV (VINLEC-owned)
1.19 MWp (2026)Source 1Derived: Cane Hall 224 kWp + Lowmans Bay 370 kWp + Union Island 600.3 kWp; excludes Mayreau.
Diesel (Cane Hall, Lowmans Bay, Bequia, Canouan)
45.2 MW (2026)Source 1Derived: 19.66 + 17.4 + 4.145 + 4.04 MW; excludes Union Island and Mayreau diesel units, whose capacity is not stated.

Targets.

  • No current national renewable-electricity target could be verified from a source read for this profile.

Hydro power has been part of the mainland system since South Rivers opened in 1952, and the three run-of-river stations remain the largest renewable source. The World Bank series puts renewable electricity at 15.0% of output in 2021, while VINLEC describes its hydro stations as producing approximately 18–20% of annual generation; the exact share varies with rainfall. VINLEC rehabilitated Richmond and South Rivers, reopening them in 2018, but plans to decommission the Cumberland 3 station.

Solar is small and mostly utility-owned: a 177 kW grid-tied system at the Cane Hall Engineering Complex (2013), with 224 kWp of PV now listed at Cane Hall, the 370 kWp Lowmans Bay plant (2014), the 600.3 kWp Union Island plant with battery storage (2019) and the Mayreau solar microgrid, tested in 2020. Customer-owned systems connect through VINLEC’s micro-generator interconnection process.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Batteries in Saint Vincent and the Grenadines are owned by VINLEC and used to support isolated island systems. The Grenadine microgrids on Union Island and Mayreau combine solar with batteries, and the Cane Hall and Bequia projects add storage to the mainland and Bequia systems. No arrangements for customer-owned batteries to provide grid services were found.

Storage projects.

  • Cane Hall 5 MW / 5 MWh BESS (VINLEC): Battery energy storage project at Cane Hall on the mainland grid, listed among VINLEC’s projects.
  • Bequia power station project (VINLEC): New power plant, administrative building and 1,500 kW battery energy storage system at Ocar, Bequia; a community meeting on the environmental and social impact assessment was held on 23 March 2024.
  • Union Island solar PV and battery: 600.3 kWp PV plant with battery storage, officially opened in 2019.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
St. Vincent Electricity Services Limited (VINLEC)100% (sole supplier)NoNoNoUnknown

VINLEC is wholly owned by the Government and is the only electricity supplier on every island it serves. It employs just over 300 staff in eight departments.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Health, Wellness, Environmental Health and EnergyGovernmentMinistry responsible for energyEnergy falls within its portfolio.
St. Vincent Electricity Services Limited (VINLEC)DistributionState-owned integrated utilityGenerator, network owner, system operator, meter operator and sole supplier; publishes monthly fuel surcharge rates and handles micro-generator interconnection.
Statistical Office of Saint Vincent and the GrenadinesGovernmentNational statisticsPublishes population estimates and the 2023 Population and Housing Census.
Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE)Renewable EnergyCARICOM energy centrePublishes an Energy Report Card for Saint Vincent and the Grenadines (2022 edition).

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Distributed generation interconnectionVINLEC Renewable Energy Micro-Generator Grid Interconnection applicationVINLECRequires inverter specifications and an inverter test certificate or results, earthing arrangements and a single-line diagram; the specific inverter standards required are not stated on the form.
Supply legislationElectricity Supply Act 1973Parliament of Saint Vincent and the GrenadinesGave VINLEC its exclusive licence to supply electricity.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Utility interconnection approvalYesNationalGrid-connected PV or wind systems need VINLEC’s approval through its micro-generator interconnection application.
Generation licence (rooftop)UnknownNationalNo published licensing requirement or exemption for small systems was identified.
Planning permissionUnknownNationalNo specific published rule for rooftop solar was identified.

For a household, the gatekeeper is VINLEC, which reviews the interconnection application and the technical documents. No other published permitting rules specific to rooftop solar were found in the sources read for this profile.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Fuel surcharge subsidy (June 2026 bills)ClosedBill subsidyVINLEC applied a subsidy to the fuel surcharge rate on June 2026 bills. Whether further subsidies apply depends on later government decisions.June 2026 bills

Data and connectivity.

Fixed broadband
29.5 fixed subscriptions per 100 people (2024)Source 15World Bank (ITU) indicator IT.NET.BBND.P2: 29.46. 76.2% of people used the internet in 2024.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband subscriptions were about 29 per 100 people in 2024 and around three-quarters of people use the internet. VINLEC does not publish the communications technology used by its AMR/AMI meters or any open interface for third-party devices.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
0.052 GW (2026)Source 1Derived lower bound: 45.2 MW of listed diesel + 5.62 MW hydro + 1.19 MWp solar. Excludes Union Island and Mayreau diesel units and the Mayreau solar plant, whose capacities are not stated.
Interconnection
0 GWSource 1Each island has its own power station; no links between islands or with other countries.
Curtailment
Not identified from a reliable public source.

Each island system is small and isolated, so reliability depends on local plant. Hurricane Beryl in 2024 showed the exposure of the southern Grenadines, where VINLEC rebuilt networks with help from regional and Cuban linesmen. In 2021 VINLEC issued notices on electricity service and bills for customers north of the Rabacca Dry River and announced that it was forgiving electricity charges. Hydro output on the mainland depends on rainfall.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Smart meter rollout (AMR/AMI)Current2026 (in progress)VINLEC is replacing meters in two phases, enabling consistent billing periods, real-time usage data and, later, prepaid metering.
New Bequia power station with 1,500 kW batteryUpcomingNot publishedNew power plant, administrative building and battery storage at Ocar, Bequia.
Cane Hall 5 MW / 5 MWh batteryUpcomingNot publishedBattery energy storage project on the mainland grid.
Decommissioning of Cumberland 3 hydro stationUpcomingNot publishedAnnounced by VINLEC.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowInterconnection is available through a VINLEC application, but no published export payment or uptake figures; solar capacity identified is mostly utility-owned (about 1.2 MWp).
Distributed energy marketLowSingle state-owned utility; no published net-metering terms, aggregation or storage rules.
Grid flexibility marketLowNo wholesale, balancing, ancillary or demand-response market.
Energy storage adoptionLowUtility batteries on Union Island and Mayreau; Cane Hall (5 MW / 5 MWh) and Bequia (1,500 kW) projects; no data on home batteries.
Renewable growth environmentLowRenewable share about 15% (World Bank, 2021), mostly long-established hydro; solar additions since 2013 total about 1.2 MWp.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 17 sources
  1. Operations (power stations). St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  2. Our History. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  3. Historical Highlights. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  4. VINLEC Smart Meter Project. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  5. Monthly Fuel Surcharge Rate. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  6. Press Releases. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  7. Service Charge and Security Deposit. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  8. Renewable Energy Micro-Generator Grid Interconnection Application. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  9. Details on the Bequia Power Station. St. Vincent Electricity Services Limited, 2024. accessed 10 October 2026.
  10. Departments. St. Vincent Electricity Services Limited, 2026. accessed 10 October 2026.
  11. Ministries. Government of Saint Vincent and the Grenadines, 2026. accessed 10 October 2026.
  12. Statistical Office – home page (population estimate, 2023 Census report). Statistical Office of Saint Vincent and the Grenadines, 2026. accessed 10 October 2026.
  13. World Development Indicators – St. Vincent and the Grenadines (population, urban share, internet use, electricity access, exchange rate). World Bank, 2025. accessed 10 October 2026.
  14. Renewable electricity output (% of total electricity output) – St. Vincent and the Grenadines. World Bank, 2021. accessed 10 October 2026.
  15. Fixed broadband subscriptions (per 100 people) – St. Vincent and the Grenadines. World Bank / ITU, 2024. accessed 10 October 2026.
  16. Euro foreign exchange reference rates (9 October 2026). European Central Bank, 2026. accessed 10 October 2026.
  17. 2022 Energy Report Card – St. Vincent and the Grenadines (resource page). Caribbean Centre for Renewable Energy and Energy Efficiency (CCREEE), 2024. accessed 10 October 2026.

Questions about energy in Saint Vincent and the Grenadines.

Talk to us about Olmack in Saint Vincent and the Grenadines.Tell us about your home, housing portfolio or school estate in Saint Vincent and the Grenadines. We'll explain what is possible there now.